GREEN EARTH A PRESENTATION IMT-GT PILOT PROJECT OBJECTIVE : TO INSTALL AND COMMISSION 20 ELECTRICAL MANAGEMENT UNITS (EMU) AT SELECTED STREET LIGHTING FEEDER PILLARS IN MELAKA MELAKA GREEN INITIATIVE OBJECTIVE: TO CONSERVE 30


slide-1
SLIDE 1
slide-2
SLIDE 2

GREEN EARTH

A PRESENTATION

slide-3
SLIDE 3
slide-4
SLIDE 4
slide-5
SLIDE 5

IMT-GT PILOT PROJECT OBJECTIVE : “TO INSTALL AND COMMISSION 20 ELECTRICAL MANAGEMENT UNITS (EMU) AT SELECTED STREET LIGHTING FEEDER PILLARS IN MELAKA” MELAKA GREEN INITIATIVE OBJECTIVE: “ TO CONSERVE 30 PERCENT OF ELECTRICAL CONSUMPTION IN ALL TARGETED STREET LIGHTING CIRCUITERY”

  • NO. OF STREET LIGHTINGS FEEDERS: 20 FEEDERS
  • NO. OF COUNCIL PARTICIPATING:1) MAJLIS BANDARAYA MELAKA BERSEJARAH

2) MAJLIS PERBANDARAN HANG TUAH JAYA METHODOLOGY OF COMPLIANCE:

International Performance Measurement and Verification Protocol (IPMVP).

slide-6
SLIDE 6

METHODOLOGY We have taken steps to ensure that the performance measurement and verification of savings are acceptable by international standards. The methodology applied is derived from the International Performance Measurement and Verification Protocol (IPMVP). The IPMVP outlines the methodology of calculating savings for an

  • EEM. It also outlines the various ways of determining the

performance measurement and verification. For this pilot project, we chose to apply the “Retrofit Isolation”

  • method. This is due to the fact:
  • The circuit is isolated from other circuits.
  • It has its own metering device.
  • It is typical of most street lighting circuits.
  • The circuit only consists of lighting load.
  • There are no fluctuations in terms of load and hours of operation.
  • The ambient temperature and humidity level for our country is

consistent.

slide-7
SLIDE 7

Based on the methodology, we are able to derive a substantially accurate level of savings. We are able to eliminate uncertain variables such as load changes, variation in operation hours, climatic changes and effects from other non-lighting loads. As such, the savings calculations can be simply derived by comparing pre and post retrofit daily averages from monthly billings issued by the utility company.

METHODOLOGY

slide-8
SLIDE 8

ILLUSTRATION FROM PREVIOUS INSTALLATION IN 2009 PILOT PROJECT REPORT

slide-9
SLIDE 9
slide-10
SLIDE 10

IMT-GT PILOT PROJECT 2014 IMPLEMENTATION PROCESS

1) FEEDER SELECTION 2) FOOTING WORKS AT SITE 3) INSTALLATION WORKS AT SITE 4) COMMISSIONING AT SITE

slide-11
SLIDE 11

IMT-GT PILOT PROJECT 2014 TIME-LINE

RECEIVED FEEDER PILLARS KEYS FOR PROJECT IMPLEMENTATION FROM RESPECTIVE COUNCILS 16 JUNE 2014 17 JUNE 2014

FOOTING AND INSTALLATION WORKS COMMENCE

23 JULY 2014

INSTALLATION WORKS COMPLETE

TESTING AND COMMISSIONING

28 JULY 2014 10&11 SEPT 2014

HANDING-OVER TO CITY COUNCIL

slide-12
SLIDE 12

FEEDER SELECTION

slide-13
SLIDE 13

SELECTED CITY COUNCIL STREET LIGHTINGS FEEDER PILLAR ELECTRICAL MANAGEMENT UNIT (EMU) N E W F O O T I N G CABLE CONNECTION

FOOTING SCHEMATICS

4’ 2’ 4’

slide-14
SLIDE 14

FOOTING WORKS

slide-15
SLIDE 15
slide-16
SLIDE 16

FAM DIGITAL SDN. BHD.

IMT-GT GREEN INITAITIVE PROJECT 2014 STREET LIGHTING ENERGY EFFICIENCY PROJECT MELAKA, MALAYSIA

(678057-W)

slide-17
SLIDE 17

FAM DIGITAL SDN. BHD.

