School District Resources Birch Grove ES Built 1999 / 2003 Renovation 72,949 sf; Grades PK-2; 580 Students +/- Open Plan; Integrated Day Program Tolland Intermediate Built 1971 / 1974 Renovation 109,126 sf; 8 Portable CRs Grades 3-5;


  1. School District Resources Birch Grove ES Built 1999 / 2003 Renovation 72,949 sf; Grades PK-2; 580 Students +/- Open Plan; Integrated Day Program Tolland Intermediate Built 1971 / 1974 Renovation 109,126 sf; 8 Portable CRs Grades 3-5; 670 Students +/- Open Plan; Integrated Day Program Tolland Middle School Built 1966 / 1983 Renovation 136,531 sf;; 2 Portable CRs Grades 6-8; 690 Students +/- Tolland High School Built 2006 230,000 sf; Grades 9 – 12; 900 Students +/-

  2. SEP OCT NOV DEC JAN Concept Concept Document Document Strategic Strategic Strategic Strategic Planning Document utilization study design documents design documents Planning Document Planning Document Planning Document utilization study … to study completion STEP 5 /6 / 7 Visioning Visioning options and alternatives options and alternatives GO! STEP 3 /4 Listening Listening collecting information collecting information STEP 2 Collecting existing conditions STEP 1

  3. BY SCHOOL

  4. BY SCHOOL

  5. Facilities Assessment facility utilization study KEY COMPONENT of ASSESSMENT  Access Improvements accessibility, ADA / MAAB compliance…  Building Improvements foundation, structure, roof construction…  Building MEP plumbing fixtures, life safety, electrical…  Interior Spaces interior finishes, space utilization, fixtures…

  6. Space Needs Assessment facility utilization study  Educational program  Classroom size shared spaces, Special Ed areas, etc. target: 20 students per CR  Classroom count  Potential changes building capacity, flexibility grade reconfiguration, modular CR’s, full-day K

  7. Current School Year

  8. Option A Do Nothing Option

  9. Looking ahead: 2023-24 Option A Do Nothing Option

  10. Option B Option C Planned Maintenance & Full-Day Kindergarten Renovated Proactively & Full-Day Kindergarten

  11. Option D1 Two K-5 Elementary Schools

  12. Option D2 Two K-5 Elementary Schools; Flip Middle School with High School

  13. Option E1 Close TIS; Add at High School

  14. Option E2 Close TMS; Add at High School

  15. Option E3 Close TMS; Add at Birch Grove and High School

  16. Option F New K-8 Elementary Schools

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.