D/Continuous Process Improvement Process Engineering Division Patrick Tierney 24FEB2015
Tobyhanna Army Depot zeroG Arm Implementation D/Continuous Process - - PowerPoint PPT Presentation
Tobyhanna Army Depot zeroG Arm Implementation D/Continuous Process - - PowerPoint PPT Presentation
Tobyhanna Army Depot zeroG Arm Implementation D/Continuous Process Improvement Process Engineering Division Patrick Tierney 24FEB2015 Installation Characteristics 1,296 Total Acres C4ISR Mission Area Reversionary Rights to 21K Acres DLA
SLIDE 1
SLIDE 2
Installation Characteristics
C4ISR Mission Area DLA Supply and Storage LOGSA Facility Integrated C4ISR Antenna and Range Radar Campus Regional Training Site - Maintenance
1,296 Total Acres Reversionary Rights to 21K Acres Total Value: $1.1B 2.4M SF Mission
61% Under One Roof 15% Efficiency Factor
SLIDE 3
Command & Control Communications Computers Avionics Surveillance Reconnaissance Missile Guidance & Control Intelligence
C4ISR Systems
JOINT C4ISR LOGISTICS PROVIDER
SLIDE 4
4
zeroG arm on jib
SLIDE 5
5
Original application for zeroG arm
SLIDE 6
6
zeroG arm being used with laser ablation equipment
SLIDE 7
Fume collector Laser head Model CL 1000 Laser Ablation System
SLIDE 8
8
Laser end effector being attached to zeroG gimble
SLIDE 9
9
SLIDE 10
10
TYAD fabricated tool interface attached to zeroG gimble
SLIDE 11