School District Resources Birch Grove ES Built 1999 / 2003 Renovation 72,949 sf; Grades PK-2; 580 Students +/- Open Plan; Integrated Day Program Tolland Intermediate Built 1971 / 1974 Renovation 109,126 sf; 8 Portable CRs Grades 3-5;


slide-1
SLIDE 1
slide-2
SLIDE 2

Tolland Middle School

Built 1966 / 1983 Renovation 136,531 sf;; 2 Portable CRs Grades 6-8; 690 Students +/-

School District Resources

Birch Grove ES

Built 1999 / 2003 Renovation 72,949 sf; Grades PK-2; 580 Students +/- Open Plan; Integrated Day Program

Tolland High School

Built 2006 230,000 sf; Grades 9 – 12; 900 Students +/-

Tolland Intermediate

Built 1971 / 1974 Renovation 109,126 sf; 8 Portable CRs Grades 3-5; 670 Students +/- Open Plan; Integrated Day Program

slide-3
SLIDE 3

Strategic

Planning Document

Concept

design documents

Strategic

Planning Document

Document Collecting

existing conditions

Listening

collecting information

Listening

collecting information

GO!

Visioning

  • ptions and alternatives

Visioning

  • ptions and alternatives

utilization study

Strategic

Planning Document

Concept

design documents

Strategic

Planning Document

Document

utilization study

… to study completion

DEC JAN SEP OCT NOV

STEP 1 STEP 2 STEP 3 /4 STEP 5 /6 / 7

slide-4
SLIDE 4

BY SCHOOL

slide-5
SLIDE 5
slide-6
SLIDE 6

BY SCHOOL

slide-7
SLIDE 7
  • Access Improvements

accessibility, ADA / MAAB compliance…

  • Building Improvements

foundation, structure, roof construction…

  • Building MEP

plumbing fixtures, life safety, electrical…

  • Interior Spaces

interior finishes, space utilization, fixtures…

KEY COMPONENT of ASSESSMENT

Facilities Assessment

facility utilization study

slide-8
SLIDE 8
  • Classroom size

target: 20 students per CR

  • Classroom count

building capacity, flexibility

  • Educational program

shared spaces, Special Ed areas, etc.

  • Potential changes

grade reconfiguration, modular CR’s, full-day K

Space Needs Assessment

facility utilization study

slide-9
SLIDE 9
slide-10
SLIDE 10

Current School Year

slide-11
SLIDE 11

Option A

Do Nothing Option

slide-12
SLIDE 12

Option A

Do Nothing Option

Looking ahead: 2023-24

slide-13
SLIDE 13

Option B

Planned Maintenance & Full-Day Kindergarten

Option C

Renovated Proactively & Full-Day Kindergarten

slide-14
SLIDE 14

Option D1

Two K-5 Elementary Schools

slide-15
SLIDE 15

Option D2

Two K-5 Elementary Schools; Flip Middle School with High School

slide-16
SLIDE 16

Option E1

Close TIS; Add at High School

slide-17
SLIDE 17

Option E2

Close TMS; Add at High School

slide-18
SLIDE 18

Option E3

Close TMS; Add at Birch Grove and High School

slide-19
SLIDE 19

Option F

New K-8 Elementary Schools

slide-20
SLIDE 20
slide-21
SLIDE 21
slide-22
SLIDE 22
slide-23
SLIDE 23