SOI-ASIA University of Hasanuddin By: Muhammad Niswar Hasanuddin University Site SOI-Asia Project infrastructures have installed in Centre for Public Policy and Development Management Studies Building, Hasanuddin University as a


slide-1
SLIDE 1

SOI-ASIA University of Hasanuddin

By: Muhammad Niswar

Hasanuddin University

Site

  • SOI-Asia Project infrastructures have

installed in Centre for Public Policy and Development Management Studies Building, Hasanuddin University as a Counterpart.

slide-2
SLIDE 2

Environment

  • Semi-interactive site.
  • On campus LAN is partially connected .
  • The center has 15 PCs for self-education.
  • External connectivity is dial-up connection.
  • Classroom capacity is available up to 30

persons.

Environment

slide-3
SLIDE 3

Equipment Setup

Server 202.249.26.50 Modem Multiplexer Satellite dish Satellite Video Screen WMT 202.249.26.51 RPT 202.249.26.52 Staf Communication (ChatRoom) 202.249.26.53 UDL Router Defaullt GW : 202.249.26.49 Netmask : 255.255.255.248 DNS :202.249.26.50 Hub Satellite dish

6 M b p s 6 M b p s

Internet 64 Kbps (dial-up connection) Sony Box Receiver

PSKMP-PC Room

Default GW : 192.168.10.1 Netmask : 255.255.255.0 DNS : 192.168.10.2 Web Proxy : 192.168.10.2 Port : 3128 Screen

Last Condition of UNHAS site

Problem:

  • No connection is established between

Sony Box and UDL Receive Router, which is indicated by LED indicator of ‘LAN/act’

  • n Sony Box is turn off.
  • We can upload limited real time source:

Video and Audio because of insufficient BW

slide-4
SLIDE 4

Last Condition of UNHAS site

The problems occurred due to:

  • Lightening strikes harm the Sony Box,

Router and Modem.

  • External connectivity is dial-up connection

using modem that provide 56 Kbps. This is considered as insufficient.

Solution

  • Install the good grounding system (Done)
  • providing sufficient BW for the external

connectivity (in progress)