Study Goals Prio ritize Mia mi-Da de e le me nta ry a nd K -8 sc - - PowerPoint PPT Presentation
Study Goals Prio ritize Mia mi-Da de e le me nta ry a nd K -8 sc - - PowerPoint PPT Presentation
Study Goals Prio ritize Mia mi-Da de e le me nta ry a nd K -8 sc ho o ls fo r Sa fe Ro ute s to Sc ho o l (SRT S) infra struc ture impro ve me nts De ve lo p SRT S pla ns a nd infra struc ture impro ve me nts fo r 10 prio rity sc
Study Goals
- Prio ritize Mia mi-Da de e le me nta ry a nd K
- 8
sc ho o ls fo r Sa fe Ro ute s to Sc ho o l (SRT S) infra struc ture impro ve me nts
- De ve lo p SRT
S pla ns a nd infra struc ture impro ve me nts fo r 10 prio rity sc ho o ls
- Pre pa re F
DOT SRT S infra struc ture funding a pplic a tio ns fo r the 10 sc ho o ls
E ligible Sc hools
- Number
- f K
- 5/K
- 8 publ
i c sc hool s – 219
- S
RT S pl ans c ompl ete/fundi ng appl i ed – 63
- Number
- f sc hool
s c onsi der ed i n 2011 - 156
Source: Safe Routes to School Guide National Center for SRTS
Pr ior itization F ac tor s
F ac tor Note s
Juve nile pe de stria n c ra she s F ive ye a rs (2005-2009) Pe de stria n a nd b ic yc le c ra she s F ive ye a rs (2005-2009) Stude nts living within 0.5 mile s o f sc ho o l GI S b a se d e stima te s Pe rc e nt stude nts wa lking Wa lkSa fe da ta T ra ffic vo lume o n the ne a re st ma jo r stre e t F DOT a nd Mia mi-Da de Co unty da ta Ve hic le o wne rship pe r ho use ho ld Mia mi-Da de MPO L RT P Prio ritiza tio n wa s b a se d o n c o mpo site ra nk o f individua l fa c to rs
Sc hool Addr e ss Munic ipality
Je sse J. Mc Cra ry Jr. E le me nta ry 514 NW 77T H ST Mia mi K e nsing to n Pa rk E le me nta ry 711 NW 30T H AVE Mia mi L ind a L e ntin K
- 8 Ce nte r
14312 NE 2ND CT Uninc o rpo ra te d Na tura l Brid g e E le me nta ry 1650 NE 141ST ST No rth Mia mi No rth Hia le a h E le me nta ry 4251 E 5T H AVE Hia le a h Oa k Gro ve E le me nta ry 15640 NE 8T H AVE Uninc o rpo ra te d Phillis Whe a tle y E le me nta ry 1801 NW 1ST PL Mia mi Phyllis Ruth Mille r E le me nta ry 840 NE 87T H ST Mia mi Sa nta Cla ra E le me nta ry 1051 NW 29T H T E R Mia mi T
- ussa int L
'o uve rture E le me nta ry 120 NE 59T H ST Mia mi
T e n Pr ior ity Sc hools
SRT S Plan De ve lopme nt
- Mia mi-Da de Pub lic Sc ho o ls Co mmunity
T ra ffic Sa fe ty T e a m se rve d a s Study Adviso ry Co mmitte e
- E
xte nsive c o o rdina tio n with sc ho o l sta ff a nd pa re nts thro ug h me e ting s a nd surve ys
- Ma jo rity o f impro ve me nts lo c a te d within
0.5 mile s o f sc ho o l
Je sse J. Mc Cra ry Jr. E le me nta ry
- T
ypic a l impro ve me nts
– Side wa lks a nd c ro sswa lks – Sig na l upg ra de s
- Appro xima te c o st - $125,000*
*Includes contingency, mobilization, maintenance of traffic, preliminary engineering, and construction engineering inspection costs.
