GREEN EARTH
A PRESENTATION
IMT-GT PILOT PROJECT OBJECTIVE : “TO INSTALL AND COMMISSION 20 ELECTRICAL MANAGEMENT UNITS (EMU) AT SELECTED STREET LIGHTING FEEDER PILLARS IN MELAKA” MELAKA GREEN INITIATIVE OBJECTIVE: “ TO CONSERVE 30 PERCENT OF ELECTRICAL CONSUMPTION IN ALL TARGETED STREET LIGHTING CIRCUITERY”
- NO. OF STREET LIGHTINGS FEEDERS: 20 FEEDERS
- NO. OF COUNCIL PARTICIPATING:1) MAJLIS BANDARAYA MELAKA BERSEJARAH
2) MAJLIS PERBANDARAN HANG TUAH JAYA METHODOLOGY OF COMPLIANCE:
International Performance Measurement and Verification Protocol (IPMVP).
METHODOLOGY We have taken steps to ensure that the performance measurement and verification of savings are acceptable by international standards. The methodology applied is derived from the International Performance Measurement and Verification Protocol (IPMVP). The IPMVP outlines the methodology of calculating savings for an
- EEM. It also outlines the various ways of determining the
performance measurement and verification. For this pilot project, we chose to apply the “Retrofit Isolation”
- method. This is due to the fact:
- The circuit is isolated from other circuits.
- It has its own metering device.
- It is typical of most street lighting circuits.
- The circuit only consists of lighting load.
- There are no fluctuations in terms of load and hours of operation.
- The ambient temperature and humidity level for our country is
consistent.
Based on the methodology, we are able to derive a substantially accurate level of savings. We are able to eliminate uncertain variables such as load changes, variation in operation hours, climatic changes and effects from other non-lighting loads. As such, the savings calculations can be simply derived by comparing pre and post retrofit daily averages from monthly billings issued by the utility company.
METHODOLOGY
ILLUSTRATION FROM PREVIOUS INSTALLATION IN 2009 PILOT PROJECT REPORT
IMT-GT PILOT PROJECT 2014 IMPLEMENTATION PROCESS
1) FEEDER SELECTION 2) FOOTING WORKS AT SITE 3) INSTALLATION WORKS AT SITE 4) COMMISSIONING AT SITE
IMT-GT PILOT PROJECT 2014 TIME-LINE
RECEIVED FEEDER PILLARS KEYS FOR PROJECT IMPLEMENTATION FROM RESPECTIVE COUNCILS 16 JUNE 2014 17 JUNE 2014
FOOTING AND INSTALLATION WORKS COMMENCE
23 JULY 2014
INSTALLATION WORKS COMPLETE
TESTING AND COMMISSIONING
28 JULY 2014 10&11 SEPT 2014
HANDING-OVER TO CITY COUNCIL
FEEDER SELECTION
SELECTED CITY COUNCIL STREET LIGHTINGS FEEDER PILLAR ELECTRICAL MANAGEMENT UNIT (EMU) N E W F O O T I N G CABLE CONNECTION
FOOTING SCHEMATICS
4’ 2’ 4’
FOOTING WORKS
FAM DIGITAL SDN. BHD.
IMT-GT GREEN INITAITIVE PROJECT 2014 STREET LIGHTING ENERGY EFFICIENCY PROJECT MELAKA, MALAYSIA
(678057-W)
FAM DIGITAL SDN. BHD.
IMT-GT GREEN INITAITIVE PROJECT 2014 STREET LIGHTING ENERGY EFFICIENCY PROJECT MELAKA, MALAYSIA INSTALLATION DATE : 27/6/2014 SELECTED FEEDER PILLAR NO : FP1 LOCATION : LEBUHRAYA AYER KEROH COMMISIONING DATE : 23/7/2014
BEFORE ENERGY SAVING MODE DURING ENERGY SAVING MODE PHASE RED YELLOW BLUE PHASE RED YELLOW BLUE VOLTS
243 233 238
VOLTS
244 233 240
AMPS
27.3 27.4 41.5
AMPS
21.1 20.6 32.0
WATTS
4306 5147 7747
WATTS
3196 3794 6045
P.F
0.75
P.F
0.75
(678057-W)
1
FAM DIGITAL SDN. BHD.
