Surface Protection Presented by : PT Ranadityo Sukses Makmur - - PowerPoint PPT Presentation

surface protection
SMART_READER_LITE
LIVE PREVIEW

Surface Protection Presented by : PT Ranadityo Sukses Makmur - - PowerPoint PPT Presentation

RUBBER LINING Surface Protection Presented by : PT Ranadityo Sukses Makmur Authorized Distributor of Bando Rubber Lining Jl. Bakti 4 Kav. 52, Cilandak KKO, Cilandak Timur, Pasar Minggu, Jaksel 12560 Phone. (021) 30338828 / 7823856 ; Fax. (021)


slide-1
SLIDE 1

RUBBER LINING

Surface Protection

Presented by : PT Ranadityo Sukses Makmur Authorized Distributor of Bando Rubber Lining

  • Jl. Bakti 4 Kav. 52, Cilandak KKO, Cilandak Timur, Pasar Minggu, Jaksel 12560
  • Phone. (021) 30338828 / 7823856 ; Fax. (021) 7823856
  • Email. sales@ranadityo.co.id / ranadityo_suksesmakmur@yahoo.com
  • Website. www.ranadityo.co.id
slide-2
SLIDE 2

Purpose Use of Rubber Lining

The purpose of the use of rubber lining is to protect an equipment against corrosion / rust and chemicals that abbrasive and other ingredients such as sea water, acid, sand, slurry, etc., which can damage an equipment.

slide-3
SLIDE 3
  • 1. HOT BONDING

Process Rubber Sheet Unvulcanized

2.COLD BONDING

Process Rubber Sheet Vulcanized

Application Method of Rubber Lining

slide-4
SLIDE 4

FOR COLD BONDING FOR HOT BONDING

LAYING OF SHEET ON THE SURFACE TO BE LINED

RAW MATERIAL WEIGHING PLASTICIZING/MIXING

(BANBURY/KNEADER/OPEN MILL)

FORMING / SHEETING

(ROLLER HEAD – EXTRUDER / CALENDER)

WINDING OF GREEN SHEET DELIVERY DELIVERY CURING OF SHEET

( ROTO CURE )

BUFFING OF SURFACE TO BE APPLIED TANK SHOT BLASTING OF SURFACE TO BE LINED APPLICATION OF BONDING AGENT ROOM TEMPERATURE CURING AUTO CLAVE FINISHING FINISHING FINAL INSPECTION FINAL INSPECTION GREEN SHEET CUTTING INTO REQUIRED LENGTH

FLOW CHART RUBBER SHEET PROCESS AND APPLICATION

slide-5
SLIDE 5

Material Type Method Service Temperature Recommended Usage In Industry

Hard Rubber BI-H-10 Hot Bonding Below 90 C Brine Storage, Hcl Storage, Caustic soda storage tank, H3PO4 Tank, H2SO4 etc. BI-H-20 Hot Bonding Below 90 C Brine Storage, Hcl Storage, Caustic soda storage tank, H3PO4 Tank, H2SO4 etc. BI-H-30 Hot Bonding Below 90 C Aplication where low Ca, Mg ions are demanded Soft Rubber BI-S-N Cold Bonding Below 90C Acid Storage tank, Anion, cation, Cation Exchanger, water Storage tank etc. BI-S-A Hot & Cold Bonding Below 90C BI-S-11 Hot & Cold Bonding Below 90C Acid Storage tank, Anion, Cation Exchanger, Hcl Storage Tank, Phosphoric acid storage tank, ZnCl2 Reaction tank EPDM RUBBER BI-EP-V Cold Bonding Below 135C Sea water piping, Cooling system piping, water boxes etc. CLOROPRENE RUBBER BI-CR-V Hot & Cold Bonding Below 100C Sea water piping, Cooling system piping, water boxes etc. NITRILE RUBBER BI-NBR-V Cold Bonding Below 100C Storage tank for petroleum oils BUTYL RUBBER BI-BUTYL-V Hot & Cold Bonding Below 125C Corosive Chemicals, Hypochlorite etc

Material & Specification

slide-6
SLIDE 6

Lining Method for Hot Bonding

  • All substrate surface to be lined is inspected visually before shotblasting.
  • All Surfaces to be lined shall be blasted.

Rubber Sheet Rubber Adhesive Bonding Agent Substrate/Stee l

  • 2. Adhesive Application
  • 1. Surface Preparation

Primer

slide-7
SLIDE 7

Application of the Rubber Sheet

  • 1. Individual sheet shall be spread on

the working table and edges shall be beveled to make overlap scraf joints. Overlap scraf joints shall be made so that the overlap follow the direction

  • f flow.
  • 2. Applying the lining sheet to the

substrate.

  • 3. All sheet and joints shall be checked

visually and pinholes testing shall be done to detect defects.

  • 4. Rubber sheet edge shell be cut

scantly at the width about 2,5t using soldering iron of knife.

  • 5. For joints, the length of overlap is

about 10 – 30 mm for shell and flat area, and internal support and flange area will be 10 – 30 mm.

Rubber Sheet

10mm – 30 mm

t 2.5 x t

Rubber Sheet

Substrate/Steel

slide-8
SLIDE 8

Curing Procedure

  • Steam pressure shall be kept constantly
  • Curing Steam pressure max 4,0 kg/cm²
  • Time max 4 hours
  • 1. Autoclave Cure
  • 2. Exhaust Steam Cure

The equipment which can not be put into autoclave shall be cured with steam at ambient pressure.

slide-9
SLIDE 9

Inspection Procedure

  • 1. Surface Cleanliness
  • 2. Quality of the lining and bonding materials
  • 3. Visual check before curing
  • 4. Visual check after curing
  • 5. Hardness Test
  • 6. Spark Test / Pinhole Test
  • 7. Bonding Strength Test
slide-10
SLIDE 10

Lining Method for Cold Bonding

  • 1. Surface Preparation
  • 2. Sheet Preparation
  • 3. Application Rubber Sheet

Rubber Sheet Adhesive Primer Substrate

slide-11
SLIDE 11

Inspection Procedure

  • 1. Surface Cleanliness
  • 2. Spark Test
  • 3. Hardness
  • 4. Thickness
slide-12
SLIDE 12

Production Facility

ROLLER HEAD ROTO-CURE

slide-13
SLIDE 13

Laboratory Facility

Our Quality Assurance procedures are based on ISO- 9001-2000/ISO-TS 16949- 2002 recommendations and cover related activities to control the manufacturing process. We have a full- fledged laboratory with sophisticated testing equipments for analysis of raw-materials, in-process material and finish goods.

Rheometer Mooney Viscosity Abrasion Tester Type DIN

slide-14
SLIDE 14

Work Reference

slide-15
SLIDE 15

15

slide-16
SLIDE 16

Work Reference

Sea Water Pipe

slide-17
SLIDE 17

Work Reference