FOLLY ROAD MULTI-USE PATH Ellis Creek to Prescott Street October - - PowerPoint PPT Presentation

FOLLY ROAD MULTI-USE PATH Ellis Creek to Prescott Street October 2018 CONTENTS Review Alternatives Challenges Areas of Interest Decision Matrix Recommendation REVIEW FUNDING SEGMENT OPTIONS $ 9.450M $2.675M Cost of Sidewalk Cost of


slide-1
SLIDE 1

FOLLY ROAD MULTI-USE PATH

Ellis Creek to Prescott Street October 2018

slide-2
SLIDE 2

CONTENTS

Review Alternatives Challenges Areas of Interest Decision Matrix Recommendation

slide-3
SLIDE 3

Section Roads Length Cost of Sidewalk Completion Cost of Shared-Use Path 1 Ellis Creek to Prescott Street 6,800’ $ 2.3M $ 5.3M 2 Prescott Street to George L. Griffith Boulevard 1,800’ $ 1.0M $ 2.2M 3 George L. Griffith Blvd to Grimball/Fort Johnson Road 2,050’

  • $ 1.6M

4 Grimball/Fort Johnson Road to Rafeal Lane 3,600’

  • $ 2.5M

5 Rafeal Lane to Sol Legare Road 8,800’ $ 2.3M $ 4.3M Total 23,050’ $ 9.7M $ 15.9M

REVIEW

SEGMENT OPTIONS

TOTAL AVAILABLE FUNDS

$2.675M

TOTAL TARGETED + AVAILABLE FUNDS

$ 9.450M MOST

traffic accidents (2015-2017)

MOST

business density

2nd

household density

2nd

population density WHAT WE’VE DONE

  • Grant application for funding
  • Defined first priority
  • Completed existing condition survey
  • Developed alternatives

SEGMENT 1 FUNDING

slide-4
SLIDE 4

ALTERNATIVES

1

A L T

5’ ~2’

curb & gutter planting

12’

multi-use path

12’

travel lane

~3.5’

bike lane

5’ ~2

curb & gutter planting

12’

multi-use path

12’

travel lane

~3.5’

bike lane

~2’

curb & gutter

8’

sidewalk

12’

travel lane

~3.5’

bike lane

5’ ~2’

curb & gutter sidewalk

12’

travel lane

2

A L T

3

A L T

4

A L T

ROW Line

5’ Sidewalk 8’ Sidewalk Multi-Use Path + Bike Lane Multi-Use Path, No Bike Lane

slide-5
SLIDE 5

CHALLENGES

slide-6
SLIDE 6

RIGHT-OF-WAY

  • Before 1962 Folly Road was two

lanes with a 50’ ROW, then SCDOT expanded to a ~70’ ROW

  • Generally 35’ feet along the west

side of Folly Road

  • 32.5’ pavement
  • 1.5’ curb & gutter
  • Approximate cost of ROW purchase

= $40/sq ft

slide-7
SLIDE 7

UTILITIES/STORMWATER

  • Utility poles are a major challenge

along the corridor for each alternative

  • There will not be a significant impact
  • n below ground utilities
  • Telephone pedestals, gas

monuments, backflow preventers would need to be relocated

  • Existing site drainage would be

impacted for 3 businesses

  • Eliminating existing bike lane

requires upgrades to Folly Road drainage system

slide-8
SLIDE 8

MONUMENTS/SIGNAGE

  • Most businesses along Folly Road

have signs that are typically at ROW edge

  • Signs are expensive and difficult

to relocate

  • Relocation Costs:
  • Monuments signs: $10,000
  • Post signs: $5,900
  • Traffic signs: $500
slide-9
SLIDE 9

