THE LEARNING CURVE A Renovation and Expansion Project for the Maude - PowerPoint PPT Presentation

THE LEARNING CURVE A Renovation and Expansion Project for the Maude H. Trefethen School January 15, 2015 MHT Building Committee Members Dick White, Chair Rod MacDonald, School Board Representative Rodney Rowland, School Board


  1. THE LEARNING CURVE A Renovation and Expansion Project for the Maude H. Trefethen School January 15, 2015

  2. MHT Building Committee Members • Dick White, Chair • Rod MacDonald, School Board Representative • Rodney Rowland, School Board Representative • Jim Katkin, SAU 50 Central Office • Lynn Zacharias, MHT Principal • Rich Landry, Architect • Jane Lannon • Clint Springer

  3. Agenda for Tonight • Rodney Rowland – provide a summary of the project, including the school board approach and goals • Dick White – describe the building deficiencies and building committee process to date • Rich Landry – walk through the new plan in detail, along with the cost estimate and next steps • Jane Lannon – discuss current bond estimated costs and implications for taxes

  4. Project Summary • MHT built in 1952 • Expanded in 1994 with no renovations to systems since • School needs to comply with local, State, and Federal laws and requirements • Project has looked at all aspects of school operations • State and local officials and school staff have given their input to ensure all areas were investigated • Project scope covers all identified areas of deficiency

  5. Project Ideals MHT will continue to be one of the top schools in the State Children who graduate from its walls are ensured the safe, nurturing, growing primary/elementary experience Community can be proud of MHT for many years to come

  6. Existing Floorplan Kitchen Multi-Purpose Mechanical Room (MPR) Room Multi Purpose Room MPR SPED Room CLASS M Bathrooms E KITCHEN CLASS C B B Copy Closet B Staff BR/ H SPED COPY Science/ A A A Library Science/Library Nurse Station OF OF CONF CLASS CLASS 4 Classrooms: K-1-2: 2 rooms 3-4 Admin Office 5-6 Principal’s Office Conference Room

  7. School Board Due Diligence • Identified where MHT building is out of compliance with NH Department of Education, ADA and Fire Safety requirements • Appointed Building Committee to explore options to address deficiencies and meet state requirements • Engaged ProCon to create conceptual design of a renovated school that meets state requirements • Conducted safety/security audit done by Greg Champlin - NHOEM • Conducted energy audit done by Acadia Engineers • Commissioned geotechnical study of MHT grounds by S.W. Cole • Hired fire protection engineer company S.F.C Engineering

  8. Specific Educational/Building Goals Maintain Quality of Education and Update a 1952 building for today's educational goals • Create Accessible Building • Ensure every child the right to a safe, controlled environment • Achieve goals established by the NH Department of Education and the Federal Department of Education • Ensure every parent a private opportunity with teachers • Improve Quality of Education • Improve Energy Efficiency for a Sustainable Future • Upgrade Safety and Building for Code Compliance

  9. School and Building Deficiencies 1. ADA Restrooms (Federal Law) 2. HVAC system (NH Building Code – Air Quality) 3. Special Education Room (NH DOE Requirement) 4. Guidance office (NH DOE Requirement) 5. Teacher work room (NH DOE Requirement) 6. Nurse’s Station (NE DOE Requirement) 7. Windows (Security and Energy Efficiency) 8. Lighting 9. Fire Protection System (to protect town’s investment) 10. With any renovation- need to add hot lunch program

  10. Building Committee Process to Date • Procon designed a plan, adding 4,200 SF at a total cost of $1.8M. • Held 2 Public Information Sessions this fall • Listened to feedback: people understand the needs but want a less expensive plan • The school board and budget committee approved additional funding for an alternative design and estimate • Rich Landry, architect, and ProCon, designed a smaller scope addition, focusing expansion to one area and the school board and building committee made some tradeoffs

