S155 Churchill Gardens Phase 5 Scheme Presentation 27 th July 2016 Introduction Capital Programme Team Rita Bailey, Project Manager (Technical Services Department) Keith Rouse, Project Surveyor (Delivery Team) Resident Relations


slide-1
SLIDE 1

S155 Churchill Gardens Phase 5 Scheme Presentation 27th July 2016

slide-2
SLIDE 2

Introduction Capital Programme Team

  • Rita Bailey, Project Manager (Technical Services Department)
  • Keith Rouse, Project Surveyor (Delivery Team)

Resident Relations Team

  • Debbie Clancey, Engagement and Consultation Co-ordinator
slide-3
SLIDE 3

Churchill Gardens - Background Information

  • Churchill Gardens is a large housing estate in the Pimlico area of Westminster,

London, comprising 1,661 homes in 36 blocks . The estate was developed between 1946 and 1962 by two young architects Powell and Moya for a competition held by Westminster Council in 1946, replacing Victorian terraced houses extensively damaged during the Blitz.

  • The first four blocks completed around 1950, received the Festival of Britain

merit award

  • Churchill Gardens was designated a conservation area in 1990, and in 1998

six blocks (Chaucer, Coleridge, Shelley, Keats, Gilbert and Sullivan) Houses and the accumulator tower were Grade II listed.

  • In total there are 62 properties in Phase 5, comprising 37 leaseholders and 25

tenants

slide-4
SLIDE 4

Churc urchil hill l Gardens ens - Block cks s in Phas ase e 5

Jane Austen House (8 units) Martineau House (18 Units) Campbell House (24 Units) Marryat House (12 units)

slide-5
SLIDE 5

Scope of Works

  • Scaffolding
  • Roof replacement works including associated works
  • Window and balcony door repairs
  • Renewal of timber windows (front elevation) kitchen, bathroom and

hallway

  • Repair or replace defective glazing to communal areas
  • Re-asphalting communal balcony walkways and private balconies

(tenanted properties only)

  • Concrete/ render repairs
  • Internal and external decorations to all previously decorated

surfaces

  • Jetting of rainwater goods i.e. guttering and downpipes
  • Fire Risk Assessment Works (FRA)
  • Removal of redundant TV cabling
  • Block signage/numbering
  • Pigeon netting (where applicable)
  • Asbestos removal (where applicable)
  • M&E works, upgrade of communal lighting and landlord supply

(Marryat House only)

slide-6
SLIDE 6

Campbell House - Block Photos

slide-7
SLIDE 7

Jane Austen House - Block Photos

slide-8
SLIDE 8

Martineau House - Block Photos

slide-9
SLIDE 9

Marryat House - Block Photos