central riverfront
play

CENTRAL RIVERFRONT Ward Meeting Public Drop-In IMPLEMENTATION PLAN - PowerPoint PPT Presentation

CENTRAL RIVERFRONT Ward Meeting Public Drop-In IMPLEMENTATION PLAN Centres CENTRAL RIVERFRONT IMPLEMENTATION PLAN REVIEW WHAT IS CRIP ? Central Riverfront Implementation Plan CENTRAL RIVERFRONT IMPLEMENTATION PLAN REVIEW WHAT IS CRIP ?


  1. CENTRAL RIVERFRONT Ward Meeting Public Drop-In IMPLEMENTATION PLAN Centres

  2. CENTRAL RIVERFRONT IMPLEMENTATION PLAN REVIEW WHAT IS CRIP ? Central Riverfront Implementation Plan

  3. CENTRAL RIVERFRONT IMPLEMENTATION PLAN REVIEW WHAT IS CRIP ? Central Riverfront Implementation Plan  Prepared in 2000 by Consultants and City Staff with extensive public consultation.  Created to record the community’s vision and establish the framework for development of the Central Riverfront Lands.

  4. CENTRAL RIVERFRONT IMPLEMENTATION PLAN REVIEW WHY THIS MEETING? We are approximately at the mid-point of the 25 year planning time frame during which CRIP was to be implemented. A lot has been accomplished in 13 years and it is time to review the plans. Please tell us what you think!

  5. FROM THE ARCHIVES CENTRAL RIVERFRONT IMPLEMENTATION PLAN REVIEW

  6. FROM THE ARCHIVES Windsor Riverfront 1956 CENTRAL RIVERFRONT IMPLEMENTATION PLAN REVIEW

  7. FROM THE ARCHIVES Windsor Riverfront 1999 CENTRAL RIVERFRONT IMPLEMENTATION PLAN REVIEW

  8. FROM THE ARCHIVES CENTRAL RIVERFRONT IMPLEMENTATION PLAN REVIEW

  9. BEFORE EXAMPLE OF WHAT HAS BEEN COMPLETED RTB SHORELINE CENTRAL RIVERFRONT IMPLEMENTATION PLAN REVIEW

  10. DURING EXAMPLE OF WHAT HAS BEEN COMPLETED RTB SHORELINE CENTRAL RIVERFRONT IMPLEMENTATION PLAN REVIEW

  11. AFTER EXAMPLE OF WHAT HAS BEEN COMPLETED RTB SHORELINE CENTRAL RIVERFRONT IMPLEMENTATION PLAN REVIEW

  12. BEFORE EXAMPLE OF WHAT HAS BEEN COMPLETED CLIFF AND JOAN HATCH MEMORIAL GARDENS CENTRAL RIVERFRONT IMPLEMENTATION PLAN REVIEW

  13. DURING EXAMPLE OF WHAT HAS BEEN COMPLETED CLIFF AND JOAN HATCH MEMORIAL GARDENS CENTRAL RIVERFRONT IMPLEMENTATION PLAN REVIEW

  14. COMPLETED EXAMPLE OF WHAT HAS BEEN COMPLETED CLIFF AND JOAN HATCH MEMORIAL GARDENS CENTRAL RIVERFRONT IMPLEMENTATION PLAN REVIEW

  15. USE AND PLACEMENT OF CENTRAL RIVERFRONT IMPLEMENTATION PLAN REVIEW BEACONS The CRIP Study provided for five “park pavilions” called Beacons as a framework for the Central Riverfront Park

  16. CENTRAL RIVERFRONT IMPLEMENTATION PLAN REVIEW THE FIVE ORIGINAL BEACONS Dawn Celestial Peace City Legacy

  17. Peace Beacon Dawn Beacon Legacy Beacon City Beacon Celestial Beacon CENTRAL RIVERFRONT IMPLEMENTATION PLAN REVIEW ORIGINAL BEACON PLAN

  18. DAWN BEACON CENTRAL RIVERFRONT IMPLEMENTATION PLAN REVIEW

  19. CITY BEACON CENTRAL RIVERFRONT IMPLEMENTATION PLAN REVIEW

  20. PEACE BEACON CENTRAL RIVERFRONT IMPLEMENTATION PLAN REVIEW

  21. LEGACY BEACON CENTRAL RIVERFRONT IMPLEMENTATION PLAN REVIEW

  22. CELESTIAL BEACON CENTRAL RIVERFRONT IMPLEMENTATION PLAN REVIEW

  23. CENTRAL RIVERFRONT SO FAR, THE PEACE BEACON IMPLEMENTATION PLAN REVIEW HAS BEEN CONSTRUCTED Original Rendering As Constructed

