THE 30th IAPH WORLD PORTS CONFERENCE
7 - 12 May 2017 Bali Nusa Dua Convention Center, Bali - Indonesia
Enabling Trade. Energizing The World
IPC TRANSFORMATION
Elvyn G. Masassya
PT Pelabuhan Indonesia II (Persero) Session 6
THE 30 th IAPH WORLD PORTS CONFERENCE 7 - 12 May 2017 Bali Nusa - - PowerPoint PPT Presentation
THE 30 th IAPH WORLD PORTS CONFERENCE 7 - 12 May 2017 Bali Nusa Dua Convention Center, Bali - Indonesia IPC TRANSFORMATION INDONESIA INTEGRATED PORT NETWORK Elvyn G. Masassya PT Pelabuhan Indonesia II (Persero) Session 6 Enabling Trade.
7 - 12 May 2017 Bali Nusa Dua Convention Center, Bali - Indonesia
Enabling Trade. Energizing The World
Elvyn G. Masassya
PT Pelabuhan Indonesia II (Persero) Session 6
2 The 30th World Port Conference
3 The 30th World Port Conference
rge e Bernard rd Shaw-
Set t long-term term goals Comm mmitted tted and consi sisten stent t in a achiev eving g goals s and resul sults ts Keep ep innovatin ting
4 The 30th World Port Conference
2019 Initial Operation of strategic gic proje ject Expected complet pletion ion of Phase se I of New Priok Port by 2019 2012 Launc nched hed new ew ident ntit ity y and re-branded IPC with visions to be a world class port operator 2013 Commen mmenced ed Phase se I of the develop elopment ent
ew Priok iok Port rt to further expand the total handling capacity of Tanjung Priok Port to 4.5 million TEUs per year and 10 million mt per year for product terminal 1960 Government established state e owne ned d enterpri erprise se of Pelabuha labuhan n I to VIII (“Perum Pelabuhan”) to manage sea port activities across Indonesia 2016 Redefine new ew strategy egy and corporate porate roadma dmap New Priok Port’s first rst containe iner r term rmina inal l (CT1) 1) commenced
20 2020 20 World ld class s port rt oper erator
Implementation of integr egrated ed port rt networ
6
2016
FIT T IN INFRASTR ASTRUCTU UCTURE Fine e tuning in every y area
Govern vernan ance ce : Business Process, SOP, Structure Cultur ture Corporate & Sub Business Model/ Rest structu ucturing ing Re Re-define efine Busine ness
ENHANCEM ANCEMENT ENT streng engthenin ening/ / enhan anci cing business ss
Operatio tional nal & Servi vice ce improvem ement ent Expa pansio ion of Subsidiaries Infrastr astructur cture e Develo elopme ment nt (Greenfield Project and brownfield project) Optim timiz ize IT Utilization
ESTABLISHM ABLISHMENT NT Establish shmen ment of perfo forman mance ce
Volume ume Grow
Profitability Growth Hold lding ing Establishmen t (Synergize among BUMN)
SUSTAI AINABL NABLE E Sustain ainable e super erior perfo forman mance ce WORLD D CLASS World class ss perfo forman mance ce
First Operation
ategic ic project ject Implementation
egrate ated port t Network Implementation Natio ional al Conne nnect ctiv ivity ty Prog
am Initiation of glo lobal al foot t print int Establishment
al foot t print int. Establishment
ld class ss terminal
Implementation
een port t & smart t port
Excellence competing subsidiaries in their respec spective tive industr dustry y & world ld clas ass stand ndar ard d
2017
2018
2019
2020
7 The 30th World Port Conference
