Briefing Briefing on on the the Resul Results ts of the of the - - PowerPoint PPT Presentation

briefing briefing on on the the resul results ts
SMART_READER_LITE
LIVE PREVIEW

Briefing Briefing on on the the Resul Results ts of the of the - - PowerPoint PPT Presentation

Briefing Briefing on on the the Resul Results ts of the of the Agency Action Agency Action Review Review Meeting Meeting Michael Johnson Deputy Deputy Executive Director Executive Director for R for Reactor eactor and Preparedness


slide-1
SLIDE 1

Briefing Briefing on

  • n the

the Resul Results ts

  • f the
  • f the Agency Action

Agency Action Review Review Meeting Meeting

Michael Johnson Deputy Deputy Executive Director Executive Director for R for Reactor eactor and Preparedness and Preparedness Progr Programs ams June 3, 2014

slide-2
SLIDE 2

Objectives

  • Review agency actions for material

and reactor licensees

  • Coordinate agency actions
  • Review Reactor Oversight Process

self-assessment

  • Review industry trends

2

slide-3
SLIDE 3

Licensed Activities Safe and Secure

  • Agency actions were appropriate for

licensees with significant performance issues

  • No significant adverse trends and no

significant adjustments recommended for the Materials and Waste Programs

  • No significant adverse trends and no

significant adjustments recommended for the Reactor Oversight Process

3

slide-4
SLIDE 4

Agenda

  • Materials and Waste Performance

Trends – Laura Dudes, FSME

  • Industry Trends Program and

Reactor Oversight Process Self- Assessment – Allen Howe, NRR

  • Reactor Licensee Discussions

–Browns Ferry – Victor McCree, RII –Fort Calhoun – Marc Dapas, RIV

4

slide-5
SLIDE 5

Ma Materials P terials Perf erfor

  • rmance T

mance Trends ends

Laura Dudes, Director Division of Materials Safety and State Agreements FSME

5

slide-6
SLIDE 6

Performance Evaluation Process

  • Systematic review to identify

significant:

– Operational performance trends – Licensee performance issues – NRC program issues/gaps

6

slide-7
SLIDE 7

Performance Criteria

  • Strategic outcomes
  • Performance measures
  • Trending review of Nuclear Material

Events Database (NMED) data

  • Abnormal occurrences
  • Significant enforcement actions
  • Agency Action Review Meeting

Criteria

7

slide-8
SLIDE 8

No Significant Performance Trends Identified

  • 415 NMED

events

  • 10 Abnormal

Occurrences

  • Event numbers

small compared to the millions

  • f uses

Figure 1. All NMED Events (5,634 total) from SECY 14-0035, “Annual Report to the Commission on Licensee Performance in the Materials and Waste Programs Fiscal Year 2013”

8

slide-9
SLIDE 9

Radiography Events Special Study

9

slide-10
SLIDE 10

Met Strategic Goals

  • Two nuclear materials licensees

met the Agency Action Review Meeting discussion criteria

  • Materials program met safety

and security performance metrics

  • No significant trending issues
  • No significant NRC program

issues

10

slide-11
SLIDE 11

Reactor Assessme eactor Assessments nts Allen Howe, Deputy Director Division of Inspection and Regional Support Office of Nuclear Reactor Regulation

11

slide-12
SLIDE 12

Industry-Wide Safety Performance Maintained

  • No long-term industry trends

identified with existing data

– Ongoing review

  • No short-term industry performance

limits exceeded

  • No events exceeded limits within

Baseline Risk Index for Initiating Events

12

slide-13
SLIDE 13

Industry Trends Program Improves

  • Considering all oversight

cornerstones

  • Using additional Performance

Indicator information

  • Evaluating incorporation of new

reactors performance data

13

slide-14
SLIDE 14

Oversight Process Is Effective

  • Met performance goals and

achieved intended outcomes

  • Appropriately focused resources

based on performance

  • Impact of furlough

14

slide-15
SLIDE 15

Ov Over ersight sight Pr Process

  • cess De

Devia viation tion

  • Action Matrix Deviation

– Perry (Jan. 2013)