IMT-GT GREEN INITAITIVE PROJECT 2014 STREET LIGHTING ENERGY EFFICIENCY PROJECT MELAKA, MALAYSIA INSTALLATION DATE : 27/6/2014 SELECTED FEEDER PILLAR NO : FP 2 LOCATION : LEBUHRAYA AYER KEROH COMMISIONING DATE : 23/7/2014
BEFORE ENERGY SAVING MODE DURING ENERGY SAVING MODE PHASE RED YELLOW BLUE PHASE RED YELLOW BLUE VOLTS
239 239 241
VOLTS
240 240 242
AMPS
31.5 33.7 29.4
AMPS
23.8 24.8 21.9
WATTS
5692 5816 4927
WATTS
4254 4279 3644
P.F
0.73
P.F
0.72
(678057-W)
F/P 2
2
FAM DIGITAL SDN. BHD.
IMT-GT GREEN INITAITIVE PROJECT 2014 STREET LIGHTING ENERGY EFFICIENCY PROJECT MELAKA, MALAYSIA INSTALLATION DATE : 27/6/2014 SELECTED FEEDER PILLAR NO : FP1-14 LOCATION : LEBUHRAYA AMJ COMMISIONING DATE : 23/7/2014
BEFORE ENERGY SAVING MODE DURING ENERGY SAVING MODE PHASE RED YELLOW BLUE PHASE RED YELLOW BLUE VOLTS
237 231 237
VOLTS
237 232 237
AMPS
23.7 39.7 25.7
AMPS
17.1 27.5 18.8
WATTS
4237 5937 4174
WATTS
2955 4859 2961
P.F
0.74
P.F
0.73
(678057-W)
F/P 2
3
FAM DIGITAL SDN. BHD.
IMT-GT GREEN INITAITIVE PROJECT 2014 STREET LIGHTING ENERGY EFFICIENCY PROJECT MELAKA, MALAYSIA INSTALLATION DATE : 27/6/2014 SELECTED FEEDER PILLAR NO : FP 2-3 LOCATION : LEBUHRAYA AMJ COMMISIONING DATE : 23/7/2014
BEFORE ENERGY SAVING MODE DURING ENERGY SAVING MODE PHASE RED YELLOW BLUE PHASE RED YELLOW BLUE VOLTS
248 247 249
VOLTS
248 247 250
AMPS
26.7 41.0 38.0
AMPS
19.8 30.5 27.8
WATTS
4753 6474 5712
WATTS
2965 3815 4141
P.F
0.61
P.F
0.62
(678057-W)
F/P 2
4
FAM DIGITAL SDN. BHD.
IMT-GT GREEN INITAITIVE PROJECT 2014 STREET LIGHTING ENERGY EFFICIENCY PROJECT MELAKA, MALAYSIA INSTALLATION DATE : 27/6/2014 SELECTED FEEDER PILLAR NO : FP 2-8 LOCATION : LEBUHRAYA AMJ COMMISIONING DATE : 23/7/2014
BEFORE ENERGY SAVING MODE DURING ENERGY SAVING MODE PHASE RED YELLOW BLUE PHASE RED YELLOW BLUE VOLTS
252 252 251
VOLTS
253 253 252
AMPS
32.6 29.1 36.7
AMPS
25.3 22.3 27.3
WATTS
6523 5536 6597
WATTS
5203 3914 4990
P.F
0.81
P.F
0.77
(678057-W)
5
FAM DIGITAL SDN. BHD.
IMT-GT GREEN INITAITIVE PROJECT 2014 STREET LIGHTING ENERGY EFFICIENCY PROJECT MELAKA, MALAYSIA INSTALLATION DATE : 27/6/2014 SELECTED FEEDER PILLAR NO : FP 2-11 LOCATION : LEBUHRAYA AMJ COMMISIONING DATE : 23/7/2014
BEFORE ENERGY SAVING MODE DURING ENERGY SAVING MODE PHASE RED YELLOW BLUE PHASE RED YELLOW BLUE VOLTS
233 228 240
VOLTS
234 231 239
AMPS
35.7 43.2 16.6
AMPS
27.3 32.8 12.7
WATTS
5743 6590 2583
WATTS
4413 4939 1883
P.F
0.68
P.F
0.66
(678057-W)
6
FAM DIGITAL SDN. BHD.
