- G. H. MITCHELL ELEMENTARY SCHOOL
BRIDGEWATER, MA
COMMUNITY PRESENTATION
JUNE 13, 2019
Raymond Design Associates
S CHEMATIC D ESIGN | N EW C ONSTRUCTION STUDY OPTION C6.1 On April - - PowerPoint PPT Presentation
G. H. M ITCHELL E LEMENTARY S CHOOL B RIDGEWATER , MA C OMMUNITY P RESENTATION J UNE 13, 2019 Raymond Design Associates R ECAP | P ROJECT TO D ATE Fall, 2019: April July 2019: Anticipated town-wide February 2015: Development of schematic
BRIDGEWATER, MA
JUNE 13, 2019
Raymond Design Associates
Community Presentation | June 13, 2019 2
February 2015: Roof Collapse at Mitchell Elementary School followed by sprinkler system pipe failure that led to flooding of “Central Wing” November 2017 – May 2018: Public procurement, Interviews, Selections, and MSBA approvals for hiring of Owner’s Project Manager and Architect April – July 2019: Development of schematic design and cost estimates Community Workshops and Public Presentations to gather input and comments on the new Mitchell School design January 14, 2016: Statement of Interest submitted to Massachusetts School Building Authority (MSBA) February 15, 2017: MSBA voted Mitchell ES into Eligibility Period. June 10, 2017: Bridgewater voters approve $800,000 to fund Feasibility Study June 2018 – April 2019: Study of location/site options (7 sites studied), grade configuration options (PreK – 2 or PreK-3), and existing conditions of building and site at 500 South Street.
MSBA approval and invitation to Schematic Design phase. August 2019: Anticipated MSBA Board of Directors meeting to receive approval of Schematic Design. Next step, Funding the Project! Fall, 2019: Anticipated town-wide ballot to vote for funding design/construction of the new Mitchell Elementary School
We Are Here
Community Presentation | June 13, 2019 3
On April 10, 2019 the MSBA approved the Preferred Option (C6.1) and invited the project to proceed in to the Schematic Design Phase
http://bridgewaterschoolproject.com/why-build-option-c6-1/
Community Presentation | June 13, 2019 4
The Bridgewater School Building Committee hosted two “interactive” community workshops on May 8th and June 6th to give members of the public a chance to view some of the new school plan details and provide feedback and comments on the following topics:
We asked the people who attended:
Here is an overview of the feedback we received …
Community Presentation | June 13, 2019 5
Community Presentation | June 13, 2019 6
meet educational program
spaces
Security / Centralized Admin
and after school programs
Community Presentation | June 13, 2019 7
(approx. 302)
circulation
areas
(approx. 63 cars can queue on- site)
(right turn only)
benches in playgrounds
Community Presentation | June 13, 2019 8
entrance
volleyball court with 120 bleacher seats
seating for 375 (one of the largest meeting spaces in town)
between Cafeteria and Gym to allow for expanded or programs
and outdoor learning spaces
Community Presentation | June 13, 2019 9
MITCHELL SCHOOL – NEW CONSTRUCTION Option C6.1 FEASIBILITY STUDY
(OPM, Designer, Environmental, Site, Other)
$800,000
CONSTRUCTION
(Demolition, Foundation, Shell, Interiors, Mechanical-Electrical-Plumbing & Fire Protection, Fixtures, Sitework)
$65,962,536
“ SOFT COSTS” ADMINISTRATION, OPM, ARCHITECT, FF&E, OTHER MISC.
(Legal, Printing, Advertising, Utility, Permitting, Moving, Testing & Inspections, Furniture & Equipment, Other Project Costs)
$11,430,000
CONTINGENCY
(Owners and Construction Contingency)
$3,960,000
TOTALPROJECT
$82,152,536
Anticipated Rate Anticipated Cost Anticipated MSBA Reimbursement Rate w/ Incentives for Eligible Costs 59.28%
Example ineligible costs: legal fees, advertising, printing, moving, permits, utility costs Example capped costs: Construction Cost ($333/SF), Furniture, Fixtures and Equipment ($2,400/student), Site costs (8% max)
Estimated MSBA “Effective” Reimbursement Rate of Total Project Costs 40.00% Anticipated MSBA Reimbursement (est. 40% of Total Project Cost)
$32,861,014 Anticipated Town Share (est. 60% of Total Project Cost) $49,291,522
Community Presentation | June 13, 2019 10
Average Cost per Year for Average Single Family Home Value
$482 $433 $384 $346 $311 $282 $251 $0 $100 $200 $300 $400 $500 $600 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25
Amount per Year Years
Amount Per Year Average Single Family Home Value of $385,759
1) The worst impact will be the first yea r and then the debt service w ill decline as the principal is paid down. Impact based on the average assessed value home of $385,759 less MSBA reimbursement and proposed offsett ing revenues and an assumed 3.5% interest rate.
Community Presentation | June 13, 2019 11
Calculating Your Cost
Assessed Property Value (From Your Tax Bill) / $1,000 X (Rate per $1,000) = Annual Cost
Example School Building $459,000 / $1,000 X $1.25 = $574
(1) Please note these are estimates and subject to change. The average assessed home value in Bridgewater is currently $385,759, and changes annually. (2) Project cost estimates based on a 25 year bond (3) The financial advisor has recommended we assume a conservative 3.5% interest rate. (4) Other major Town projects that may require funding in the future are Fire Station, Roadways, and Drainage.
Community Presentation | June 13, 2019 12
Community Presentation | June 13, 2019 13
Community Presentation | June 13, 2019 14
Community Presentation | June 13, 2019 15
Community Presentation | June 13, 2019 16