  24. CENTRAL RIVERFRONT SHOULD ANY CHANGES TO THE IMPLEMENTATION PLAN REVIEW BEACON PLAN BE CONSIDERED?

  25. Peace City Arts Beacon Water Beacon Beacon Dawn Beacon Beacon Sculpture Aquatics Celestial Beacon Remembranc Walkerville Trail Head Entertainme e University Trail Head nt Potential Pedestrian Connection High Volume Potential Pedestrian New Connection Existing Grade Separation Potential Beacon Grade Separation CENTRAL RIVERFRONT Possible Changes to Beacon Plan IMPLEMENTATION PLAN REVIEW

  26. POSSIBLE RELOCATED DAWN BEACON CENTRAL RIVERFRONT IMPLEMENTATION PLAN REVIEW

  27. POSSIBLE RELOCATED DAWN BEACON CENTRAL RIVERFRONT IMPLEMENTATION PLAN REVIEW

  28. POSSIBLE WATER BEACON (RELOCATED LEGACY BEACON) CENTRAL RIVERFRONT IMPLEMENTATION PLAN REVIEW

  29. POSSIBLE ARTS BEACON (WITH SEASONAL COMMERCIAL) CENTRAL RIVERFRONT IMPLEMENTATION PLAN REVIEW

  30. POSSIBLE ARTS BEACON ( WITH SEASONAL COMMERCIAL) CENTRAL RIVERFRONT IMPLEMENTATION PLAN REVIEW

  31. POSSIBLE ARTS BEACON ( WITH SEASONAL COMMERCIAL) CENTRAL RIVERFRONT IMPLEMENTATION PLAN REVIEW

  32. MARINA (LOCATIONS UNDER CONSIDERATION) OPTIONAL MARINA SITE ORIGINAL CRIP MARINA SITE (BETWEEN CHURCH STREET (BETWEEN GLENGARRY AVENUE AND JANETTE STREET) AND PARENT AVENUE) CENTRAL RIVERFRONT IMPLEMENTATION PLAN REVIEW

  33. MARINA (ORIGINAL CRIP SITE) EXISTING SITE CENTRAL RIVERFRONT IMPLEMENTATION PLAN REVIEW PROPOSED

  34. MARINA (OPTIONAL SITE NEAR ART GALLERY) EXISTING SITE RENDERING CENTRAL RIVERFRONT IMPLEMENTATION PLAN REVIEW PROPOSED

  35. CONNECTIVITY STREET LEVEL CROSSING: TO THE SOUTH CROSSING MOVEMENT (TYPES OF RIVERSIDE DRIVE CROSSINGS) PEDESTRIAN BRIDGE: CROSSING MOVEMENT RIVERSIDE DRIVE PEDESTRIAN UNDERPASS: RIVERSIDE DRIVE CROSSING MOVEMENT CENTRAL RIVERFRONT IMPLEMENTATION PLAN REVIEW

  36. Dawn Beacon Walkerville Trail Head City Beacon Entertainment Peace Beacon Remembrance Water Beacon Aquatics Arts Beacon Walkerville Sculpture Celestial Beacon Entertainment University Trail Head District Main Street Future Greenway University of Windsor Linkage Multi-modal Proposed Connectivity to City

  37. CONNECTIVITY TO THE SOUTH (POTENTIAL CROSSING LOCATIONS) POTENTIAL PEDESTRIAN LEGEND HIGH VOLUME POTENTIAL CONNECTION (EXISTING GRADE PEDESTRIAN CONNECTION SEPARATION LOCATIONS) CENTRAL RIVERFRONT IMPLEMENTATION PLAN REVIEW

  38. CONNECTIVITY TO THE SOUTH (EXAMPLE) CENTRAL RIVERFRONT IMPLEMENTATION PLAN REVIEW

  39. CONNECTIVITY TO THE SOUTH (CROSSING EXAMPLES) CENTRAL RIVERFRONT IMPLEMENTATION PLAN REVIEW

  40. RIVERSIDE DRIVE WALKABILITY CENTRAL RIVERFRONT IMPLEMENTATION PLAN REVIEW

  41. RIVERSIDE DRIVE WALKABILITY TWO LANES WITH ANGLED PARKING TWO LANES WITH PARALLEL PARKING CENTRAL RIVERFRONT IMPLEMENTATION PLAN REVIEW

  42. habitat light frame patterns comfort views interaction lighting winter interest grandeur shade focal sense define back drop point of place space CENTRAL RIVERFRONT TREE PLANTING IMPLEMENTATION PLAN REVIEW

  43. COMMERCIAL DEVELOPMENT (EXAMPLES) CENTRAL RIVERFRONT IMPLEMENTATION PLAN REVIEW

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.

Recommend


More recommend