S155 Churchill Gardens Phase 5 Scheme Presentation 27 th July 2016 - - PowerPoint PPT Presentation
S155 Churchill Gardens Phase 5 Scheme Presentation 27 th July 2016 - - PowerPoint PPT Presentation
S155 Churchill Gardens Phase 5 Scheme Presentation 27 th July 2016 Introduction Capital Programme Team Rita Bailey, Project Manager (Technical Services Department) Keith Rouse, Project Surveyor (Delivery Team) Resident Relations
Introduction Capital Programme Team
- Rita Bailey, Project Manager (Technical Services Department)
- Keith Rouse, Project Surveyor (Delivery Team)
Resident Relations Team
- Debbie Clancey, Engagement and Consultation Co-ordinator
Churchill Gardens - Background Information
- Churchill Gardens is a large housing estate in the Pimlico area of Westminster,
London, comprising 1,661 homes in 36 blocks . The estate was developed between 1946 and 1962 by two young architects Powell and Moya for a competition held by Westminster Council in 1946, replacing Victorian terraced houses extensively damaged during the Blitz.
- The first four blocks completed around 1950, received the Festival of Britain
merit award
- Churchill Gardens was designated a conservation area in 1990, and in 1998
six blocks (Chaucer, Coleridge, Shelley, Keats, Gilbert and Sullivan) Houses and the accumulator tower were Grade II listed.
- In total there are 62 properties in Phase 5, comprising 37 leaseholders and 25
tenants
Churc urchil hill l Gardens ens - Block cks s in Phas ase e 5
Jane Austen House (8 units) Martineau House (18 Units) Campbell House (24 Units) Marryat House (12 units)
Scope of Works
- Scaffolding
- Roof replacement works including associated works
- Window and balcony door repairs
- Renewal of timber windows (front elevation) kitchen, bathroom and
hallway
- Repair or replace defective glazing to communal areas
- Re-asphalting communal balcony walkways and private balconies
(tenanted properties only)
- Concrete/ render repairs
- Internal and external decorations to all previously decorated
surfaces
- Jetting of rainwater goods i.e. guttering and downpipes
- Fire Risk Assessment Works (FRA)
- Removal of redundant TV cabling
- Block signage/numbering
- Pigeon netting (where applicable)
- Asbestos removal (where applicable)
- M&E works, upgrade of communal lighting and landlord supply