The MINERA Operations Report Nuruzzaman (home.fnal.gov/~nur/) for - - PowerPoint PPT Presentation

the miner a operations report
SMART_READER_LITE
LIVE PREVIEW

The MINERA Operations Report Nuruzzaman (home.fnal.gov/~nur/) for - - PowerPoint PPT Presentation

The MINERA Operations Report Nuruzzaman (home.fnal.gov/~nur/) for the MINERvA Collaboration All Experimenters Meeting 30 April 2018 Live Time and Data q 04/18, 04/23-04/25 Low/0 efficiency because of the rawdata and corresponding


slide-1
SLIDE 1

Nuruzzaman

(home.fnal.gov/~nur/)

for the MINERvA Collaboration

The MINERνA Operations Report

30 April 2018

All Experimenters Meeting

slide-2
SLIDE 2

2

Live Time and Data

Nuruzzaman AEM - 30 Apr 2018

q 04/18, 04/23-04/25 – Low/0 efficiency because of the rawdata and corresponding rawdigits are not getting into the tape. There is a large backlog of files. Experts are working on it.

slide-3
SLIDE 3

3

Other Updates

Nuruzzaman AEM - 30 Apr 2018

q 04/23 Mon – MINOS magnet power supply failed early morning q 04/24 Tue – MINOS came back online in the afternoon

  • The contactor for the power ON button was broken we replaced the contactor,

and this fixed the trips at low currents.

  • The DCCT circuit board had at least one or more bad capacitors. Walt

replaced them and measured the currents and voltage drops which now looked good. After these fixes, we succeeded in bringing the power supply up to full current and has been running smoothly so far.

  • In addition, the ACnet script was turning the magnet on rapidly almost
  • instantaneously. It is fixed now and ramps the magnet correctly.

q 04/25 Wed – No beam

  • Replaced a MINDER board for MINOS with hot channels

Thanks Steve Hahn, Walt Jaskierny, Brian Hendricks, and Tyler Griffin!

slide-4
SLIDE 4

4

Computing

Nuruzzaman AEM - 30 Apr 2018

  • Average concurrent jobs are higher than quota (average quota is ~1600)

due to production job

  • Job success rate is 100%
  • Overall CPU efficiency is 41%
  • One user’s analysis job failed due to incorrect input file handling
  • Production GENIE (generator) stage still has low efficiency with a short job

duration (average of waste time is ~20min)

Period 04/23 - 04/29, 2018

slide-5
SLIDE 5

5

Thank You

AEM - 30 Apr 2018 Nuruzzaman