green earth
play

GREEN EARTH A PRESENTATION IMT-GT PILOT PROJECT OBJECTIVE : TO - PowerPoint PPT Presentation

GREEN EARTH A PRESENTATION IMT-GT PILOT PROJECT OBJECTIVE : TO INSTALL AND COMMISSION 20 ELECTRICAL MANAGEMENT UNITS (EMU) AT SELECTED STREET LIGHTING FEEDER PILLARS IN MELAKA MELAKA GREEN INITIATIVE OBJECTIVE: TO CONSERVE 30


  1. GREEN EARTH A PRESENTATION

  2. IMT-GT PILOT PROJECT OBJECTIVE : “TO INSTALL AND COMMISSION 20 ELECTRICAL MANAGEMENT UNITS (EMU) AT SELECTED STREET LIGHTING FEEDER PILLARS IN MELAKA” MELAKA GREEN INITIATIVE OBJECTIVE: “ TO CONSERVE 30 PERCENT OF ELECTRICAL CONSUMPTION IN ALL TARGETED STREET LIGHTING CIRCUITERY” NO. OF STREET LIGHTINGS FEEDERS: 20 FEEDERS NO. OF COUNCIL PARTICIPATING:1) MAJLIS BANDARAYA MELAKA BERSEJARAH 2) MAJLIS PERBANDARAN HANG TUAH JAYA METHODOLOGY OF COMPLIANCE: International Performance Measurement and Verification Protocol (IPMVP) .

  3. METHODOLOGY We have taken steps to ensure that the performance measurement and verification of savings are acceptable by international standards. The methodology applied is derived from the International Performance Measurement and Verification Protocol (IPMVP) . The IPMVP outlines the methodology of calculating savings for an EEM. It also outlines the various ways of determining the performance measurement and verification. For this pilot project, we chose to apply the “Retrofit Isolation” method. This is due to the fact: •The circuit is isolated from other circuits. •It has its own metering device. •It is typical of most street lighting circuits. •The circuit only consists of lighting load. •There are no fluctuations in terms of load and hours of operation. •The ambient temperature and humidity level for our country is consistent.

  4. METHODOLOGY Based on the methodology, we are able to derive a substantially accurate level of savings. We are able to eliminate uncertain variables such as load changes, variation in operation hours, climatic changes and effects from other non-lighting loads. As such, the savings calculations can be simply derived by comparing pre and post retrofit daily averages from monthly billings issued by the utility company.

  5. ILLUSTRATION FROM PREVIOUS INSTALLATION IN 2009 PILOT PROJECT REPORT

  6. IMT-GT PILOT PROJECT 2014 IMPLEMENTATION PROCESS 1) FEEDER SELECTION 2) FOOTING WORKS AT SITE 3) INSTALLATION WORKS AT SITE 4) COMMISSIONING AT SITE

  7. IMT-GT PILOT PROJECT 2014 TIME-LINE 16 JUNE 2014 17 JUNE 2014 23 JULY 2014 28 JULY 2014 10&11 SEPT 2014 TESTING AND COMMISSIONING INSTALLATION WORKS COMPLETE HANDING-OVER TO FOOTING AND INSTALLATION CITY COUNCIL WORKS COMMENCE RECEIVED FEEDER PILLARS KEYS FOR PROJECT IMPLEMENTATION FROM RESPECTIVE COUNCILS

  8. FEEDER SELECTION

  9. SELECTED ELECTRICAL CITY COUNCIL MANAGEMENT STREET UNIT LIGHTINGS (EMU) FEEDER PILLAR 2’ FOOTING G N I T SCHEMATICS O O F W E CABLE CONNECTION N 4’ 4’

  10. FOOTING WORKS

  11. FAM DIGITAL SDN. BHD. (678057-W) IMT-GT GREEN INITAITIVE PROJECT 2014 STREET LIGHTING ENERGY EFFICIENCY PROJECT MELAKA, MALAYSIA

  12. FAM DIGITAL SDN. BHD. (678057-W) IMT-GT GREEN INITAITIVE PROJECT 2014 STREET LIGHTING ENERGY EFFICIENCY PROJECT MELAKA, MALAYSIA INSTALLATION DATE : 27/6/2014 1 SELECTED FEEDER PILLAR NO : FP1 LOCATION : LEBUHRAYA AYER KEROH COMMISIONING DATE : 23/7/2014 BEFORE ENERGY SAVING MODE DURING ENERGY SAVING MODE PHASE RED YELLOW BLUE PHASE RED YELLOW BLUE 243 233 238 244 233 240 VOLTS VOLTS 27.3 27.4 41.5 21.1 20.6 32.0 AMPS AMPS 4306 5147 7747 3196 3794 6045 WATTS WATTS 0.75 0.75 P.F P.F

