Study Goals Prio ritize Mia mi-Da de e le me nta ry a nd K -8 sc - - PowerPoint PPT Presentation

study goals
SMART_READER_LITE
LIVE PREVIEW

Study Goals Prio ritize Mia mi-Da de e le me nta ry a nd K -8 sc - - PowerPoint PPT Presentation

Study Goals Prio ritize Mia mi-Da de e le me nta ry a nd K -8 sc ho o ls fo r Sa fe Ro ute s to Sc ho o l (SRT S) infra struc ture impro ve me nts De ve lo p SRT S pla ns a nd infra struc ture impro ve me nts fo r 10 prio rity sc


slide-1
SLIDE 1
slide-2
SLIDE 2

Study Goals

  • Prio ritize Mia mi-Da de e le me nta ry a nd K
  • 8

sc ho o ls fo r Sa fe Ro ute s to Sc ho o l (SRT S) infra struc ture impro ve me nts

  • De ve lo p SRT

S pla ns a nd infra struc ture impro ve me nts fo r 10 prio rity sc ho o ls

  • Pre pa re F

DOT SRT S infra struc ture funding a pplic a tio ns fo r the 10 sc ho o ls

slide-3
SLIDE 3

E ligible Sc hools

  • Number
  • f K
  • 5/K
  • 8 publ

i c sc hool s – 219

  • S

RT S pl ans c ompl ete/fundi ng appl i ed – 63

  • Number
  • f sc hool

s c onsi der ed i n 2011 - 156

Source: Safe Routes to School Guide National Center for SRTS

slide-4
SLIDE 4

Pr ior itization F ac tor s

F ac tor Note s

Juve nile pe de stria n c ra she s F ive ye a rs (2005-2009) Pe de stria n a nd b ic yc le c ra she s F ive ye a rs (2005-2009) Stude nts living within 0.5 mile s o f sc ho o l GI S b a se d e stima te s Pe rc e nt stude nts wa lking Wa lkSa fe da ta T ra ffic vo lume o n the ne a re st ma jo r stre e t F DOT a nd Mia mi-Da de Co unty da ta Ve hic le o wne rship pe r ho use ho ld Mia mi-Da de MPO L RT P Prio ritiza tio n wa s b a se d o n c o mpo site ra nk o f individua l fa c to rs

slide-5
SLIDE 5

Sc hool Addr e ss Munic ipality

Je sse J. Mc Cra ry Jr. E le me nta ry 514 NW 77T H ST Mia mi K e nsing to n Pa rk E le me nta ry 711 NW 30T H AVE Mia mi L ind a L e ntin K

  • 8 Ce nte r

14312 NE 2ND CT Uninc o rpo ra te d Na tura l Brid g e E le me nta ry 1650 NE 141ST ST No rth Mia mi No rth Hia le a h E le me nta ry 4251 E 5T H AVE Hia le a h Oa k Gro ve E le me nta ry 15640 NE 8T H AVE Uninc o rpo ra te d Phillis Whe a tle y E le me nta ry 1801 NW 1ST PL Mia mi Phyllis Ruth Mille r E le me nta ry 840 NE 87T H ST Mia mi Sa nta Cla ra E le me nta ry 1051 NW 29T H T E R Mia mi T

  • ussa int L

'o uve rture E le me nta ry 120 NE 59T H ST Mia mi

T e n Pr ior ity Sc hools

slide-6
SLIDE 6

SRT S Plan De ve lopme nt

  • Mia mi-Da de Pub lic Sc ho o ls Co mmunity

T ra ffic Sa fe ty T e a m se rve d a s Study Adviso ry Co mmitte e

  • E

xte nsive c o o rdina tio n with sc ho o l sta ff a nd pa re nts thro ug h me e ting s a nd surve ys

  • Ma jo rity o f impro ve me nts lo c a te d within

0.5 mile s o f sc ho o l

slide-7
SLIDE 7

Je sse J. Mc Cra ry Jr. E le me nta ry

  • T

ypic a l impro ve me nts

– Side wa lks a nd c ro sswa lks – Sig na l upg ra de s

  • Appro xima te c o st - $125,000*

*Includes contingency, mobilization, maintenance of traffic, preliminary engineering, and construction engineering inspection costs.

slide-8
SLIDE 8

1 1 2 2

slide-9
SLIDE 9

Ke nsing ton Pa rk E le me nta ry

  • T

ypic a l impro ve me nts

– Side wa lks, c ro sswa lks, a nd sig na g e – Sc ho o l zo ne fla she rs

  • Appro xima te c o st - $135,000*

*Includes contingency, mobilization, maintenance of traffic, preliminary engineering, and construction engineering inspection costs.

