The River Future San Gabriel River Confluence with Cattle Canyon Creek Improvements Project (the Cattle Canyon Project) Collaboration Engaged Stakeholders Agency Leads Non-Profit Organizations USFS Pacific Southwest Research Station Regularly


slide-1
SLIDE 1

The River Future

San Gabriel River Confluence with Cattle Canyon Creek Improvements Project (the Cattle Canyon Project)

slide-2
SLIDE 2

Collaboration

Agency Leads

Watershed Conservation Authority (Local Public Entity / JPA)

&

Angeles National Forest & San Gabriel Mountains National Monument

Planning Team Consultants

BlueGreen Consulting

Landscape Architecture / Planning

Environmental Science Associates

Environmental Consulting

Engaged Stakeholders

Non-Profit Organizations USFS Pacific Southwest Research Station Regularly Agencies

slide-3
SLIDE 3

Camp Williams Camp Williams

Cattle Canyon Confluence

Coyote Flat / Parking Area Heaton Flat

Lower Canyon Upper Canyon

slide-4
SLIDE 4
slide-5
SLIDE 5
slide-6
SLIDE 6
slide-7
SLIDE 7
slide-8
SLIDE 8
slide-9
SLIDE 9
slide-10
SLIDE 10

Purpose & Need

  • Provide recreation facilities and infrastructure
  • High quality
  • Well-maintained
  • Safe
  • Accessible
  • Consistent with visitors’ expectations
  • Shift and concentrate recreational use to certain areas in
  • rder to minimize adverse effects over a broader area
  • Promote stewardship of public land by providing quality and

sustainable recreation opportunities that result in increased visitor satisfaction

slide-11
SLIDE 11

Purpose & Need

  • Allow for better management of the recreation resources
  • n the Forest
  • Improve riparian habitat conditions in certain areas and

make progress toward enhancing stream habitat conditions

  • Restoring vegetation
  • Minimizing invasive plants and noxious weed
  • Development of management strategies to regulate access
slide-12
SLIDE 12

History of the Project

2006 2008 2009 2012 Summer 2013 Summer 2014 Fall 2014 2015 2016/17

State Bond Freeze Inventory & Site Planning Outreach & Assessment ANF/WCA’s First Agreement Monument Establishment Student Investigation Initial Project Funding Environmental Review & Design Development

slide-13
SLIDE 13

Visitor Assessment

Lower Canyon Upper Canyon Principle Researchers: Robert Brown, Ph.D. California State University, San Marcos Jerrell Ross Richer, Ph.D. Goshen College

slide-14
SLIDE 14
slide-15
SLIDE 15
slide-16
SLIDE 16

LA County Park Needs Assessment

slide-17
SLIDE 17

50 100 150 200 250 300 Median Mean Median Mean Median Mean Median Mean Oaks Total Lower Canyon Upper Canyon Grand Total

2013 and 2014 Vehicle Count Comparisons

2014 2013

slide-18
SLIDE 18

Sustainable Site Access Model

Site Development Plan

slide-19
SLIDE 19

Option 1 – Focus: Public Access

  • Prioritize parking (417)
  • 16 access points
  • 4 new picnic facilities
  • Barriers added along road to improve

safety and detour river access Restoration a part of all 3 options:

  • Reduce impacts from informal trails
  • Protect seeps/springs
  • Preserve stream habitat in tributary

behind Oaks Picnic Area

  • Non-native vegetation removal

and/or riparian plantings

  • Phase out non-native “plantation”

tree plantings

Coyote Flat

slide-20
SLIDE 20

Option 2 – Focus: River Path

  • Continuous 1.5 mile “East Fork Scenic

Trail”

  • 14 improved access points
  • Loading/shuttle stops provided
  • Angled and perpendicular parking bays
  • Restoration (same as other options)

Confluence Area

slide-21
SLIDE 21

Option 3 – Focus: Low Development

  • Concentrate access
  • 8 improved access points
  • Parallel road side parking eliminated;
  • ff-road parking provided
  • Use maximized in lower canyon
  • Restoration (same as other options)