1 1 2 2
Ke nsing ton Pa rk E le me nta ry
- T
ypic a l impro ve me nts
– Side wa lks, c ro sswa lks, a nd sig na g e – Sc ho o l zo ne fla she rs
- Appro xima te c o st - $135,000*
*Includes contingency, mobilization, maintenance of traffic, preliminary engineering, and construction engineering inspection costs.
1 2 1 2
L inda L e ntin K- 8 Ce nte r
- T
ypic a l impro ve me nts
– Side wa lks, c ro sswa lks, a nd sig na g e
- Appro xima te c o st - $170,000*
*Includes contingency, mobilization, maintenance of traffic, preliminary engineering, and construction engineering inspection costs.
1 2 1 2
Na tura l Bridg e E le me nta ry
- T
ypic a l impro ve me nts
– Side wa lks, c ro sswa lks, a nd sig na g e – Sc ho o l zo ne fla she rs, spe e d fe e db a c k
sig ns, a nd re c ta ng ula r ra pid fla shing b e a c o ns
– Re mo ve pe de stria n sig na l o n NE
16 Ave nue
- Appro xima te c o st - $130,000*
*Includes contingency, mobilization, maintenance of traffic, preliminary engineering, and construction engineering inspection costs.
1 2 1 2
North Hia le a h E le me nta ry
- T
ypic a l impro ve me nts
– Side wa lks, c ro sswa lks, a nd sig na g e – Sc ho o l zo ne fla she rs – Re c ta ng ula r ra pid fla shing b e a c o ns
(E nha nc e r)
- Appro xima te c o st - $120,000*
*Includes contingency, mobilization, maintenance of traffic, preliminary engineering, and construction engineering inspection costs.
1 2 1 2
Oa k Grove E le me nta ry
- T
ypic a l impro ve me nts
– Side wa lks, c ro sswa lks, a nd sig na g e – Sc ho o l zo ne fla she rs a nd spe e d fe e db a c k
sig ns
– T
ra ffic sig na l upg ra de s
- Appro xima te c o st - $200,000*
*Includes contingency, mobilization, maintenance of traffic, preliminary engineering, and construction engineering inspection costs.
1 2 1 2
Phillis Whe a tle y E le me nta ry
- T
ypic a l impro ve me nts
– Side wa lks, c ro sswa lks, a nd sig na g e – Sc ho o l zo ne fla she rs a nd spe e d fe e db a c k
sig ns
- Appro xima te c o st - $125,000*
*Includes contingency, mobilization, maintenance of traffic, preliminary engineering, and construction engineering inspection costs.
1 2 1 2
Phyllis Ruth Mille r E le me nta ry
- T
ypic a l impro ve me nts
– Side wa lks, c ro sswa lks, a nd sig na g e – Co untdo wn pe de stria n sig na ls
- Appro xima te c o st - $75,000*
*Includes contingency, mobilization, maintenance of traffic, preliminary engineering, and construction engineering inspection costs.
1 2 1 2
Sa nta Cla ra E le me nta ry
- T
ypic a l impro ve me nts
– Side wa lks, c ro sswa lks, a nd sig na g e – Co untdo wn pe de stria n sig na ls
- Appro xima te c o st - $120,000*
*Includes contingency, mobilization, maintenance of traffic, preliminary engineering, and construction engineering inspection costs.
1 2 1 2
T
- ussa int L
’ouve rture E le me nta ry
- T
ypic a l impro ve me nts
– Side wa lks, c ro sswa lks, a nd sig na g e – Re c ta ng ula r ra pid fla shing b e a c o ns
(e nha nc e r)
– Co untdo wn pe de stria n sig na ls
- Appro xima te c o st - $155,000*
*Cost estimate is being revised to incorporate additional improvements.
1 2 1 2
Gr ant Applic ations
- De ve lo pe d pe r F
DOT ’ S SRT S g uide line s
- Co o rdina te d with MDC PWD a nd Sc ho o l
Bo a rd to pre pa re a pplic a tio ns
- T
- ta l funding re q ue st fo r 10 sc ho o ls is
a ppro xima te ly $1.4 millio n
- Se le c te d pro je c ts a re e xpe c te d to b e