IMT-GT GREEN INITAITIVE PROJECT 2014 STREET LIGHTING ENERGY EFFICIENCY PROJECT MELAKA, MALAYSIA INSTALLATION DATE : 27/6/2014 SELECTED FEEDER PILLAR NO : FP1 LOCATION : LEBUHRAYA AYER KEROH COMMISIONING DATE : 23/7/2014

BEFORE ENERGY SAVING MODE DURING ENERGY SAVING MODE PHASE RED YELLOW BLUE PHASE RED YELLOW BLUE VOLTS

243 233 238

VOLTS

244 233 240

AMPS

27.3 27.4 41.5

AMPS

21.1 20.6 32.0

WATTS

4306 5147 7747

WATTS

3196 3794 6045

P.F

0.75

P.F

0.75

(678057-W)

1

slide-18
SLIDE 18

FAM DIGITAL SDN. BHD.

IMT-GT GREEN INITAITIVE PROJECT 2014 STREET LIGHTING ENERGY EFFICIENCY PROJECT MELAKA, MALAYSIA INSTALLATION DATE : 27/6/2014 SELECTED FEEDER PILLAR NO : FP 2 LOCATION : LEBUHRAYA AYER KEROH COMMISIONING DATE : 23/7/2014

BEFORE ENERGY SAVING MODE DURING ENERGY SAVING MODE PHASE RED YELLOW BLUE PHASE RED YELLOW BLUE VOLTS

239 239 241

VOLTS

240 240 242

AMPS

31.5 33.7 29.4

AMPS

23.8 24.8 21.9

WATTS

5692 5816 4927

WATTS

4254 4279 3644

P.F

0.73

P.F

0.72

(678057-W)

F/P 2

2

slide-19
SLIDE 19

FAM DIGITAL SDN. BHD.

IMT-GT GREEN INITAITIVE PROJECT 2014 STREET LIGHTING ENERGY EFFICIENCY PROJECT MELAKA, MALAYSIA INSTALLATION DATE : 27/6/2014 SELECTED FEEDER PILLAR NO : FP1-14 LOCATION : LEBUHRAYA AMJ COMMISIONING DATE : 23/7/2014

BEFORE ENERGY SAVING MODE DURING ENERGY SAVING MODE PHASE RED YELLOW BLUE PHASE RED YELLOW BLUE VOLTS

237 231 237

VOLTS

237 232 237

AMPS

23.7 39.7 25.7

AMPS

17.1 27.5 18.8

WATTS

4237 5937 4174

WATTS

2955 4859 2961

P.F

0.74

P.F

0.73

(678057-W)

F/P 2

3

slide-20
SLIDE 20

FAM DIGITAL SDN. BHD.

IMT-GT GREEN INITAITIVE PROJECT 2014 STREET LIGHTING ENERGY EFFICIENCY PROJECT MELAKA, MALAYSIA INSTALLATION DATE : 27/6/2014 SELECTED FEEDER PILLAR NO : FP 2-3 LOCATION : LEBUHRAYA AMJ COMMISIONING DATE : 23/7/2014

BEFORE ENERGY SAVING MODE DURING ENERGY SAVING MODE PHASE RED YELLOW BLUE PHASE RED YELLOW BLUE VOLTS

248 247 249

VOLTS

248 247 250

AMPS

26.7 41.0 38.0

AMPS

19.8 30.5 27.8

WATTS

4753 6474 5712

WATTS

2965 3815 4141

P.F

0.61

P.F

0.62

(678057-W)

F/P 2

4

slide-21
SLIDE 21

FAM DIGITAL SDN. BHD.

IMT-GT GREEN INITAITIVE PROJECT 2014 STREET LIGHTING ENERGY EFFICIENCY PROJECT MELAKA, MALAYSIA INSTALLATION DATE : 27/6/2014 SELECTED FEEDER PILLAR NO : FP 2-8 LOCATION : LEBUHRAYA AMJ COMMISIONING DATE : 23/7/2014

BEFORE ENERGY SAVING MODE DURING ENERGY SAVING MODE PHASE RED YELLOW BLUE PHASE RED YELLOW BLUE VOLTS

252 252 251

VOLTS

253 253 252

AMPS

32.6 29.1 36.7

AMPS

25.3 22.3 27.3

WATTS

6523 5536 6597

WATTS

5203 3914 4990

P.F

0.81

P.F

0.77

(678057-W)

5

slide-22
SLIDE 22

FAM DIGITAL SDN. BHD.

