the implementation of the implementation of
play

The implementation of The implementation of Water Framework - PDF document

9/1/2008 The implementation of The implementation of Water Framework Directive Water Framework Directive the WFD the WFD The WFD aims to; Prevent deterioration, enhance the status of aquatic ecosystems & associated wetlands


  1. 9/1/2008 The implementation of The implementation of Water Framework Directive Water Framework Directive the WFD the WFD • The WFD aims to; • Prevent deterioration, enhance the status of aquatic ecosystems & associated wetlands • Promote sustainable water use • Reduce pollution from priority substances Opportunities and Risks Opportunities and Risks • Prevent deterioration / reduce pollution of groundwater • Contribute to mitigating effects of floods / droughts • • Two Key Default Objectives • To prevent deterioration in water status; and • To aim to achieve ‘good status’ by 2015 in WFD water bodies. The UK Approach The UK Approach 2008 2008- -09 09- -08 08 EUWMA- EUWMA -Meeting 2008 Meeting 2008 1 2008 2008- -09 09- -08 08 EUWMA- EUWMA -Meeting 2008 Meeting 2008 2 River Basin Plans • Draft River Basin Management Plans – Art 13 • In England only - 6 draft plans • In Wales only -1 draft plan • In Scotland only – 1 draft plan • In Northern Ireland only - draft plan • 2 shared plans with E&W – Severn and Dee • 2 shared plans with E&S – Solway Tweed and Northumbria • 3 shared plans with NI & RoI – North Western, Neagh Bann and Shannon IRBDs Programme of measures Programme of measures Programme of measures Programme of measures • script • Risk based and phased approach script Risk based and phased approach • Utilise existing measures Utilise existing measures • Action where high confidence there is a Action where high confidence there is a problem problem • And that a measure is effective And that a measure is effective • Sectoral impact / contribution Sectoral impact / contribution EUWMA EUWMA- -Meeting 2008 Meeting 2008 5 EUWMA- EUWMA -Meeting 2008 Meeting 2008 6 2008- 2008 -09 09- -08 08 2008- 2008 -09 09- -08 08 1

  2. 9/1/2008 The impact The impact The impact The impact • Ecological improvements • Ecological improvements • Integrated management of water • Integrated management of water environment environment • Improved stakeholder engagement and Improved stakeholder engagement and decision making decision making • Financial Financial – – Cost effectiveness analysis Cost effectiveness analysis • Improved decision making Improved decision making 2008 2008- -09 09- -08 08 EUWMA- EUWMA -Meeting 2008 Meeting 2008 7 Objective Setting Process – Art 4 The financing The financing • Defra preliminary cost effectiveness Defra preliminary cost effectiveness analysis analysis • Target existing action Target existing action • Sectoral contributions Sectoral contributions EUWMA EUWMA- -Meeting 2008 Meeting 2008 10 10 2008 2008- -09 09- -08 08 Public Involvement Public Involvement Links to Europe Links to Europe 2

  3. 9/1/2008 Thank you Association of Drainage Authorities admin@ada.org.uk www.ada.org.uk 3

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.

Recommend


More recommend