Excellence ence in Powerfu rful l supportin ting g Busines ess For Core Business
BUYERS
STORE I STORE II STORE III DISTRIBUT UTION N CENTRE
3 PL/ FORWARDING PELABUHAN
SHIPPING NG LINE
CARRIERS PELABUHAN
WAREHO EHOUS USE
3 PL/ FORWARDING
VENDOR I VENDOR II FACTOR ORY Y I FACTOR ORY Y II FACTOR ORY Y III
TRADE/ MANUFACTURE CUSTOMER/ SHIPPERS
PORT NETWORK INTEGRATED PORT INTEGRATED PORT
1 2 3 4
Synerg rgized ized port and industr trial ial area Strate tegic ic Control
Focus on Excellence ence in core busines ess network
1 2 3 4
8 The 30th World Port Conference
HARD INFRASTRUCTURE SOFT INFRASTRUCTURE
INDONESIA 7 HUBS : Establishing intra-island and intra-country connectivity IPC BRANCHES INFRASTRUCTURE TRANSFORMATION : IPC has transformed 12 branches to provide more efficient services for customers STRATEGIC PROJECT : IPC has planned to develop 3 ports and 1 canal in the next 3 years TOS OPUS : Increasing the level of planning accuracy and operational performance INAPORTNET :Implementation of the integrated system of cargo and ships clearance involving various stakeholders E-SERVICE PORTAL :Electronic web portal designed for IPC customers BRANCHES AND SUBSIDIARIES RESTRUCTURING : Restructure branches and subsidiaries of IPC to increase IPC performance
9 The 30th World Port Conference
Planning & Contr ntrol
ementat ntation
Incr creas easing term rminal al prod
uctivity ty As As a requi quire reme ment nt to to esta tabli blish sh connec ectiv tivity ty between tween ter erminal
OPUS has been implemente nted in T TO1 009 & & TO3 Tanjung ng Priok, Palembang, ang, Panjang ang, & Pontianak anak port Install alling ing OPUS system Improvin ving infrast astruct ructure re Enha nhancin ncing busin siness ss proce rocess to to su supp pport
OPUS Imple lement entin ing integrati ration with billing ng Implement enting ng HSSE HSSE IPC has done the following actions: Advantage:
10 The 30th World Port Conference
Ind Indone
sia Po Port rt Net Net is a sing ngle le service service system with internet basis to facilitate data ata exchan xchange ge and provide port
ser ervice ice infor nformat ation ion faster, safer, and easier to integ tegrate rate wit with stake stakehol holder er related within port industry The Pilot Project is implementation within 4 main in por ports ts and wil ill be be follow
ed by by other 12 12 ports. Makassar Tanjung Perak Belawan Tanjung Priok
1. 1. Single online datab abase se syst stem em 2.
Servi vice ce req equest uest and and pla plannin nning are are integ ntegrated rated bet etwe ween en op
ator
and regu gulat ator
3.
time trac acking and trac acing 4.
erat ation
al repo port 5.
me tax calcu culat ation
BEFORE INAPORTNET AFTER INAPORTNET
11 The 30th World Port Conference
SOFT INFRASTRUCTURE TRANSFORMATION - E-SERVICE PORTAL Impl plem ementat entation
e: Tanjung Priok, Panjang, Palembang, and Pontianak Port
FEATURES ES
E-REGISTRATION E-BOOKING E-TRACKING E-BILLING E-PAYMENT E-CARE 1 2 3 4 5 6
12 The 30th World Port Conference
SOFT INFRASTRUCTURE TRANSFORMATION - BRANCHES AND SUBSIDIARIES RESTRUCTURING IPC C manages ges 12 branch ches es and 16 subsidi diaries aries
1.
nomous s branch nches es 2.
