South Fulton Parkway Transit Feasibility Study Study Purpose To - - PowerPoint PPT Presentation

south fulton parkway
SMART_READER_LITE
LIVE PREVIEW

South Fulton Parkway Transit Feasibility Study Study Purpose To - - PowerPoint PPT Presentation

South Fulton Parkway Transit Feasibility Study Study Purpose To conduct a high level assessment of potential transit improvements in the South Fulton Parkway Corridor through the evaluation of various transit service and land use scenarios


slide-1
SLIDE 1

South Fulton Parkway Transit Feasibility Study

slide-2
SLIDE 2

Study Purpose

To conduct a high level assessment of potential transit improvements in the South Fulton Parkway Corridor through the evaluation of various transit service and land use scenarios South Fulton Parkway Transit Feasibility Study

2

Study Approach

Assessment of Existing and Projected Conditions Development

  • f Land Use

Scenarios Projection of Transit Demand Identification of Needed Actions

slide-3
SLIDE 3

South Fulton Parkway Transit Feasibility Study

3

slide-4
SLIDE 4

South Fulton Parkway Transit Feasibility Study

4

Summary of Corridor Characteristics

  • Study area currently characterized by low

density development patterns and zoning

  • Local jurisdictions have expressed desire to

promote nodal development

  • 90 percent of commuter trips destined for

employment centers outside of the study area

  • South Fulton Parkway designed to be a limited

access facility

  • Travel demand modeling results confirmed:
  • Land use initiatives to promote smart growth needed within corridor to

support transit

  • Need for circulator routes to support premium services
  • Phased approach needed due to uncertainty of time needed for

development to occur

slide-5
SLIDE 5

Densities within the Corridor

South Fulton Parkway Transit Feasibility Study ITE Transit Supportive Densities

Service Type Residential (du/ acre) Employment (emp/ acre) Local/ Express Bus 4-15 50-200 BRT 9-12 80-500 Light Rail 15-50 500+ Heavy Rail 35-50 500+

South Fulton Municipalities 2005 2030

Trend Scenario

2005 2030

Trend Scenario

South Fulton Overall 1-3 0-5 1-5 1-27 Unincorporated S. Fulton 0-3 0-4 0-4 0-12 College Park 0-2 2-5 .4-6 1-15 Union City .1-2 .3-3 0-4 .1-27 Fairburn .03-1 .2-2 0-1 .1-2 Palmetto .1-1 .1-2 .01-.4 .2-2

  • Chatt. Hills

0-.1 .1-.3 0-.2 .2-.4

5

slide-6
SLIDE 6

South Fulton Parkway Transit Feasibility Study

6

Snapshot of Major Intersections – SR 92

slide-7
SLIDE 7

South Fulton Parkway Transit Feasibility Study

7

Snapshot of Major Intersections – Stonewall Tell

slide-8
SLIDE 8

South Fulton Parkway Transit Feasibility Study

8

Factors Influencing Recommendations The type of transit service along the South Fulton Parkway is contingent upon:

  • Type of development that local jurisdictions

along the corridor are willing to implement

  • Cooperation/coordination with GDOT to

accommodate the phased expansion of transit service

slide-9
SLIDE 9

South Fulton Parkway Transit Feasibility Study

Potential Transit for South Fulton

Potential Immediate Enhancements

Coordinate with GDOT & ARC for widening of Roosevelt Highway Upgrade local bus service along Old National Highway Enhance pedestrian access along Roosevelt Highway Identify locations for TOD Administer Preference survey

9

slide-10
SLIDE 10

South Fulton Parkway Transit Feasibility Study

10

Phase I - Schematic Station Concept for Commuter Bus

  • Commuter travel demand sufficient per

preference survey, Park-and-ride facilities built

  • Operational improvements to South Fulton

Parkway and connecting roadways to provide better access to park and ride facilities

  • TOD plans developed by local jurisdictions
  • Surrounding single-family development

increases

slide-11
SLIDE 11

South Fulton Parkway Transit Feasibility Study

11

Phase II - Schematic Station Concept for Enhanced Bus

  • TOD Implementation begins at station area
  • Parking facilities expanded
  • Commuter travel demand increases
  • Surrounding single-family development

increases

  • Beginning development of DRI’s
  • Old National LCI initiatives begin
slide-12
SLIDE 12

Phase III - Schematic Station Concept for Fixed Guideway Services

South Fulton Parkway Transit Feasibility Study

12

  • TOD Implementation maximized at station area
  • Park-and-ride structure expanded
  • Surrounding single-family development built-out
  • Proposed DRI’s on the ground
  • Exclusive transit access modified
  • Old National Highway redevelopment matures
slide-13
SLIDE 13

Action Plan

South Fulton Parkway Transit Feasibility Study

  • Local jurisdictions to create Task Force to:
  • Establish overall vision for corridor
  • Identify specific locations along South Fulton Parkway to focus

TOD activities

  • Address land use issues along corridor
  • Local jurisdictions to create transit supportive zoning districts
  • MARTA to conduct preference survey for initial commuter services
  • MARTA and local jurisdictions to participate in GDOT access

management study

  • MARTA to continue to monitor corridor and plan for phased service

improvements

13

slide-14
SLIDE 14

Examples for South Fulton

South Fulton Parkway Transit Feasibility Study

14

Carrollton, TX Hillsboro, OR York Region, CAN

Similar distance from CBD Mixture of suburban and rural development patterns Similar zoning and Master Plan needs Represents similar extension to existing rail system Development on greenfield site Station area development through private sector partnerships Phased implementation of transit service

slide-15
SLIDE 15

South Fulton Parkway Transit Feasibility Study

15

Carrollton, TX

  • Primary activities include:
  • Creation of Transit Center (TC) Zoning

District, including design standards

  • Establishing Tax Increment Financing

District

  • Land Acquisition
  • Developing Station Area Master Plan
  • Goals of the TC District:
  • To capitalize on regional transit, freeways

and arterial roadways by creating major urban and village centers

  • To provide development and land use

flexibility within framework of a form-based development code

  • To provide mix of residential, retail and
  • ffice uses in pedestrian-friendly district
slide-16
SLIDE 16

South Fulton Parkway Transit Feasibility Study

16

Orenco Station: Hillsboro, OR

  • Largest master-planned community on the

MAX system

  • Undertaken through partnership with private

sector – PacTrust

  • Developer worked with TriMet and City of

Hillsboro to develop Master Plan

  • Built on greenfield
  • Development close to station areas
slide-17
SLIDE 17

South Fulton Parkway Transit Feasibility Study

17

VIVA: York Region, Canada

  • Phased transit service
  • Distinct, branded fleet of low-

floor, wide-door vehicles

  • Queue-jumper lanes with first-

in-line signal priority

  • Created through a common vision

for transit line

  • Specific steps taken for TOD
slide-18
SLIDE 18

What We Hope to Avoid

South Fulton Parkway Transit Feasibility Study

18

GA 400 is a prime example of what results from unchecked sprawl along a new roadway in a suburban environment

South Fulton Parkway GA 400