SEMAP Interstate Transport Project: Status, 2011 Results and Schedule
Talat Odman (GT) and Yongtao Hu (GT)
SEMAP Air Quality Modeling Workgroup Call March 16, 2016
SEMAP Interstate Transport Project: Status, 2011 Results and - - PowerPoint PPT Presentation
SEMAP Interstate Transport Project: Status, 2011 Results and Schedule Talat Odman (GT) and Yongtao Hu (GT) SEMAP Air Quality Modeling Workgroup Call March 16, 2016 Outline Status update Benchmarking 2011 Performance
Talat Odman (GT) and Yongtao Hu (GT)
SEMAP Air Quality Modeling Workgroup Call March 16, 2016
2
– CAMx & CMAQ – Both on US12 and LADCO12 domains
– Against EPA results for 2 periods – Step by step deviation from EPA config.
3
performance evaluations
– Tables of statistics – Bubble plots of MNB and MNE
EGU emissions
– AL, GA, KY, NC, SC, TN, WV
simulations on US12
– CAMx:
– CMAQ:
4
Repeat of March 22 - April 5, 2011 period with EPA configuration:
Difference from EPA for the March 22-31 period: Ozone:
EC:
Repeat of April 21-30, 2011 period with EPA configuration:
5
6
Model Performances Bubble plots of monthly average MNB and MNE in daily 8-hr max.
– MNB – MNE
– MNB – MNE
Tables of statistics
7
8
9
10
11
12
emissions from anthropogenics
– Tag point EGUs in each SEMAP state (10) – Tag all other anthropogenic in each state
– Elevated EGU NOx emissions in each state – All anthropogenic NOx in each state
13
14
Machine April May June Previous CAMx-APCA (2017 & sources 1-20) New 1 CMAQ (2017 & sensitivities 1-3) New 2 CMAQ (sensitivities 4-7) New 3 CMAQ (sensitivities 8-11) New 4 CMAQ (sensitivities 12-15)