IMT-GT GREEN INITAITIVE PROJECT 2014 STREET LIGHTING ENERGY EFFICIENCY PROJECT MELAKA, MALAYSIA INSTALLATION DATE : 21/7/2014 SELECTED FEEDER PILLAR NO : FP 2 LOCATION : JALAN TANGKAK - JASIN COMMISIONING DATE : 23/7/2014
BEFORE ENERGY SAVING MODE DURING ENERGY SAVING MODE PHASE RED YELLOW BLUE PHASE RED YELLOW BLUE VOLTS
240 240 240
VOLTS
240 240 240
AMPS
14.2 13.2 10.7
AMPS
11.0 9.31 7.92
WATTS
2643 2478 2132
WATTS
2450 1885 1654
P.F
0.87
P.F
0.88
(678057-W)
7
FAM DIGITAL SDN. BHD.
IMT-GT GREEN INITAITIVE PROJECT 2014 STREET LIGHTING ENERGY EFFICIENCY PROJECT MELAKA, MALAYSIA INSTALLATION DATE : 22/7/2014 SELECTED FEEDER PILLAR NO : FP 3 LOCATION : JALAN TANGKAK - JASIN COMMISIONING DATE : 23/7/2014
BEFORE ENERGY SAVING MODE DURING ENERGY SAVING MODE PHASE RED YELLOW BLUE PHASE RED YELLOW BLUE VOLTS
244 243 243
VOLTS
243 242 243
AMPS
36.8 36.5 33.8
AMPS
25.6 27.4 24.5
WATTS
6497 6223 6092
WATTS
4450 4559 4339
P.F
0.73
P.F
0.71
(678057-W)
8
FAM DIGITAL SDN. BHD.
IMT-GT GREEN INITAITIVE PROJECT 2014 STREET LIGHTING ENERGY EFFICIENCY PROJECT MELAKA, MALAYSIA INSTALLATION DATE : 21/7/2014 SELECTED FEEDER PILLAR NO : FP 4 LOCATION : LEBUHRAYA AMJ COMMISIONING DATE : 23/7/2014
BEFORE ENERGY SAVING MODE DURING ENERGY SAVING MODE PHASE RED YELLOW BLUE PHASE RED YELLOW BLUE VOLTS
229 230 237
VOLTS
232 233 240
AMPS
34.5 34.9 28.0
AMPS
25.8 26.5 20.9
WATTS
5825 5724 4751
WATTS
4438 4353 3509
P.F
0.73
P.F
0.72
(678057-W)
F/P 2
9
FAM DIGITAL SDN. BHD.
IMT-GT GREEN INITAITIVE PROJECT 2014 STREET LIGHTING ENERGY EFFICIENCY PROJECT MELAKA, MALAYSIA INSTALLATION DATE : 5/7/2014 SELECTED FEEDER PILLAR NO : FP 5 LOCATION : JALAN TANGKAK - JASIN COMMISIONING DATE : 23/7/2014
BEFORE ENERGY SAVING MODE DURING ENERGY SAVING MODE PHASE RED YELLOW BLUE PHASE RED YELLOW BLUE VOLTS
237 233 236
VOLTS
238 236 238
AMPS
25.6 33.4 20.1
AMPS
19.0 25.5 15.0
WATTS
4898 6002 3666
WATTS
3595 4561 2685
P.F
0.79
P.F
0.77
(678057-W)
F/P 2
10
FAM DIGITAL SDN. BHD.
IMT-GT GREEN INITAITIVE PROJECT 2014 STREET LIGHTING ENERGY EFFICIENCY PROJECT MELAKA, MALAYSIA INSTALLATION DATE : 5/7/2014 SELECTED FEEDER PILLAR NO : FP 6 LOCATION : JALAN TANGKAK - JASIN COMMISIONING DATE : 23/7/2014
BEFORE ENERGY SAVING MODE DURING ENERGY SAVING MODE PHASE RED YELLOW BLUE PHASE RED YELLOW BLUE VOLTS
241 234 239
VOLTS
240 238 240
AMPS
17.4 23.1 20.5
AMPS
13.5 17.1 15.2
WATTS
2814 4194 3877
WATTS
2119 3102 2806
P.F
0.75
P.F
0.73
(678057-W)
F/P 2
11
FAM DIGITAL SDN. BHD.