IMT-GT GREEN INITAITIVE PROJECT 2014 STREET LIGHTING ENERGY EFFICIENCY PROJECT MELAKA, MALAYSIA INSTALLATION DATE : 27/6/2014 SELECTED FEEDER PILLAR NO : FP 2-11 LOCATION : LEBUHRAYA AMJ COMMISIONING DATE : 23/7/2014

BEFORE ENERGY SAVING MODE DURING ENERGY SAVING MODE PHASE RED YELLOW BLUE PHASE RED YELLOW BLUE VOLTS

233 228 240

VOLTS

234 231 239

AMPS

35.7 43.2 16.6

AMPS

27.3 32.8 12.7

WATTS

5743 6590 2583

WATTS

4413 4939 1883

P.F

0.68

P.F

0.66

(678057-W)

6

slide-23
SLIDE 23

FAM DIGITAL SDN. BHD.

IMT-GT GREEN INITAITIVE PROJECT 2014 STREET LIGHTING ENERGY EFFICIENCY PROJECT MELAKA, MALAYSIA INSTALLATION DATE : 21/7/2014 SELECTED FEEDER PILLAR NO : FP 2 LOCATION : JALAN TANGKAK - JASIN COMMISIONING DATE : 23/7/2014

BEFORE ENERGY SAVING MODE DURING ENERGY SAVING MODE PHASE RED YELLOW BLUE PHASE RED YELLOW BLUE VOLTS

240 240 240

VOLTS

240 240 240

AMPS

14.2 13.2 10.7

AMPS

11.0 9.31 7.92

WATTS

2643 2478 2132

WATTS

2450 1885 1654

P.F

0.87

P.F

0.88

(678057-W)

7

slide-24
SLIDE 24

FAM DIGITAL SDN. BHD.

IMT-GT GREEN INITAITIVE PROJECT 2014 STREET LIGHTING ENERGY EFFICIENCY PROJECT MELAKA, MALAYSIA INSTALLATION DATE : 22/7/2014 SELECTED FEEDER PILLAR NO : FP 3 LOCATION : JALAN TANGKAK - JASIN COMMISIONING DATE : 23/7/2014

BEFORE ENERGY SAVING MODE DURING ENERGY SAVING MODE PHASE RED YELLOW BLUE PHASE RED YELLOW BLUE VOLTS

244 243 243

VOLTS

243 242 243

AMPS

36.8 36.5 33.8

AMPS

25.6 27.4 24.5

WATTS

6497 6223 6092

WATTS

4450 4559 4339

P.F

0.73

P.F

0.71

(678057-W)

8

slide-25
SLIDE 25

FAM DIGITAL SDN. BHD.

IMT-GT GREEN INITAITIVE PROJECT 2014 STREET LIGHTING ENERGY EFFICIENCY PROJECT MELAKA, MALAYSIA INSTALLATION DATE : 21/7/2014 SELECTED FEEDER PILLAR NO : FP 4 LOCATION : LEBUHRAYA AMJ COMMISIONING DATE : 23/7/2014

BEFORE ENERGY SAVING MODE DURING ENERGY SAVING MODE PHASE RED YELLOW BLUE PHASE RED YELLOW BLUE VOLTS

229 230 237

VOLTS

232 233 240

AMPS

34.5 34.9 28.0

AMPS

25.8 26.5 20.9

WATTS

5825 5724 4751

WATTS

4438 4353 3509

P.F

0.73

P.F

0.72

(678057-W)

F/P 2

9

slide-26
SLIDE 26

FAM DIGITAL SDN. BHD.

IMT-GT GREEN INITAITIVE PROJECT 2014 STREET LIGHTING ENERGY EFFICIENCY PROJECT MELAKA, MALAYSIA INSTALLATION DATE : 5/7/2014 SELECTED FEEDER PILLAR NO : FP 5 LOCATION : JALAN TANGKAK - JASIN COMMISIONING DATE : 23/7/2014

BEFORE ENERGY SAVING MODE DURING ENERGY SAVING MODE PHASE RED YELLOW BLUE PHASE RED YELLOW BLUE VOLTS

237 233 236

VOLTS

238 236 238

AMPS

25.6 33.4 20.1

AMPS

19.0 25.5 15.0

WATTS

4898 6002 3666

WATTS

3595 4561 2685

P.F

0.79

P.F

0.77

(678057-W)

F/P 2

10

slide-27
SLIDE 27

FAM DIGITAL SDN. BHD.

