Lockwood Folly Community Center South Elevation (View from Water) What a New Community Center Means to the LFCC Membership May 2009 Purpose of Presentation Present the Facts About a New Community Center Have an Open Forum for
SLIDE 2
SLIDE 3
Purpose of Presentation
- Present the Facts About a New Community
Center
- Have an Open Forum for Questions
- Provide Membership with Information to
Make an Informed Decision
SLIDE 4
Presentation Overview
- Current LFCC Facilities
- New Community Center
- Land Exchange Required
- Questions and Answers
- Closing Comments
SLIDE 5
Current LFCC Facilities
SLIDE 6
Pro Shop/Café
- Built in 1987- 4100 total square feet
- Outside Inspection Done October, 2006
- Structure: Deteriorating with rot/water damage
in Windows, Doors, and Some Walls
- HVAC: System not correctly sized for building
including cold air returns
SLIDE 7
Pro Shop/Café
- Café Eating Space:
- 34 Seats Inside and 12 Seats Outside
- Limited Appeal to Non-Golfing Diners
- Recent Renovations: Last 4-5 years
- Kitchen Upgrades to meet County Health Code
- New Windows and Door to Pro Shop
- New Counter and Shelving in Pro Shop
- New Toilet in Ladies Restroom
SLIDE 8
Cart Barn
- Built in 1987/1988- 4900 square feet
- Outside Inspection Done October, 2006
- Overall in Good Condition
- Water Damage on louvered walls on front and rear
- Recent Renovations:
- Replaced rear doors and repaired other damaged
areas
- Will need electrical upgrade for carts in future
SLIDE 9
Maintenance Building
- Built in 1987/1988- 7600 square feet
- Overall structure is adequate for our needs
- Don’t anticipate any major repair needs.
SLIDE 10
Half-Way House/Restrooms
- Built 1987/1988
- Half-Way House: 350 square feet
- Used for restroom facilities only
- No food service due to upgrade cost to meet
County Health Codes
- Restrooms 13th Green/14th tee:
- Good condition, painted in 2008
SLIDE 11
Septic System
- Completed in 1987/1988
- Owned by LFCC and used to support Pro
Shop/Cafe, Cart Barn and POA Clubhouse
- Tank Pumping and maintenance expense shared
with POA
- Normal Life Expectancy: About 25 years
- If failure occurs, must be brought to current
codes including repair field
SLIDE 12
Parking Lot
- Completed in 1987/1988
- Owned by LFCC and supports both LFCC
and POA activities
- Current drainage issues, deteriorating
pavement and sink holes will have to be addressed in near future
SLIDE 13
Parking Lot
- Parking Lot is Grand-Fathered in current
condition, but does not meet current water drainage code (drop inlets)
- Storm Water Management project over the
next few years will require excavation in parking lot
- Any major work in the parking lot, including
renovation or storm water drainage would force us to comply with new codes
SLIDE 14
Estimated Costs: 2009 Dollars
Pro Shop & Cafe Septic System Parking Lot
- Est. Costs
$900, 000 $100, 000 $100,000 Finance Option 15 years @ 6% 15 years @ 6% 15 years @ 6%
- Est. Annual
Cost per Membership $437 $48 $48
SLIDE 15
New Community Center
SLIDE 16
Lockwood Folly Community Center
South Elevation (View from Water)
SLIDE 17
Elevation Views and Floor Plan of New Community Center
SLIDE 18
Parking Lot Entry View
SLIDE 19
Pool Side View
SLIDE 20
Waterfront View
SLIDE 21
Putting Green View
SLIDE 22
New Community Center-1st Floor
- Designed for the Lockwood community
- verlooking Inter-coastal waterway
- 16,100 total square feet (11,800 1st Floor)
- 2 Kitchens: Commercial and Catering
- Elevator to 2nd Floor
SLIDE 23
New Community Center-1st Floor
- Large Meeting Room:
- Dinner Seating for 225 people
- Theatre Seating for 485 people
- Can be subdivided for smaller functions
- Meets Fire Marshall capacity code
- Pro Shop and Café next to putting green
- Approximately 4000 square feet
- Inside seating for 68
- Outside Seating for 24
SLIDE 24
SLIDE 25
New Community Center-2nd Floor
- 4300 square feet
- Office Space
- Library/Card Room and separate meeting
rooms
- Conference Room
SLIDE 26
SLIDE 27
Cost of New Community Center
- Building cost
- Locking in pricing today provides a reasonable
per square foot cost
- Costs include furniture, appliances, etc
- POA dues impact:
- $2.8M project cost
- 15 year loan @ 6%
- $440 Year per POA member
- No Upfront Assessment
SLIDE 28
Project Overview
- POA finances New Community Center project
- Building Site is on the property between the
existing clubhouse and putting green
- Pro Shop & Café would be torn down and
relocated in the New Community Center
- Replacement facilities will be on-site for Pro
Shop and Café to continue operations during construction.
