Ringway Highway Liaison Meeting presentation Rob Payne Service Integration Team Leader The Scope of the HST Contract The Highway Service Term contract of approximate initial value 30-35M pa which covers: Cat 1, 2 and 5 Contractor


slide-1
SLIDE 1

Ringway Highway Liaison Meeting presentation

Rob Payne – Service Integration Team Leader

slide-2
SLIDE 2

The Scope of the HST Contract

The Highway Service Term contract of approximate initial value £30-35M pa which covers:

  • Cat 1, 2 and 5 – Contractor Directed Services

– Emergency response, First line reactive repairs, Planned minor highway repairs and improvements, Holistic street lighting management service, Cyclical and routine maintenance for grass, drainage, safety barriers, street furniture, pumps and Winter Service

  • A variable quantity of medium and large improvement schemes

(Cat 3 – HLB or Cat 4 works) on a design and build basis

  • A variable quantity of carriageway maintenance, footways and

drainage (Cat 4 works) on a design and build basis

  • The provision, management and operation of intelligent traffic

systems including traffic signals

slide-3
SLIDE 3

Fundamentals of the HST Contract

A fundamental move from Reactive to Planned works facilitated by:

  • A holistic approach to defect management based on asset

intelligence:

– Indentifying both Cat 1 and Cat 2 defects in a single inspection

  • Reviewing Cat 2 Work Pools monthly (Reactive Asset

Management) with a view to:

– Preparing planned interventions – Diverting works to the Cat 3 (Member funded) programme – Diverting works to the Cat 4 (Structural Maintenance) programme

slide-4
SLIDE 4

The Ringway Team

slide-5
SLIDE 5

The role of the Ringway DSA

“To liaise with the local community across the whole HST service and manage the effective implementation of the Cat 3 programme at a local level”

The role of the Ringway LNT

“To gather network intelligence through targeted condition surveys, interaction with stakeholders and close liaison with Safety Inspectors and the Supervisors who will deliver the Countywide Services in the area”

slide-6
SLIDE 6

Who does what?

HCC

  • Ensuring localism

agenda is delivered across the whole service

  • HCC procedure and

policy enquiries

  • Cat 3 process (pre-

commitment stage)

  • Enforcement issues

Ringway

  • Ensuring localism

agenda is delivered across the HST contract

  • Contractor Directed

Services (Cat 1, 2 & 5) enquiries

  • Cat 3 process (post

commitment stage)

  • Network condition

monitoring

slide-7
SLIDE 7

Enhanced coordination of works

The Operations Hub is central to Ringway’s approach to coordinating Contractor Directed Services in

  • Hertfordshire. The role of the Hub is to:
  • Centrally prioritise all works to minimise network disruption
  • Mobilise emergency and reactive gangs
  • Link with the HCC ITCC to enable a coordinated Network

Management approach

  • Provide real time information from eServe to CONFIRM
  • Co-ordinate “out of hours” support arrangements
  • Improve journey time reliability
slide-8
SLIDE 8

Customer

sees a defect

Fault Reported

Call Centre (0300 1234 047)

  • r

Online – Herts Direct

Ringway (Hub)

Assessment made using HCC Defect Management Policy

Cat 2 (Non Safety Related)

Med / Low Priority defect(s) passed to HCC HLO for consideration under county member Cat 3 Budget

Cat 1 (Safety)

urgent / safety Related faults – goes straight

  • ut to be actioned on the ground

Cat 2 (Non Safety Related)

Ringway DSA to ‘Assess and Decide’ using HCC policy and criteria priority status and develop programme

  • f work for high priority

Passed to 3rd Party

e.g. electric, gas, District / Borough issues

IWP/ FWP

Checked against - to identify any links or promote New scheme via

(Cat 4)

If not delivered via Cat 3 Ringway re-consider later that financial year

slide-9
SLIDE 9