  13. FAM DIGITAL SDN. BHD. (678057-W) IMT-GT GREEN INITAITIVE PROJECT 2014 STREET LIGHTING ENERGY EFFICIENCY PROJECT MELAKA, MALAYSIA INSTALLATION DATE : 27/6/2014 2 SELECTED FEEDER PILLAR NO : FP 2 LOCATION : LEBUHRAYA AYER KEROH COMMISIONING DATE : 23/7/2014 BEFORE ENERGY SAVING MODE DURING ENERGY SAVING MODE PHASE RED YELLOW BLUE PHASE RED YELLOW BLUE 239 239 241 240 240 242 VOLTS VOLTS 31.5 33.7 29.4 23.8 24.8 21.9 AMPS AMPS 5692 5816 4927 4254 4279 3644 WATTS WATTS 0.73 0.72 P.F P.F F/P 2

  14. FAM DIGITAL SDN. BHD. (678057-W) IMT-GT GREEN INITAITIVE PROJECT 2014 STREET LIGHTING ENERGY EFFICIENCY PROJECT MELAKA, MALAYSIA INSTALLATION DATE : 27/6/2014 3 SELECTED FEEDER PILLAR NO : FP1-14 LOCATION : LEBUHRAYA AMJ COMMISIONING DATE : 23/7/2014 BEFORE ENERGY SAVING MODE DURING ENERGY SAVING MODE PHASE RED YELLOW BLUE PHASE RED YELLOW BLUE 237 231 237 237 232 237 VOLTS VOLTS 23.7 39.7 25.7 17.1 27.5 18.8 AMPS AMPS 4237 5937 4174 2955 4859 2961 WATTS WATTS 0.74 0.73 P.F P.F F/P 2

  15. FAM DIGITAL SDN. BHD. (678057-W) IMT-GT GREEN INITAITIVE PROJECT 2014 STREET LIGHTING ENERGY EFFICIENCY PROJECT MELAKA, MALAYSIA INSTALLATION DATE : 27/6/2014 4 SELECTED FEEDER PILLAR NO : FP 2-3 LOCATION : LEBUHRAYA AMJ COMMISIONING DATE : 23/7/2014 BEFORE ENERGY SAVING MODE DURING ENERGY SAVING MODE PHASE RED YELLOW BLUE PHASE RED YELLOW BLUE 248 247 249 248 247 250 VOLTS VOLTS 26.7 41.0 38.0 19.8 30.5 27.8 AMPS AMPS 4753 6474 5712 2965 3815 4141 WATTS WATTS 0.61 0.62 P.F P.F F/P 2

  16. FAM DIGITAL SDN. BHD. (678057-W) IMT-GT GREEN INITAITIVE PROJECT 2014 STREET LIGHTING ENERGY EFFICIENCY PROJECT MELAKA, MALAYSIA INSTALLATION DATE : 27/6/2014 5 SELECTED FEEDER PILLAR NO : FP 2-8 LOCATION : LEBUHRAYA AMJ COMMISIONING DATE : 23/7/2014 BEFORE ENERGY SAVING MODE DURING ENERGY SAVING MODE PHASE RED YELLOW BLUE PHASE RED YELLOW BLUE 252 252 251 253 253 252 VOLTS VOLTS 32.6 29.1 36.7 25.3 22.3 27.3 AMPS AMPS 6523 5536 6597 5203 3914 4990 WATTS WATTS 0.81 0.77 P.F P.F

  17. FAM DIGITAL SDN. BHD. (678057-W) IMT-GT GREEN INITAITIVE PROJECT 2014 STREET LIGHTING ENERGY EFFICIENCY PROJECT MELAKA, MALAYSIA INSTALLATION DATE : 27/6/2014 6 SELECTED FEEDER PILLAR NO : FP 2-11 LOCATION : LEBUHRAYA AMJ COMMISIONING DATE : 23/7/2014 BEFORE ENERGY SAVING MODE DURING ENERGY SAVING MODE PHASE RED YELLOW BLUE PHASE RED YELLOW BLUE 233 228 240 234 231 239 VOLTS VOLTS 35.7 43.2 16.6 27.3 32.8 12.7 AMPS AMPS 5743 6590 2583 4413 4939 1883 WATTS WATTS 0.68 0.66 P.F P.F

  18. FAM DIGITAL SDN. BHD. (678057-W) IMT-GT GREEN INITAITIVE PROJECT 2014 STREET LIGHTING ENERGY EFFICIENCY PROJECT MELAKA, MALAYSIA INSTALLATION DATE : 21/7/2014 7 SELECTED FEEDER PILLAR NO : FP 2 LOCATION : JALAN TANGKAK - JASIN COMMISIONING DATE : 23/7/2014 BEFORE ENERGY SAVING MODE DURING ENERGY SAVING MODE PHASE RED YELLOW BLUE PHASE RED YELLOW BLUE 240 240 240 240 240 240 VOLTS VOLTS 14.2 13.2 10.7 11.0 9.31 7.92 AMPS AMPS 2643 2478 2132 2450 1885 1654 WATTS WATTS 0.87 0.88 P.F P.F