SLIDE 29
Project Overview
- Updated and expanded parking lot to support larger
facility
- Remove septic tanks now located on the building site
and install new tanks in front of current Clubhouse
- New septic field under driving range will be brought
up to code and updated to accommodate increased volume
- Cart Path that runs behind swimming pool would be
relocated to East Side of current Clubhouse with the exit into parking lot
SLIDE 30
SLIDE 31
Construction Timetable
- Septic Permit takes 12-15 months for approval
process
- Other Permits will take 2-3 months after septic
approval
- Actual demolition and construction would not
start until late 2010 or early 2011
- Project would take 12-15 months to complete
SLIDE 32
Location of New Community Center
- Community Center Committee Options:
- Expand and Renovate Current Clubhouse
- Build the New Community Center towards
Townhouses
- Purchase the real estate office at the entrance and
renovate to fit Community needs
- Build New Community Center on property between
existing Clubhouse and putting green
SLIDE 33
Committee’s Recommendation
- Build New Community Center on the
property between existing Clubhouse and Putting Green
- Other options were deemed to have too
many shortcomings
- This option will require POA to own the
land for the New Community Center
SLIDE 34
Land Transfer Options
- Sell land needed for New Community
Center to POA:
- LFCC would lease and pay rent for Pro Shop/Café
and Kitchen Space
- LFCC would have to furnish Café and build out the
Commercial Kitchen
- Total rental, furnishing and build out costs could
exceed value of land transferred in about 7-8 years
SLIDE 35
Land Transfer Options
- Exchange Land for rent free use of space
for Pro Shop/Café and Kitchen
- LFCC will provide furnishings for Pro Shop
(existing counter, shelves, and racks)
- POA will provide all furnishings for Café
- POA will build out and equip the Commercial
Kitchen
SLIDE 36
Board of Directors Recommendation
- LFCC exchanges land currently used as Pro Shop/Cafe,
Septic, and Parking Lot for rent free use of New Community Center facilities. This rent free use would continue as long as LFCC is a Member-Owned Equity Course
- LFCC would continue access and use of remainder of
New Community Center like every other POA member
SLIDE 37
Why Your Board of Directors Supports the Land Transfer
- New and Larger Facilities
- Pro Shop/Café and Kitchen
- Office and Meeting Space
- Attractive to potential new members
- Facilities could accommodate larger groups and
simultaneous events
- STOP dumping money into a deteriorating
structure and infrastructure that will need costly replacement shortly
SLIDE 38
Why Your Board of Directors Supports the Land Transfer
- Invest our dollars in the golf course to
maintain its quality plus we will have access to first class facilities for members and guests
- Continue to Provide LFCC Membership
with the Best Value for their Investment in the Club
SLIDE 39
Value of the land: Appraisal 5/2009
- Appraised Value of 1.2 acres required for new
community Center is $570,000.
- Assumes land could be sold for building lots
- Septic tanks removed and Pro Shop/Café razed
- Appraised Value of 1.2+ acre parking lot is
$140,000 and takes into account current condition
SLIDE 40
Bottom Line Conclusion
- If the Community Center is not built and
LFCC members have to fund Future Replacement Costs for pro shop/café, parking, and septic, the cost is $533 per year for 15 years.
- $533 per LFCCI membership per year
compared to $440 per year as a POA member for 15 years for a new Community Center
SLIDE 41
LFCC and POA Agreement: Land Transfer
SLIDE 42
LFCC/POA Agreement: Land Transfer
- Transfer of property does not require
prepayment of current loan or any portion by BB&T
- LFCCI equity membership approves transfer
- f land for new Community Center
- Design, function, cost and funding methods
approved by both boards and POA community
SLIDE 43
LFCC/POA Agreement: Land Transfer
- LFCCI has same access and privileges in new
Community Center as today and as stated in current POA policies
- If after approval by POA community,
construction fails to materialize in a reasonable time, property will revert back to ownership of LFCCI
SLIDE 44
LFCC/POA Agreement: Land Transfer
- As part of construction, current pro shop
and café will have to be razed
- Prior to razing, a suitable substitute would
be in place for pro shop desk and food service that meet local and state health codes and board approval
SLIDE 45
LFCC/POA Agreement: Land Transfer
- After approval by LFCCI and POA
communities, best option for consideration is transfer of the designated land from the LFCCI to the POA for which the LFCCI will receive rent free use of facilities as long as LFCC is a member owned course
SLIDE 46
What is the value of LFCCI?