IMT-GT GREEN INITAITIVE PROJECT 2014 STREET LIGHTING ENERGY EFFICIENCY PROJECT MELAKA, MALAYSIA INSTALLATION DATE : 5/7/2014 SELECTED FEEDER PILLAR NO : FP 6 LOCATION : JALAN TANGKAK - JASIN COMMISIONING DATE : 23/7/2014

BEFORE ENERGY SAVING MODE DURING ENERGY SAVING MODE PHASE RED YELLOW BLUE PHASE RED YELLOW BLUE VOLTS

241 234 239

VOLTS

240 238 240

AMPS

17.4 23.1 20.5

AMPS

13.5 17.1 15.2

WATTS

2814 4194 3877

WATTS

2119 3102 2806

P.F

0.75

P.F

0.73

(678057-W)

F/P 2

11

slide-28
SLIDE 28

FAM DIGITAL SDN. BHD.

IMT-GT GREEN INITAITIVE PROJECT 2014 STREET LIGHTING ENERGY EFFICIENCY PROJECT MELAKA, MALAYSIA INSTALLATION DATE : 21/7/2014 SELECTED FEEDER PILLAR NO : FP 1 LOCATION : JALAN SIMPANG PERINGGIT-AIRPORT COMMISIONING DATE : 23/7/2014

BEFORE ENERGY SAVING MODE DURING ENERGY SAVING MODE PHASE RED YELLOW BLUE PHASE RED YELLOW BLUE VOLTS

248 245 242

VOLTS

250 246 241

AMPS

35.8 35.2 35.8

AMPS

26.7 22.7 19.3

WATTS

5254 6329 6581

WATTS

3933 4298 3889

P.F

0.70

P.F

0.72

(678057-W)

F/P 2

12

slide-29
SLIDE 29

FAM DIGITAL SDN. BHD.

IMT-GT GREEN INITAITIVE PROJECT 2014 STREET LIGHTING ENERGY EFFICIENCY PROJECT MELAKA, MALAYSIA INSTALLATION DATE : 27/6/2014 SELECTED FEEDER PILLAR NO : FP 2 LOCATION : JALAN SIMPANG PERINGGIT-AIRPORT COMMISIONING DATE : 23/7/2014

BEFORE ENERGY SAVING MODE DURING ENERGY SAVING MODE PHASE RED YELLOW BLUE PHASE RED YELLOW BLUE VOLTS

239 241 242

VOLTS

240 241 243

AMPS

36.0 27.5 32.9

AMPS

25.0 18.0 21.8

WATTS

6248 5290 6558

WATTS

4389 3538 4305

P.F

0.78

P.F

0.80

(678057-W)

F/P 2

13

slide-30
SLIDE 30

FAM DIGITAL SDN. BHD.

IMT-GT GREEN INITAITIVE PROJECT 2014 STREET LIGHTING ENERGY EFFICIENCY PROJECT MELAKA, MALAYSIA INSTALLATION DATE : 5/7/2014 SELECTED FEEDER PILLAR NO : FP(M) 3-1 LOCATION : JALAN LORONG PANDAN COMMISIONING DATE : 23/7/2014

BEFORE ENERGY SAVING MODE DURING ENERGY SAVING MODE PHASE RED YELLOW BLUE PHASE RED YELLOW BLUE VOLTS

236 239 233

VOLTS

238 241 235

AMPS

27.1 32.3 41.5

AMPS

20.3 24.0 27.6

WATTS

3892 4584 6168

WATTS

2752 3217 4013

P.F

0.61

P.F

0.58

(678057-W)

F/P 2

14

slide-31
SLIDE 31

FAM DIGITAL SDN. BHD.

IMT-GT GREEN INITAITIVE PROJECT 2014 STREET LIGHTING ENERGY EFFICIENCY PROJECT MELAKA, MALAYSIA INSTALLATION DATE : 5/7/2014 SELECTED FEEDER PILLAR NO : FP 2 LOCATION : JALAN LORONG PANDAN COMMISIONING DATE : 23/7/2014

BEFORE ENERGY SAVING MODE DURING ENERGY SAVING MODE PHASE RED YELLOW BLUE PHASE RED YELLOW BLUE VOLTS

250 2349 254

VOLTS

250 250 254

AMPS

37.5 26.6 30.0

AMPS

28.6 20.3 22.2

WATTS

5661 4349 5515

WATTS

4169 3242 3999

P.F

0.66

P.F

0.64

(678057-W)

F/P 2

15

slide-32
SLIDE 32

FAM DIGITAL SDN. BHD.