IMT-GT GREEN INITAITIVE PROJECT 2014 STREET LIGHTING ENERGY EFFICIENCY PROJECT MELAKA, MALAYSIA INSTALLATION DATE : 21/7/2014 SELECTED FEEDER PILLAR NO : FP 1 LOCATION : JALAN SIMPANG PERINGGIT-AIRPORT COMMISIONING DATE : 23/7/2014
BEFORE ENERGY SAVING MODE DURING ENERGY SAVING MODE PHASE RED YELLOW BLUE PHASE RED YELLOW BLUE VOLTS
248 245 242
VOLTS
250 246 241
AMPS
35.8 35.2 35.8
AMPS
26.7 22.7 19.3
WATTS
5254 6329 6581
WATTS
3933 4298 3889
P.F
0.70
P.F
0.72
(678057-W)
F/P 2
12
FAM DIGITAL SDN. BHD.
IMT-GT GREEN INITAITIVE PROJECT 2014 STREET LIGHTING ENERGY EFFICIENCY PROJECT MELAKA, MALAYSIA INSTALLATION DATE : 27/6/2014 SELECTED FEEDER PILLAR NO : FP 2 LOCATION : JALAN SIMPANG PERINGGIT-AIRPORT COMMISIONING DATE : 23/7/2014
BEFORE ENERGY SAVING MODE DURING ENERGY SAVING MODE PHASE RED YELLOW BLUE PHASE RED YELLOW BLUE VOLTS
239 241 242
VOLTS
240 241 243
AMPS
36.0 27.5 32.9
AMPS
25.0 18.0 21.8
WATTS
6248 5290 6558
WATTS
4389 3538 4305
P.F
0.78
P.F
0.80
(678057-W)
F/P 2
13
FAM DIGITAL SDN. BHD.
IMT-GT GREEN INITAITIVE PROJECT 2014 STREET LIGHTING ENERGY EFFICIENCY PROJECT MELAKA, MALAYSIA INSTALLATION DATE : 5/7/2014 SELECTED FEEDER PILLAR NO : FP(M) 3-1 LOCATION : JALAN LORONG PANDAN COMMISIONING DATE : 23/7/2014
BEFORE ENERGY SAVING MODE DURING ENERGY SAVING MODE PHASE RED YELLOW BLUE PHASE RED YELLOW BLUE VOLTS
236 239 233
VOLTS
238 241 235
AMPS
27.1 32.3 41.5
AMPS
20.3 24.0 27.6
WATTS
3892 4584 6168
WATTS
2752 3217 4013
P.F
0.61
P.F
0.58
(678057-W)
F/P 2
14
FAM DIGITAL SDN. BHD.
IMT-GT GREEN INITAITIVE PROJECT 2014 STREET LIGHTING ENERGY EFFICIENCY PROJECT MELAKA, MALAYSIA INSTALLATION DATE : 5/7/2014 SELECTED FEEDER PILLAR NO : FP 2 LOCATION : JALAN LORONG PANDAN COMMISIONING DATE : 23/7/2014
BEFORE ENERGY SAVING MODE DURING ENERGY SAVING MODE PHASE RED YELLOW BLUE PHASE RED YELLOW BLUE VOLTS
250 2349 254
VOLTS
250 250 254
AMPS
37.5 26.6 30.0
AMPS
28.6 20.3 22.2
WATTS
5661 4349 5515
WATTS
4169 3242 3999
P.F
0.66
P.F
0.64
(678057-W)
F/P 2
15
FAM DIGITAL SDN. BHD.