  • Plan to add flexibility to guidance
  • Revised guidance based on lessons

learned from 2012 deviations

15

slide-16
SLIDE 16

Oversight Activities

  • Internal and External Activities

– Oversight Enhancement Project – Independent Review – Other evaluations

  • Incorporated safety culture common

language into oversight process

  • Provided recommendations for risk-

informing new reactors

16

slide-17
SLIDE 17

Future Oversight Improvements

  • Evaluate feedback and implement

appropriate oversight improvements

  • Explore improvements to the
  • versight self-assessment process
  • Continue emphasis on stakeholder

involvement

  • Transition from construction
  • versight to operating oversight

17

slide-18
SLIDE 18

Review of Browns Ferry Performance Victor McCree Regional Administrator, RII

18

slide-19
SLIDE 19

Background

  • Unit 1 Multiple/Repetitive Degraded

Cornerstone Column (Column 4), since fourth quarter 2010 – Red Finding (LPCI valve) closed – Confirmatory Action Letter (CAL) closed – Unit 1 remains in Column 4 due to additional Action Matrix inputs

19

slide-20
SLIDE 20

Background (cont.)

  • Unit 2 Degraded Cornerstone

Column (Column 3), since fourth quarter 2012

– Inspection Procedure (IP) 95002 Supplemental Inspection completed – Unit 2 remains in Column 3 due to additional Action Matrix inputs

20

slide-21
SLIDE 21

Background (cont.)

  • Unit 3 Regulatory Response Column

(Column 2), since second quarter 2012

– Previous IP 95001 Supplemental Inspection completed – Unit 3 remains in Column 2 due to White Emergency Preparedness Finding

21

slide-22
SLIDE 22

Current Plant Status

  • Unit 1 – At power since March 2013

after degraded vacuum related scram

  • Unit 2 – At power since May 2013

following refueling outage

  • Unit 3 – At power since May 2014

after a scram from a testing issue

22

slide-23
SLIDE 23

Browns Ferry Operated Safely

  • NRC conducted Baseline,

Supplemental and CAL Closure inspections in 2013

  • NRC inspections identified

improvements in station performance

  • NRC inspections identified improved

understanding of the importance of a strong safety culture

23

slide-24
SLIDE 24

Completed Inspection Procedure 95003

  • NRC identified no findings of

greater-than-Green significance

  • CAL issued to establish basis for

closure of Red Finding –Short term (Tier 1) actions –Longer term (Tier 2) actions for continued performance improvement

24

slide-25
SLIDE 25

Completed CAL Closure Inspection

  • Confirmed adequacy of Tennessee

Valley Authority (TVA) actions to address all Tier 1 items

  • No findings were identified
  • Closed Red Finding and CAL

25

slide-26
SLIDE 26

Substantive Cross-Cutting Issues Closed

  • Closed two long standing

Substantive Cross-Cutting Issues (SCCI) based on results of IP 95003 Supplemental Inspection

  • Closed one SCCI based on results of

CAL closure inspection

  • No new SCCIs opened

26

slide-27
SLIDE 27

Open Confirmatory Orders

  • 2009 Confirmatory Order for

Discrimination

– TVA continues to implement actions associated with the Confirmatory Order

27

slide-28
SLIDE 28

Open Confirmatory Orders (cont.)

  • 2014 Confirmatory Order for

10CFR50 Appendix R Operations Minimum Staffing Level

– Associated with White Emergency Preparedness Finding – SLIII 50.9 (Inaccurate Information) – SLIII 50.90 (Improper License Change)

28

slide-29
SLIDE 29

Going Forward

  • Perform IP 95001 Supplemental

Inspection for Emergency Preparedness White Finding

  • Perform inspections to verify

adequate implementation of Confirmatory Order actions

29

slide-30
SLIDE 30

Going Forward (cont.)

  • Perform baseline inspections to

verify adequate implementation of Tier 2 actions

  • Assess licensee performance for

expected Performance Indicator changes

30

slide-31
SLIDE 31

Review of Fort Calhoun Station Performance Marc Dapas Regional Administrator, RIV

31

slide-32
SLIDE 32

For

  • rt Calhoun

t Calhoun Sta Station tion

  • Regulatory Oversight
  • Restart Readiness Decision
  • Going Forward

32

slide-33
SLIDE 33

Regulatory Oversight

  • Yellow Finding – inadequate flood

protection (Oct. 2010)

– Transition to Reactor Oversight Process (ROP) Action Matrix Column 3

  • Shutdown for refueling outage

(Apr. 2011)

  • Missouri River flood (May 2011)
  • Electrical switchgear fire (June 2011)

33

slide-34
SLIDE 34

Regulatory Oversight (cont.)