Ellis Creek to Prescott Street

SEGMENT 1

Areas of Interest

Sumter’s Landing Roadside Seafood Live Oak Doctor’s Care

1 2 3 4

slide-10
SLIDE 10

Ellis Creek to Prescott Street

SEGMENT 1

Doctor’s Care

Doctor’s Care

1

slide-11
SLIDE 11

1

A L T

Doctor’s Care 5’ Sidewalk

Existing Conditions 5’ Sidewalk

slide-12
SLIDE 12

2

A L T

Doctor’s Care 8’ Sidewalk

Existing Conditions 8’ Sidewalk

slide-13
SLIDE 13

3

A L T

Doctor’s Care Multi-Use Path + Bike Lane

Existing Conditions Multi-Use Path + Bike Lane

slide-14
SLIDE 14

4

A L T

Doctor’s Care Multi-Use Path, No Bike Lane

Existing Conditions Multi-Use Path, No Bike Lane

slide-15
SLIDE 15

Ellis Creek to Prescott Street

SEGMENT 1

Live Oak Tree

Live Oak

2

slide-16
SLIDE 16

1

A L T

Live Oak Tree 5’ Sidewalk

Existing Conditions 5’ Sidewalk

slide-17
SLIDE 17

2

A L T

Live Oak Tree 8’ Sidewalk

Existing Conditions 8’ Sidewalk

slide-18
SLIDE 18

3

A L T

Live Oak Tree Multi-Use Path + Bike Lane

Existing Conditions Multi-Use Path + Bike Lane

slide-19
SLIDE 19

4

A L T

Live Oak Tree Multi-Use Path, No Bike Lane

Existing Conditions Multi-Use Path, No Bike Lane

slide-20
SLIDE 20

Ellis Creek to Prescott Street

SEGMENT 1

Roadside Seafood

Roadside Seafood

3

slide-21
SLIDE 21

1

A L T

Roadside Seafood 5’ Sidewalk

Existing Conditions 5’ Sidewalk

slide-22
SLIDE 22

2

A L T

Roadside Seafood 8’ Sidewalk

Existing Conditions 8’ Sidewalk

slide-23
SLIDE 23

3

A L T

Roadside Seafood Multi-Use Path + Bike Lane

Existing Conditions Multi-Use Path + Bike Lane

slide-24
SLIDE 24

4

A L T

Roadside Seafood Multi-Use Path, No Bike Lane

Existing Conditions Multi-Use Path, No Bike Lane

slide-25
SLIDE 25

Ellis Creek to Prescott Street

SEGMENT 1

Sumter’s Landing

Sumter’s Landing

4

slide-26
SLIDE 26

1

A L T

Sumter’s Landing 5’ Sidewalk

Existing Conditions 5’ Sidewalk

slide-27
SLIDE 27

2

A L T

Sumter’s Landing 8’ Sidewalk

Existing Conditions 8’ Sidewalk

slide-28
SLIDE 28

3

A L T

Sumter’s Landing Multi-Use Path + Bike Lane

Existing Conditions Multi-Use Path + Bike Lane

slide-29
SLIDE 29

4

A L T

Sumter’s Landing Multi-Use Path, No Bike Lane

Existing Conditions Multi-Use Path, No Bike Lane

slide-30
SLIDE 30

Ellis Creek to Prescott Street

RISK PROFILE

LIKELIHOOD IMPACT TO COSTS

LOW LOW MEDIUM MEDIUM HIGH HIGH

1

A L T

3

A L T

4

A L T

CHALLENGE

ROW UTILITIES/ STORMWATER MONUMENTS/ SIGNAGE

SEGMENT 1

2

A L T

5’ Sidewalk 8’ Sidewalk Multi-Use Path + Bike Lane Multi-Use Path No Bike Lane

DECISION MATRIX

COST ESTIMATE

slide-31
SLIDE 31

Ellis Creek to Prescott Street

RISK PROFILE

LIKELIHOOD IMPACT TO COSTS

LOW LOW MEDIUM MEDIUM HIGH HIGH

1

A L T

3

A L T

4

A L T

CHALLENGE

ROW UTILITIES/ STORMWATER MONUMENTS/ SIGNAGE

SEGMENT 1

2

A L T

5’ Sidewalk 8’ Sidewalk Multi-Use Path + Bike Lane Multi-Use Path No Bike Lane $ 978,162 $ 1,425,196 $ 3,294,520 $ 4,006,201

DECISION MATRIX

COST ESTIMATE

slide-32
SLIDE 32

RECOMMENDATION

2

A L T

8’ Sidewalk

~3.5’

bike lane

~2’

curb & gutter

8’

sidewalk

12’

travel lane
slide-33
SLIDE 33