Coyote Flat

slide-22
SLIDE 22

Project Area Totals

Trailheads 4 Restrooms 10 Crosswalks 7 Designated Picnic Areas 6 East Fork Scenic Trails (mil.) 2.5 Interpretive Elements 4 River Access Points 6 USFS Visitor Kiosks 3 Bus/Shuttle Stops 3 Parking 270

Final Concept Site Plan

slide-23
SLIDE 23

Oaks Area

Draft Site Shown Plan: under represents parking areas

slide-24
SLIDE 24

Oaks Area

slide-25
SLIDE 25

Junction & Confluence Areas

slide-26
SLIDE 26

Coyote Flat, Overlook, & Firestation

slide-27
SLIDE 27

Coyote Flat, Overlook, & Firestation

slide-28
SLIDE 28

Heaton Flat

slide-29
SLIDE 29

Site Type Management

Proposed to be managed as a Day Use Only area

slide-30
SLIDE 30

Parking Distribution

Lower Canyon Parking Space Count: 169 Median Peak Use: ~120 Upper Canyon Parking Space Count: 101 Median Peak Use: ~140

slide-31
SLIDE 31

East Fork Trail Schematic

slide-32
SLIDE 32

Where We Are Today

Environmental Review Conceptual Development Report

slide-33
SLIDE 33

Scoping

Preparation of a joint EIS/EIR ANF & WCA seek comments on:

  • What environmental issues should be analyzed?
  • Are there alternatives that should be evaluated?
  • What mitigation measures would help avoid or minimize any

negative impacts? Public Meetings

Wednesday, November 16, 2016 6:00 p.m. to 8:30 p.m. Julia McNeill Senior Center 4100 Baldwin Park Boulevard Baldwin Park, California Saturday, November 19, 2016 11:00 a.m. to 1:30 p.m. Angeles National Forest Headquarters 701 North Santa Anita Avenue Arcadia, California

slide-34
SLIDE 34

Scoping

Comments must be received no later than November 30, 2016 For comments or information:

Rob Romanek, Project Manager Watershed Conservation Authority 100 N Old San Gabriel Canyon Road Azusa, California 91702 rromanek@wca.ca.gov (626) 815-1019 x108

Project website with NOI/NOP and full project description:

www.wca.ca.gov/cattle_canyon www.fs.usda.gov/projects/angeles/landmanagement/projects

Jeremy Sugden, Recreation Officer ANF, SGM National Monument 110 N Wabash Avenue Glendora, California 91741 jmsugden@fs.fed.us (626) 335-1251 x222

slide-35
SLIDE 35
slide-36
SLIDE 36

National Monument Access Planning Efforts

San Gabriel Mountains National Monument Access Plan

Agency Leads Proposed Project Steering Committee

  • Caltrans District 7
  • LA County MTA
  • LA County DPW
  • COGs
  • Foothill communities
  • Foothill Transit
  • EJ focused non-profits
  • ANF
  • SCAG
  • WCA

Southern California Association of Governments

slide-37
SLIDE 37

National Monument Access Planning Efforts

San Gabriel Mountains National Monument Access Plan This planning project will: 1) Initiate a collaborative process, including engagement and dialog among stakeholders; 2) Identify existing conditions; 3) Evaluate and prioritize opportunities; and 4) Develop an initial implementation strategy to create connections between the Monument and neighboring communities.

slide-38
SLIDE 38

Funding

Grant Application Due Early Next Month Caltrans Fiscal Year 2017-2018 Sustainable Transportation Planning, Sustainable Communities Grant Program SCAG as applicant: To contribute highly skilled and experience transportation planning staff to manage and guide the development of this access plan WCA as sub-applicant: To contribute project management (as a match), bring knowledge of natural resources and recreational planning, experience with public land management, and a well-established cooperative partnership with ANF Grant request: ~$270,000