  • White Finding – reactor protection

system failed contactor (July 2011)

  • Transition to ROP Action Matrix

Column 4 (Sept. 2011)

  • CAL issued (Sept. 2011)

– post flooding recovery actions

34

slide-35
SLIDE 35

Regulatory Oversight (cont.)

  • Transition to Inspection Manual

Chapter 0350 Process (Dec. 2011)

  • Omaha Public Power District/Exelon

Services Agreement (Jan. 2012)

  • Commission briefing (Feb. 2012)
  • Red Finding for switchgear fire

(Apr. 2012)

35

slide-36
SLIDE 36

Regulatory Oversight (cont.)

  • Revised CAL Issued (June 2012)

– added restart checklist – contained IP 95003 key attributes

  • Commission briefing (June 2012)
  • Restart Checklist Basis Document

issued (Nov. 2012)

36

slide-37
SLIDE 37

Regulatory Oversight (cont.)

  • Commission briefing (Jan. 2013)
  • Revised CAL issued (Feb. 2013)

– Added 3 Restart Checklist items

  • Commission briefing (May 2013)

37

slide-38
SLIDE 38

Restart Readiness Decision

  • Restart Checklist inspection

activities completed (Dec. 2013)

– 23,000 hours of NRC inspection, assessment, and licensing activities

  • Comprehensive corrective actions

independently verified

  • CAL closed (Dec. 2013)
  • Post-Restart CAL issued (Dec. 2013)

38

slide-39
SLIDE 39

Going Forward

  • Conduct baseline and area-specific

inspections –Safety Culture –Corrective Action Program –Evaluation of degraded/non- conforming conditions

39

slide-40
SLIDE 40

Going Forward (cont.)

  • Continue routine public meetings

to provide for open and transparent oversight process

  • Performance assessment for

transition to normal level of regulatory oversight

40

slide-41
SLIDE 41

References

  • SECY-14-0035, “Annual Report to the Commission on

Licensee Performance in the Materials and Waste Programs Fiscal Year 2013”

http://www.nrc.gov/reading-rm/doc-collections/commission/secys/2014/2014-0035scy.pdf

  • SECY-14-0042, “Fiscal Year 2013 Results of the

Industry Trends Program for Operating Power Reactors”

http://www.nrc.gov/reading-rm/doc-collections/commission/secys/2014/2014-0042scy.pdf

  • SECY-14-0047, “Reactor Oversight Process Self-

Assessment for Calendar Year 2013”

http://www.nrc.gov/reading-rm/doc-collections/commission/secys/2014/2014-0047scy.pdf 41

slide-42
SLIDE 42

List of Acronyms

  • CAL – Confirmatory Action Letter
  • FSME – Office of Federal and State

Materials and Environmental Management Programs

  • IP – Inspection Procedure
  • LPCI – Low Pressure Core Injection
  • NMED – Nuclear Material Events

Database

  • NRC – U.S. Nuclear Regulatory

Commission

42

slide-43
SLIDE 43

List of Acronyms (cont.)

  • RII – Regional Office II
  • RIV – Regional Office IV
  • ROP – Reactor Oversight Process
  • SCCI – Substantive Cross-Cutting

Issue

  • SECY – Office of the Secretary
  • SL – Severity Level

43

slide-44
SLIDE 44

OPTIONAL BACKGROUND SLIDE

44

slide-45
SLIDE 45

Watts Bar 2 Milestones

  • Advisory Committee on Reactor

Safeguards Meeting (Aug./Sept. 2014)

  • Commission Meeting (Oct. 2014
  • Commission Vote Paper – Issuance of

Operating License (Nov. 2015)

  • Final Readiness Letter and decision on

Full Power License (Feb. 2015)

  • Commercial Operation (Dec. 2015)

45