Unit 28 Technical Memorandum 1 Unit 28 Remedial Action Unit 28: 107 acres Fieldwork completed in June 2017 212 MEC items recovered (See MEC Recovery Table) 2 Unit 28 Inaccessible Areas Extreme terrain within Unit 28


  1. Unit 28 Technical Memorandum 1

  2. Unit 28 Remedial Action • Unit 28: 107 acres • Fieldwork completed in June 2017 • 212 MEC items recovered (See MEC Recovery Table) 2

  3. Unit 28 Inaccessible Areas • Extreme terrain within Unit 28 presented fieldwork challenges – Surface MEC Removal: 90 acres complete (12 acres inaccessible) – Digital Geophysical Mapping: 63 acres complete (39 acres inaccessible) 3

  4. Unit 28 Sensitive Fuze Type Munitions • 119 sensitive fuze type munitions • Portion of the southern third of the unit recommended for additional evaluation (See Figure 6) 4

  5. Unit 28 Joint Inspection Results • BLM-Army Joint Inspection performed July 2017 • Areas such as erosion features and Impossible Canyon Road reroute may require subsurface MEC removal 5

  6. Technical Memorandum Summary • Remedial objectives have been met for Unit 28 • Likelihood of surface MEC remaining in inaccessible acreage is low • No additional surface MEC remediation is recommended • Recommended evaluation of potential for munitions with sensitive fuzes to remain in the shallow subsurface in Unit 28 “area of concern” • Unit 28 will be included in 2018 annual surface monitoring 6

  7. Track 3 Surface Area Monitoring Reports 1

  8. Objectives • Comply with Track 3 ROD • Address potential changes in site conditions due to erosion • Monitor units/areas until vegetation growth is sufficient to minimize erosion 2

  9. Procedures • Monitor one percent, at minimum of all units/areas in the program • Enhanced surface monitoring in all units/areas with high subsurface anomaly density and UXO with sensitive fuzes 3

  10. Surface Monitoring Program Summary 2017 Additions • Unit 23 • Unit 5A • Unit 9 2018 Additions • Unit 25 • Unit 28 • Recommended continue monitoring in all units/areas except Units 4 and 34 • 2018 Surface Monitoring scheduled for Spring 4

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.