IMT-GT GREEN INITAITIVE PROJECT 2014 STREET LIGHTING ENERGY EFFICIENCY PROJECT MELAKA, MALAYSIA INSTALLATION DATE : 21/7/2014 SELECTED FEEDER PILLAR NO : FP A LOCATION : JALAN SANG LANG COMMISIONING DATE : 23/7/2014
BEFORE ENERGY SAVING MODE DURING ENERGY SAVING MODE PHASE RED YELLOW BLUE PHASE RED YELLOW BLUE VOLTS
254 252 256
VOLTS
255 254 258
AMPS
27.0 35.1 28.8
AMPS
19.4 27.2 20.8
WATTS
4233 5790 4636
WATTS
2989 4372 3295
P.F
0.64
P.F
0.62
(678057-W)
F/P 2
16
FAM DIGITAL SDN. BHD.
IMT-GT GREEN INITAITIVE PROJECT 2014 STREET LIGHTING ENERGY EFFICIENCY PROJECT MELAKA, MALAYSIA INSTALLATION DATE : 21/7/2014 SELECTED FEEDER PILLAR NO : FP1 LOCATION : JALAN BUKIT KATIL COMMISIONING DATE : 23/7/2014
BEFORE ENERGY SAVING MODE DURING ENERGY SAVING MODE PHASE RED YELLOW BLUE PHASE RED YELLOW BLUE VOLTS
232 236 239
VOLTS
233 238 239
AMPS
22.9 24.3 20.7
AMPS
14.5 12.5 14.5
WATTS
3119 5102 3452
WATTS
1935 2878 2521
P.F
0.73
P.F
0.72
(678057-W)
F/P 2
17
FAM DIGITAL SDN. BHD.
IMT-GT GREEN INITAITIVE PROJECT 2014 STREET LIGHTING ENERGY EFFICIENCY PROJECT MELAKA, MALAYSIA INSTALLATION DATE : 21/7/2014 SELECTED FEEDER PILLAR NO : FP 2 LOCATION : BUKIT KATIL COMMISIONING DATE : 23/7/2014
BEFORE ENERGY SAVING MODE DURING ENERGY SAVING MODE PHASE RED YELLOW BLUE PHASE RED YELLOW BLUE VOLTS
240 239 239
VOLTS
241 240 240
AMPS
16.1 18.2 22.7
AMPS
12.0 12.3 15.3
WATTS
2998 2060 2690
WATTS
2274 1627 2092
P.F
0.59
P.F
0.64
(678057-W)
F/P 2
18
FAM DIGITAL SDN. BHD.
IMT-GT GREEN INITAITIVE PROJECT 2014 STREET LIGHTING ENERGY EFFICIENCY PROJECT MELAKA, MALAYSIA INSTALLATION DATE : 21/7/2014 SELECTED FEEDER PILLAR NO : FP A LOCATION : DEPAN TEXAS INSTRUCMENT COMMISIONING DATE : 23/7/2014
BEFORE ENERGY SAVING MODE DURING ENERGY SAVING MODE PHASE RED YELLOW BLUE PHASE RED YELLOW BLUE VOLTS
240 243 244
VOLTS
241 243 244
AMPS
24.1 25.4 22.6
AMPS
15.0 19.6 17.5
WATTS
4560 4039 3913
WATTS
2822 3011 2815
P.F
0.72
P.F
0.69
(678057-W)
F/P 2
19
FAM DIGITAL SDN. BHD.
IMT-GT GREEN INITAITIVE PROJECT 2014 STREET LIGHTING ENERGY EFFICIENCY PROJECT MELAKA, MALAYSIA INSTALLATION DATE : 21/7/2014 SELECTED FEEDER PILLAR NO : FP A LOCATION : JALAN TAMING SARI COMMISIONING DATE : 23/7/2014
BEFORE ENERGY SAVING MODE DURING ENERGY SAVING MODE PHASE RED YELLOW BLUE PHASE RED YELLOW BLUE VOLTS
248 247 247
VOLTS
248 247 247
AMPS
16.9 21.5 16.6
AMPS
21.1 20.6 32.0
WATTS
2889 3601 2762
WATTS
2154 2650 2066
P.F
0.68
P.F
0.66
(678057-W)
20
F/P 2
FAM DIGITAL SDN. BHD.
IMT-GT GREEN INITAITIVE PROJECT 2014 STREET LIGHTING ENERGY EFFICIENCY PROJECT MELAKA, MALAYSIA
(678057-W)
HANDING OVER TO MELAKA CITY CONCILS