NMC Infrastructure Technology Upgrade Presented by: Matthew Taljaard Date: June 2019 Version: V3 Disclosure: Controlled Disclosure Contents Technical Scope Technical Returnable Evaluation Process General 2 Technical Scope 1. Scope
Contents
Technical Scope Technical Returnable Evaluation Process General
2
Technical Scope
1. Scope :
- a. Design, supply, delivery, installation, commissioning, support and
training, for the upgrade of the NMC Data Centre Infrastructure for a period of three years.
2. Supplierβs responsibilities:
- a. Design, development, implementation, testing, installation,
commissioning, and support of the solution.
- b. Training and skills transfer on the operation, administration and
maintenance of the solution.
- c. Handover of solution documents (design, planning, maintenance,
administration and operation).
3
Technical Scope
4
Document Title on Tender Bulletin Doc Number Comment Cyber Security Standard NMC 240-55410927 Supporting technical specification for the enquiry. Demilitarised Zone NMC 240-79669677 Supporting technical specification for the enquiry. ET Firewall NMC 240-132935649 Supporting technical specification for the enquiry. ET Firewall Technical Evaluation Criteria 240-132935663 Supporting evaluation criteria for the enquiry. ET Generic Requirements Specification 240-86458714 Supporting technical specification to the main spec, schedule A/B to be completed and returned. ET Information Security Policy 32-85 Supporting technical specification for the enquiry. ET Infrastructure NMC 240-137468166 Main technical specification for the enquiry, schedule A/B to be completed and returned. ET NMC Redundancy Design Standard 240-84323647 Supporting technical specification for the enquiry. ET Support and Maintenance Specification 240-130816381 Supporting technical specification for the enquiry. ET Third Party Access Control Procedure 32-214 Supporting technical specification for the enquiry. ET Virtualization NMC 240-137075397 Supporting technical specification to the main spec, schedule A/B to be completed and returned. Generic Technical Requirements NMC 240-135089195 Supporting technical specification for the enquiry. Technical Evaluation NMC 240-137468184 Main evaluation criteria for the enquiry.
Technical Returnable (1/2)
1. Technical Proposal as per 240-137468166 Section 3.4.1 f)
a. High Level architecture (technology + equipment selection to meet requirements) b. Bill of Materials + quantities (excluding pricing)
2. Project Management Plan as per 240-137468166 Section 3.5 3. Skills, expertise and experience as per 240-137468166 Section 3.6.2
a. Solution delivery experience (case studies, OEM letter of accreditation, ATPs) b. Solution support, maintenance and training experience (resource plan & competencies, case studies, OEM letter of accreditation, support & maintenance proposal, training proposal) c. Spare management philosophy/policy (with lead and turnaround times)
5
Technical Returnable (2/2)
4. Schedule of Compliance :
- a. Completed Schedule A/B for 240-137468166 (with supporting evidence)
- b. Completed Schedule A/B for 240-137075397 (with supporting evidence)
- c. Completed Schedule A/B for , 240-86458715 (with supporting evidence)
6
Technical Evaluation Process (240-1374681840)
Gatekeeper
- Meet all
requirements Desktop Evaluation
- Pass of 70%
Product Risk Evaluation
- Completed
Final Scoring
7
Gatekeepers
8
Requirement Mandatory Is the supplier OEM accredited for all offered equipment or solution (letter from OEM shall be provided as proof of accreditation) Yes Are the resources qualified with relevant competencies/certifications/qualifications? (CVs with associated proofs) Yes Are the resources registered with relevant professional registration bodies? (i.e., ECSA, IITPSA, etc.) Yes Submission of the following completed schedules:
- 1. Schedule A/B of 240-137468166 ET NMC Infrastructure
Upgrade Design Requirement Specification AND;
- 2. Schedule A/B of 240-137075397 ET NMC Virtualization
System Functional Requirement Specification AND;
- 3. Schedule A/B of 240-86458714 Generic Network
Management Solution Standard Yes
Desktop Evaluation Criteria
10
Weight (%) Requirements / Clauses 40% Technical proposal as specified in clause 3.4.1 f) of 240- 137468166 ET NMC Infrastructure Upgrade Design Requirements Specification 10% Project plan as specified in clause 3.5 b) of 240-137468166 ET NMC Infrastructure Upgrade Design Requirements Specification 30% Completed Schedule A/B of 240-137468166 ET NMC Infrastructure Upgrade Design Requirements Specification 10% Completed Schedule A/B of 240-137075397 ET NMC Virtualization Systems Functional Requirement Specification 10% Completed Schedule A/B of 240-86458714 Generic Network Management Solution Standard
Product Risk and Final Scoring
- Product Risk Evaluation
- This stage of the evaluation allows the suppliers to demonstrate their
technical capabilities and clarify any risks that may have been identified in the desktop evaluation.
- This evaluation will be in the form of a site visit to the supplierβs
designated site, or that of one of their customers, or at an Eskom site (where possible).
- A list of questions (questionnaire) will be sent to the qualified
suppliers two weeks prior to the site visit.
- Final Score:
- πππβπππππ πΉπ€πππ£ππ’πππ ππππ π = π΅π€ππ πππ (πΈππ‘ππ’ππ πΉπ€ππππ’πππ ππππ π,
ππ πππ£ππ’ πππ‘π ππππ π)
11
General Clarification
- Section 2.9 β βThe Tenderer shall submit an original tender, plus 1
complete hard copy of the original tender at tender submission deadline.β
- Soft copy on USB is recommended but remember:
- A hard copy is mandatory (evaluation is based only on hard copies)
- Soft copy is only for ease of access to information.
- A soft copy of the Schedule A/B can be provided and is recommended
to be completed and returned.
- N.B. Evidence must state the exact page of a submitted
document where the information is located.
12