next steps CONTENTS Rethink Folly Review 1 Review of Funding 2 - PowerPoint PPT Presentation

RETHINK FOLLY next steps CONTENTS Rethink Folly Review 1 Review of Funding 2 Folly Road Segment Review 3 Cost Estimates Inclusions & Exclusions 4 Rethink Folly Guidepost 1 5 Population, Density, & Businesses 6 Rethink Folly


  1. RETHINK FOLLY next steps

  2. CONTENTS Rethink Folly Review 1 Review of Funding 2 Folly Road Segment Review 3 Cost Estimates Inclusions & Exclusions 4 Rethink Folly Guidepost 1 5 Population, Density, & Businesses 6 Rethink Folly Next Steps 7

  3. 1 RETHINK FOLLY; SEGMENT 1 AASHTO Definitions Segment 1 Shared-use Path - 12’ preferred width Existing - 10’ minimum width Street - 5’ travel lane separation Section From Ellis Sidewalk Creek to - 5’ preferred width Prescott St. - ADA-compliant Segment 1 Best Street Section from Segment 1 Ellis Creek to Prescott St. Better Street Section From Ellis Creek to Prescott St.

  4. 2 FUNDING TOTAL AVAILABLE FUNDS $ 400,000 $ 2.675M provided by the City of Charleston; available in 2019 $ 400,000 TARGETED POTENTIAL FUNDING provided by the Town of James Island; available now ($ 5.4M) CHATS Complete Streets ($ 1.375M) Charleston County $ 1,500,000 (TBD) Additional Municipal Contributions provided by CHATS (BCDCOG) (TBD) SCDOT $ 375,000 TOTAL AVAILABLE + TARGETED FUNDS provided by Charleston County; Council-approved 20% match of $ 9.450M federal funds

  5. Cost of Cost of 3 SEGMENT REVIEW Section Roads Length Sidewalk Shared-Use Completion Path 1 Ellis Creek to Prescott Street 6,800’ $ 2.3M $ 5.3M TOTAL AVAILABLE FUNDS Prescott Street to George L. $ 2.675M 2 1,800’ $ 1.0M $ 2.2M Griffith Boulevard George L. Griffith Blvd to 3 2,050’ ---- $ 1.6M Grimball/Fort Johnson Road Grimball/Fort Johnson Road to TOTAL AVAILABLE + TARGETED FUNDS 4 3,600’ ---- $ 2.5M Rafeal Lane $ 9.450M 5 Rafeal Lane to Sol Legare Road 8,800’ $ 2.3M $ 4.3M Total 23,050’ $ 9.7M $ 15.9M James I s Isla sland Ch Char arleston on Cou County Cit ity o of C Charle rlest ston Folly lly B Beach 5 4 3 2 1

  6. 4 INCLUSIONS EXCLUSIONS Facilities on West side of Folly Road Below-ground utility relocations • • (ex: water, sewer, or gas) Estimates based on aerial photos and limited site visits • Major transmission line relocations • Concrete Sidewalks • Landscaping • For shared-use path alternative, bike lane was removed and • curb line was moved toward travel lane Major offsite or drainage improvements • Asphalt shared-use path Pervious surfaces • • Additional right of way included ($40/sf) Stormwater treatment • • Design and permitting fees • Construction engineering and inspection • Bus shelters along segments 3, 4, and 5 • Small distribution power line relocation •

  7. R ETH I N K F OL L Y 5 GUIDEPOST 1 Improvements that make all of Folly Road a safe, appealing, and desirable place to walk, ride bicycles, use transit, and drive. 25 20 TOTAL 15 ACCIDENTS 10 2014, 2015, 2016 5 0 1 2 3 4 5 Segment Bike/Ped Vehicle Bike/Ped Vehicle Vehicle Life Total Segment Roads Serious Serious Fatality Fatality Threatening Accidents Injury Injury 1 Ellis Creek to Prescott Street 0 3 0 4 15 22 Prescott Street to George L. 2 0 0 0 0 0 0 Griffith Boulevard George L. Griffith Blvd to 3 0 0 0 0 2 2 Grimball/Fort Johnson Road Grimball/Fort Johnson Road to 4 0 0 0 0 1 1 Rafeal Lane 5 Rafeal Lane to Sol Legare Road 1 0 1 0 7 9

  8. POPULATION, 6 DENSITY, & BUSINESSES Data represents a half-mile 1 2 section on either side of 3 Folly Road 4 5 prepared by BCDCOG according to ESRI forecast for 2017 from 2010 census data POPULATION DENSITY HOUSEHOLD DENSITY BUSINESS DENSITY (population/square mile) (households/square mile) (businesses/square mile) 60.0 6,000 3,000 50.0 5,000 2,500 40.0 4,000 2,000 30.0 3,000 1,500 20.0 2,000 1,000 10.0 1,000 500 0.0 0 0 5 4 3 2 1 5 4 3 2 1 5 4 3 2 1 Segment Segment Segment

  9. 7 DEFINE DEFINE PHASE I THE NEXT SCOPE STEPS PERFORM STORMWATER ANALYSIS DEFINE ALTERNATIVES TO INVESTIGATE Infill sidewalk Move curb and replace with 12’ shared-use path Leave bike path and build a wide sidewalk Others

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.