  19. FAM DIGITAL SDN. BHD. (678057-W) IMT-GT GREEN INITAITIVE PROJECT 2014 STREET LIGHTING ENERGY EFFICIENCY PROJECT MELAKA, MALAYSIA INSTALLATION DATE : 22/7/2014 8 SELECTED FEEDER PILLAR NO : FP 3 LOCATION : JALAN TANGKAK - JASIN COMMISIONING DATE : 23/7/2014 BEFORE ENERGY SAVING MODE DURING ENERGY SAVING MODE PHASE RED YELLOW BLUE PHASE RED YELLOW BLUE 244 243 243 243 242 243 VOLTS VOLTS 36.8 36.5 33.8 25.6 27.4 24.5 AMPS AMPS 6497 6223 6092 4450 4559 4339 WATTS WATTS 0.73 0.71 P.F P.F

  20. FAM DIGITAL SDN. BHD. (678057-W) IMT-GT GREEN INITAITIVE PROJECT 2014 STREET LIGHTING ENERGY EFFICIENCY PROJECT MELAKA, MALAYSIA INSTALLATION DATE : 21/7/2014 9 SELECTED FEEDER PILLAR NO : FP 4 LOCATION : LEBUHRAYA AMJ COMMISIONING DATE : 23/7/2014 BEFORE ENERGY SAVING MODE DURING ENERGY SAVING MODE PHASE RED YELLOW BLUE PHASE RED YELLOW BLUE 229 230 237 232 233 240 VOLTS VOLTS 34.5 34.9 28.0 25.8 26.5 20.9 AMPS AMPS 5825 5724 4751 4438 4353 3509 WATTS WATTS 0.73 0.72 P.F P.F F/P 2

  21. FAM DIGITAL SDN. BHD. (678057-W) IMT-GT GREEN INITAITIVE PROJECT 2014 STREET LIGHTING ENERGY EFFICIENCY PROJECT MELAKA, MALAYSIA INSTALLATION DATE : 5/7/2014 10 SELECTED FEEDER PILLAR NO : FP 5 LOCATION : JALAN TANGKAK - JASIN COMMISIONING DATE : 23/7/2014 BEFORE ENERGY SAVING MODE DURING ENERGY SAVING MODE PHASE RED YELLOW BLUE PHASE RED YELLOW BLUE 237 233 236 238 236 238 VOLTS VOLTS 25.6 33.4 20.1 19.0 25.5 15.0 AMPS AMPS 4898 6002 3666 3595 4561 2685 WATTS WATTS 0.79 0.77 P.F P.F F/P 2

  22. FAM DIGITAL SDN. BHD. (678057-W) IMT-GT GREEN INITAITIVE PROJECT 2014 STREET LIGHTING ENERGY EFFICIENCY PROJECT MELAKA, MALAYSIA INSTALLATION DATE : 5/7/2014 11 SELECTED FEEDER PILLAR NO : FP 6 LOCATION : JALAN TANGKAK - JASIN COMMISIONING DATE : 23/7/2014 BEFORE ENERGY SAVING MODE DURING ENERGY SAVING MODE PHASE RED YELLOW BLUE PHASE RED YELLOW BLUE 241 234 239 240 238 240 VOLTS VOLTS 17.4 23.1 20.5 13.5 17.1 15.2 AMPS AMPS 2814 4194 3877 2119 3102 2806 WATTS WATTS 0.75 0.73 P.F P.F F/P 2

  23. FAM DIGITAL SDN. BHD. (678057-W) IMT-GT GREEN INITAITIVE PROJECT 2014 STREET LIGHTING ENERGY EFFICIENCY PROJECT MELAKA, MALAYSIA INSTALLATION DATE : 21/7/2014 12 SELECTED FEEDER PILLAR NO : FP 1 LOCATION : JALAN SIMPANG PERINGGIT-AIRPORT COMMISIONING DATE : 23/7/2014 BEFORE ENERGY SAVING MODE DURING ENERGY SAVING MODE PHASE RED YELLOW BLUE PHASE RED YELLOW BLUE 248 245 242 250 246 241 VOLTS VOLTS 35.8 35.2 35.8 26.7 22.7 19.3 AMPS AMPS 5254 6329 6581 3933 4298 3889 WATTS WATTS 0.70 0.72 P.F P.F F/P 2

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.

Recommend


More recommend