IMT-GT GREEN INITAITIVE PROJECT 2014 STREET LIGHTING ENERGY EFFICIENCY PROJECT MELAKA, MALAYSIA INSTALLATION DATE : 21/7/2014 SELECTED FEEDER PILLAR NO : FP A LOCATION : JALAN SANG LANG COMMISIONING DATE : 23/7/2014

BEFORE ENERGY SAVING MODE DURING ENERGY SAVING MODE PHASE RED YELLOW BLUE PHASE RED YELLOW BLUE VOLTS

254 252 256

VOLTS

255 254 258

AMPS

27.0 35.1 28.8

AMPS

19.4 27.2 20.8

WATTS

4233 5790 4636

WATTS

2989 4372 3295

P.F

0.64

P.F

0.62

(678057-W)

F/P 2

16

slide-33
SLIDE 33

FAM DIGITAL SDN. BHD.

IMT-GT GREEN INITAITIVE PROJECT 2014 STREET LIGHTING ENERGY EFFICIENCY PROJECT MELAKA, MALAYSIA INSTALLATION DATE : 21/7/2014 SELECTED FEEDER PILLAR NO : FP1 LOCATION : JALAN BUKIT KATIL COMMISIONING DATE : 23/7/2014

BEFORE ENERGY SAVING MODE DURING ENERGY SAVING MODE PHASE RED YELLOW BLUE PHASE RED YELLOW BLUE VOLTS

232 236 239

VOLTS

233 238 239

AMPS

22.9 24.3 20.7

AMPS

14.5 12.5 14.5

WATTS

3119 5102 3452

WATTS

1935 2878 2521

P.F

0.73

P.F

0.72

(678057-W)

F/P 2

17

slide-34
SLIDE 34

FAM DIGITAL SDN. BHD.

IMT-GT GREEN INITAITIVE PROJECT 2014 STREET LIGHTING ENERGY EFFICIENCY PROJECT MELAKA, MALAYSIA INSTALLATION DATE : 21/7/2014 SELECTED FEEDER PILLAR NO : FP 2 LOCATION : BUKIT KATIL COMMISIONING DATE : 23/7/2014

BEFORE ENERGY SAVING MODE DURING ENERGY SAVING MODE PHASE RED YELLOW BLUE PHASE RED YELLOW BLUE VOLTS

240 239 239

VOLTS

241 240 240

AMPS

16.1 18.2 22.7

AMPS

12.0 12.3 15.3

WATTS

2998 2060 2690

WATTS

2274 1627 2092

P.F

0.59

P.F

0.64

(678057-W)

F/P 2

18

slide-35
SLIDE 35

FAM DIGITAL SDN. BHD.

IMT-GT GREEN INITAITIVE PROJECT 2014 STREET LIGHTING ENERGY EFFICIENCY PROJECT MELAKA, MALAYSIA INSTALLATION DATE : 21/7/2014 SELECTED FEEDER PILLAR NO : FP A LOCATION : DEPAN TEXAS INSTRUCMENT COMMISIONING DATE : 23/7/2014

BEFORE ENERGY SAVING MODE DURING ENERGY SAVING MODE PHASE RED YELLOW BLUE PHASE RED YELLOW BLUE VOLTS

240 243 244

VOLTS

241 243 244

AMPS

24.1 25.4 22.6

AMPS

15.0 19.6 17.5

WATTS

4560 4039 3913

WATTS

2822 3011 2815

P.F

0.72

P.F

0.69

(678057-W)

F/P 2

19

slide-36
SLIDE 36

FAM DIGITAL SDN. BHD.

IMT-GT GREEN INITAITIVE PROJECT 2014 STREET LIGHTING ENERGY EFFICIENCY PROJECT MELAKA, MALAYSIA INSTALLATION DATE : 21/7/2014 SELECTED FEEDER PILLAR NO : FP A LOCATION : JALAN TAMING SARI COMMISIONING DATE : 23/7/2014

BEFORE ENERGY SAVING MODE DURING ENERGY SAVING MODE PHASE RED YELLOW BLUE PHASE RED YELLOW BLUE VOLTS

248 247 247

VOLTS

248 247 247

AMPS

16.9 21.5 16.6

AMPS

21.1 20.6 32.0

WATTS

2889 3601 2762

WATTS

2154 2650 2066

P.F

0.68

P.F

0.66

(678057-W)

20

F/P 2

slide-37
SLIDE 37

FAM DIGITAL SDN. BHD.

IMT-GT GREEN INITAITIVE PROJECT 2014 STREET LIGHTING ENERGY EFFICIENCY PROJECT MELAKA, MALAYSIA

(678057-W)

HANDING OVER TO MELAKA CITY CONCILS