t oper erat ation
branches ches
diaries aries are e esta tabl blished shed to expand IPC business
rateg egic c funct ction
to manage the role/f e/fun unct ction
nches and subsidi diaries aries in order to be more re focu cus and to incre rease ase corp rpora
e value
13 The 30th World Port Conference
HARD INFRASTRUCTURE TRANSFORMATION - INDONESIA 7 HUBS
Pontianak Surabaya Makassar Bitung Sorong/Seget Belawan/Kuala Tanjung Tanjung Priok
Pelabuhan uhan Tj Tj. . Priok : SUPER HUB – As the main gateway of international cargo 6 6 Pelabuha uhan Lain: As the international gateway of certain cargo Main route e of Nation
al Connecti ctivity vity Support rting ing route of National nal Connect ctivit ivity Main route e of interna rnatio tional nal Connecti ctivit vity
14 The 30th World Port Conference
HARD INFRASTRUCTURE TRANSFORMATION - IPC BRANCHES INFRASTRUCTURE TRANSFORMATION
PONTIANAK PORT
Lift, RMGC, & Gantry Jib Crane) PALEMBANG PORT
Lift, RMGC, & Gantry Jib Crane) PANJANG PORT
RMGC, & Gantry Jib Crane) TELUK BAYUR PORT
Luffing Crane and RTGC) JAMBI PORT
15 The 30th World Port Conference
HARD INFRASTRUCTURE TRANSFORMATION - IPC BRANCHES INFRASTRUCTURE TRANSFORMATION – PONTIANAK PORT
Control Tower Traffic Sign and Gate Container Yard
PREVIOUS OUS CONDITIONS TIONS
1
Limi mited CY A Area
2
Dominat ated ed by Manual l Proces ess
3
Ineffic fficient ent stripping ing/stu stuffin ffing and unclear ear operati ational
cy Ship Waiting g time (≥ 7 d days) Bad indicato ator r Perform rmance ance of Pontianak anak Port High cost for custome mer r caused ed by cargo handlin ing g delay
CONSEQUE UENCES
PROGRAM M & RESULTS Incre reas asin ing g CY capacity city from 4,500 TEUs to 6 6,000 TEUs Adding termina nal l marking ng and traffi ffic c sign Planning ing and contro rol l is d done by Control l Tower r
Separation Terminal
Separat ration ion between een Contain iner er and Multipu purpo rpose e Terminal al activiti vities es
16 The 30th World Port Conference
HARD INFRASTRUCTURE TRANSFORMATION - STRATEGIC PROJECT
NEW PRIOK CONTAIN INER TERMIN INAL
Locatio tion n : Tanjung Priok, Jakarta Type : Container and Liquid BulkTerminal Inves estm tment ent : Rp 36 Trillion Current nt Progres ess s : Full Comercial operation for CT 1 on August 2016; Development Phase 1 (CT 2; CT 3; PT 1; PT 2) Develop lopmen ent t Period : 2012 – 2027 Inves estm tment ent Opportuni unitie ties:
17 The 30th World Port Conference
HARD INFRASTRUCTURE TRANSFORMATION - STRATEGIC PROJECT
Locatio tion n : : West Kalimantan Type : Container, Bulk Multipurpose Terminal Total Area : : 1350 Ha Total Inves estm tmen ent t : Rp 5,1 Trillion Constructi uction
2017 Operat atio ion n Plan : : 2020 Inves estm tment ent Opportuni unitie ties:
Multipurpose)
(Container, Bulk, Multipurpose)
KIJING G PORT
18 The 30th World Port Conference
HARD INFRASTRUCTURE TRANSFORMATION - STRATEGIC PROJECT
SORONG G PORT
Locatio tion n : : Seget District, West Papua Type : Container Terminal Total Inves estm tmen ent t : Rp 2,4 Trillion Constructi uction
Operat atio ion n Plan : : 2020 Inves estm tment ent Opportuni unitie ties:
mining)
19 The 30th World Port Conference
HARD INFRASTRUCTURE TRANSFORMATION - STRATEGIC PROJECT
CIKARANG NG BEKASI SI LAUT T (CANAL)
Locatio tion n : : Cikarang-Bekasi, West Java Type : : Canal Total Area : : 200 Ha Capacity ity : : 1.6 Million TEUs/year Total Inves estm tmen ent t : Rp 5 Trillion Invest estment ent Opportu tuniti nities es:
THE 30th IAPH WORLD PORTS CONFERENCE
7 - 12 May 2017, Bali Nusa Dua Convention Center, Bali - Indonesia