slide-10
SLIDE 10

1 2 1 2

slide-11
SLIDE 11

L inda L e ntin K- 8 Ce nte r

  • T

ypic a l impro ve me nts

– Side wa lks, c ro sswa lks, a nd sig na g e

  • Appro xima te c o st - $170,000*

*Includes contingency, mobilization, maintenance of traffic, preliminary engineering, and construction engineering inspection costs.

slide-12
SLIDE 12

1 2 1 2

slide-13
SLIDE 13

Na tura l Bridg e E le me nta ry

  • T

ypic a l impro ve me nts

– Side wa lks, c ro sswa lks, a nd sig na g e – Sc ho o l zo ne fla she rs, spe e d fe e db a c k

sig ns, a nd re c ta ng ula r ra pid fla shing b e a c o ns

– Re mo ve pe de stria n sig na l o n NE

16 Ave nue

  • Appro xima te c o st - $130,000*

*Includes contingency, mobilization, maintenance of traffic, preliminary engineering, and construction engineering inspection costs.

slide-14
SLIDE 14

1 2 1 2

slide-15
SLIDE 15

North Hia le a h E le me nta ry

  • T

ypic a l impro ve me nts

– Side wa lks, c ro sswa lks, a nd sig na g e – Sc ho o l zo ne fla she rs – Re c ta ng ula r ra pid fla shing b e a c o ns

(E nha nc e r)

  • Appro xima te c o st - $120,000*

*Includes contingency, mobilization, maintenance of traffic, preliminary engineering, and construction engineering inspection costs.

slide-16
SLIDE 16

1 2 1 2

slide-17
SLIDE 17

Oa k Grove E le me nta ry

  • T

ypic a l impro ve me nts

– Side wa lks, c ro sswa lks, a nd sig na g e – Sc ho o l zo ne fla she rs a nd spe e d fe e db a c k

sig ns

– T

ra ffic sig na l upg ra de s

  • Appro xima te c o st - $200,000*

*Includes contingency, mobilization, maintenance of traffic, preliminary engineering, and construction engineering inspection costs.

slide-18
SLIDE 18

1 2 1 2

slide-19
SLIDE 19

Phillis Whe a tle y E le me nta ry

  • T

ypic a l impro ve me nts

– Side wa lks, c ro sswa lks, a nd sig na g e – Sc ho o l zo ne fla she rs a nd spe e d fe e db a c k

sig ns

  • Appro xima te c o st - $125,000*

*Includes contingency, mobilization, maintenance of traffic, preliminary engineering, and construction engineering inspection costs.

slide-20
SLIDE 20

1 2 1 2

slide-21
SLIDE 21

Phyllis Ruth Mille r E le me nta ry

  • T

ypic a l impro ve me nts

– Side wa lks, c ro sswa lks, a nd sig na g e – Co untdo wn pe de stria n sig na ls

  • Appro xima te c o st - $75,000*

*Includes contingency, mobilization, maintenance of traffic, preliminary engineering, and construction engineering inspection costs.

slide-22
SLIDE 22

1 2 1 2

slide-23
SLIDE 23

Sa nta Cla ra E le me nta ry

  • T

ypic a l impro ve me nts

– Side wa lks, c ro sswa lks, a nd sig na g e – Co untdo wn pe de stria n sig na ls

  • Appro xima te c o st - $120,000*

*Includes contingency, mobilization, maintenance of traffic, preliminary engineering, and construction engineering inspection costs.

slide-24
SLIDE 24

1 2 1 2

slide-25
SLIDE 25

T

  • ussa int L

’ouve rture E le me nta ry

  • T

ypic a l impro ve me nts

– Side wa lks, c ro sswa lks, a nd sig na g e – Re c ta ng ula r ra pid fla shing b e a c o ns

(e nha nc e r)

– Co untdo wn pe de stria n sig na ls

  • Appro xima te c o st - $155,000*

*Cost estimate is being revised to incorporate additional improvements.

slide-26
SLIDE 26

1 2 1 2

slide-27
SLIDE 27

Gr ant Applic ations

  • De ve lo pe d pe r F

DOT ’ S SRT S g uide line s

  • Co o rdina te d with MDC PWD a nd Sc ho o l

Bo a rd to pre pa re a pplic a tio ns

  • T
  • ta l funding re q ue st fo r 10 sc ho o ls is

a ppro xima te ly $1.4 millio n

  • Se le c te d pro je c ts a re e xpe c te d to b e

funde d during F Y2017 sub je c t to a va ila b ility o f fe de ra l SRT S funds