  11. Tradeoffs of New Plan • Add 2 ADA bathrooms (one for teachers, one for students), and not bringing existing girls and boys rooms to ADA compliance. • Keep kitchen in current location. BC is confirming that current layout will meet code, given the narrow room. • Eliminate outdoor storage from scope. Assume we will privately fundraise for them. • Reduce storage from previous plan, but more than current. • Spec wall mounted ventilation for HVAC as opposed to a ceiling mounted system. BC is still discussing this tradeoff. • Assume fire protection system can fit into smaller mechanical room and does not require fire pump. Fire protection engineer will inform this. • Assume electrical closet can be located in the hallway.

  12. Project Comparison Current Building After Proposed Renovation Square Footage 8,276 SF 10,076 SF Classrooms 4 5 (Converted Storage to SPED classroom and added flex room next to MPR) Offices/Conf 4 5 (Added 1 Rooms Teacher Work/Conf Room) Uses per 2-3 1-2 Office/Conf Room

  13. Existing Floorplan Multi Purpose Room MPR CLASS M E KITCHEN CLASS C B B B H SPED COPY A A Science/ A Library OF OF CONF CLASS CLASS

  14. Proposed Floorplan MECH STG Flex Class- TCHR/ room Multi Purpose STG COPY Room MPR CLASS NURSE M E C A D KITCHEN H A CLASS B B SPED/ A STG D A A GDNC A SPED OF OF CONF CLASS CLASS

  15. Project Estimates and Costs as of 1/9 Building Committee Project Estimate Budget & Expenses Construction Cost $674,000 Mgmt Fee/OSHA/Ins 65,000 Pro con $14,200 Contingency 10% 68,000 Fire Prot. Engr. 2,500 Arch./Civil/Structural Design 70,000 Geotech Study 5,700 Legal, Clerk, Bond Fees 41,000 Furnishings/Equipment 45,000 Total $22,400 Total Estimated Cost 963,000 + Build. Comm. Contingency 35,000 Budget $25,000 Total Bond Amount $998,000

  16. Next Steps for Project Planning • Determine if current kitchen design meets DOE requirements – plans to be reviewed with SAU administrator and kitchen designer • Determine HVAC approach of wall mounted unit ventilator vs in-ceiling ducted air vents, given upfront costs and maintenance costs – building committee to discuss • Consult Fire Protection Engineer on fire protection system requirements • Determine approach to window replacement - either keep current size or make smaller – building comm to discuss • Finalize bond amount and term

  17. Bond Estimates as of 1/9/15 10 Year Bond 20 Year Bond Int Rate 3.50% Int Rate 4.00% Bond Amt $998,000 Bond Amt $998,000 Int Paid $195,000 Int Paid $423,000 Total Cost $1,193,000 Total Cost $1,421,000

  18. What does this mean for you? Estimated Annual Tax Impact for $1M Home Over 10 Years $250 $200 $150 $100 $50 $0 Year 1 Year 2 Year 3 Year 4 Year 5 Year 6 Year 7 Year 8 Year 9 Year 10 This assumes a bond value of $998,000 with no change in assessed value over the 10 years.

  19. What does this mean for you? Estimated Annual Tax Impact for $1M Home Over 20 Years $160 $140 $120 $100 $80 $60 $40 $20 $0 Yr 1 Yr 2 Yr 3 Yr 4 Yr 5 Yr 6 Yr 7 Yr 8 Yr 9 Yr Yr Yr Yr Yr Yr Yr Yr Yr Yr Yr 10 11 12 13 14 15 16 17 18 19 20 This assumes a bond value of $998,000 with no change in assessed value over the 20 years.

  20. Next Meetings • Building Committee Meeting: January 23, 6:00pm @ MHT • Public Bond Hearing: January 28, 2015, 7:00pm @ Rec Center • Building Project Information Session: February 19, 7:00pm @ MHT • Annual School District Meeting: March 10, 7:00pm, @ Rec Center

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.