- An Appraisal in April, 2008 placed the value at
$3.6 Million. This appraisal was required by BB&T when we obtained the $500,000 Line of Credit and was based on our 3 year financial records for 2005- 2007
- Appraiser Comments:
- “The golf course business is a highly competitive cash
business”
- “The value estimate by the Income Approach is
considered a reliable indication of value”
SLIDE 47
Will the land transfer reduce the value of LFCCI?
- The value of the golf course is based on income with
buildings, etc to support this income
- The land transfer appraisal is based on the highest and
best use for the land without buildings or septic system
- If income increases due to new facilities, the value of
LFCCI could increase
- Likewise, an aging infrastructure and outdated
deteriorating buildings could reduce our income
SLIDE 48
If land transfer is approved what are the next steps?
- POA members have to vote on building and
financing a new Community Center
- If approved by POA members, a land transfer
document will be completed
- Transfer document filed with Brunswick County
- POA will move forward with permitting and
financing
SLIDE 49
Will having temporary facilities impact golf course revenue?
- Any major construction activity causes some
disruption to everyone. However, this construction should not impact course play that would impact
- utside play revenue.
- We could see some downturn in merchandise sales
and F&B sales due to smaller temporary facilities
- On the flip side, going to a new larger facility
could off-set any short term losses
SLIDE 50
How will expenses for the New Community Center be allocated?
- LFCCI will continue to pay utility costs for our portion of
the building. This will require separate metering.
- Other costs and services including security, cleaning, etc.
will be worked out by a committee of both Boards. We can not explicitly detail all of these services at this point.
- Since the building would be owned by the POA, they will
be responsible for insurance and taxes
SLIDE 51
Does LFCCI pay POA dues?
- Master Declaration of Covenants, Conditions and
Restrictions for Lockwood govern our POA dues
- Our dues are based on the individual residence owner
rate times 50 (the number of Class B votes)
- In 2004 the POA members approved reducing our
Class B votes from 100 to 50. This lowered our POA dues from $60,000 to $30,000 beginning July1, 2004
- Our POA dues for the POA calendar year 2008-2009
are $39,750 or ($795 x 50). We budget this in our expenses each year.
SLIDE 52
Would LFCCI be assessed for a New Community Center?
- Like every other POA member, we would be
assessed
- Our assessment formula is:
- Assessment amount x 50, then 50% of that amount
- If the annual assessment is $440 per POA member, we
would pay $11,000 annually
- Reducing our Pro Shop/Café, Septic, and Parking
Lot maintenance costs should off-set this assessment
SLIDE 53
Annual Cost Comparison Per Membership: 15yrs @ 6%
- Build Pro Shop/Café: $437
- Replace Septic System: $48
- Repair Parking Lot: $48
- Total: $533 per year
- Community Center: $440
- Total: $440 per year
SLIDE 54
Questions & Answers
- Questions and Answers from the 4 meetings
will be in the packet sent to all the members for their vote on the land transfer
SLIDE 55
Membership Q&A
SLIDE 56
What Members Can Expect After the Meetings?
- Mailing to all members on 5-30 to include:
- Cover letter from the Board of Directors
- Copy of meeting presentation slides
- Copy of artist rendering of Community Center
- Copy of floor plan of the Community Center
- Q&A from all meetings
- Ballot to cast your vote- Return no later July 1
- Presentation slides and drawings will be on LFCC
website on 5-22
SLIDE 57
Thank You!! Thank You!!
- Thanks to our friends and neighbors who spent
countless hours on the New Community Center Committee: Arlene Evans, LeRoy Knopfle, Delores Malory, Russ Mavis, and Jack McGinnis.
- A special thanks to Tom Hoffman and Joe
Parnell who have co-chaired the Community Center Committee all this time.
SLIDE 58
Closing Comments
- The National Board of Realtors:
- Above average amenities in communities
can increase property values by 3% to 9%
- Substandard amenities can reduce
property values by up to 20%
SLIDE 59
Annual Cost Comparison Per Membership: 15yrs @ 6%
- Build Pro Shop/Café: $437
- Replace Septic System: $48
- Repair Parking Lot: $48
- Total: $533 per year
- Community Center: $440
- Total: $440 per year
SLIDE 60
Closing Comments
- We are at a major junction as a
community and a country club. Our buildings and infrastructure are 20+ years old, not regarded as the best construction, and require action now and not later. We all have invested in the Lockwood community and its beauty and we should want this dream to continue.