RICHARDSON ISD 2013-2014 PROJECTS BOARD OF TRUSTEES PRESENTATION - PowerPoint PPT Presentation

RICHARDSON ISD 2013-2014 PROJECTS BOARD OF TRUSTEES PRESENTATION SEPTEMBER 09, 2013 RICHLAND ELEMENTARY SCHOOL RICHLAND ELEMENTARY SCHOOOL / Overall Campus Plan + Enlarged Floor Plans MAIN ENTRY ADMINISTRATION RENOVATION OVERALL CAMPUS PLAN


  1. RICHARDSON ISD 2013-2014 PROJECTS BOARD OF TRUSTEES PRESENTATION SEPTEMBER 09, 2013

  2. RICHLAND ELEMENTARY SCHOOL

  3. RICHLAND ELEMENTARY SCHOOOL / Overall Campus Plan + Enlarged Floor Plans MAIN ENTRY ADMINISTRATION RENOVATION OVERALL CAMPUS PLAN 50 100 NEW FLOOR, WALL, AND CEILING FINISHES RESTROOM AND SERVICE IMPROVEMENTS EXISTING GYM ADMINISTRATION IMPROVEMENTS CLASSROOM IMPROVEMENTS CEILING AND LIGHTING IMPROVEMENTS OUT OF SCOPE CLASSROOM ADDITION

  4. RICHLAND ELEMENTARY SCHOOOL / Overall Campus Plan + Exterior Perspectives MAIN ENTRY OVERALL CAMPUS PLAN 50 100 NEW FLOOR, WALL, AND CEILING FINISHES RESTROOM AND SERVICE IMPROVEMENTS ADMINISTRATION IMPROVEMENTS CLASSROOM IMPROVEMENTS CEILING AND LIGHTING IMPROVEMENTS OUT OF SCOPE EXTERIOR PERSPECTIVES

  5. RICHLAND ELEMENTARY SCHOOOL / Overall Campus Plan + Interior Perspectives 1 1 3 2 2 PARTIAL FLOOR PATTERN PLAN 3 INTERIOR PERSPECTIVES

  6. BRENTFIELD PRIMARY + INTERMEDIATE SCHOOL

  7. BRENTFIELD PRIMARY + INTERMEDIATE SCHOOL / Overall Campus Plan MAIN ENTRY OVERALL CAMPUS PLAN 60 120 RESTROOM AND SERVICE IMPROVEMENTS ADMINISTRATION IMPROVEMENTS CLASSROOM IMPROVEMENTS OUT OF SCOPE BRENTFIELD PRIMARY SCHOOL ADDITIONAL SCOPE OF WORK • PROVIDE SOUND AT STAGE AND REPLACE ELECTRICAL SWITCHGEAR • DRAINAGE AND GRADING IMPROVEMENTS AT SOFTSCAPE / LANDSCAPE TO ADDRESS CHRONIC FLOODING ISSUES • REPLACE 1989 ROOFTOP AHUs • REPLACEMENT OF DETERIORATED CONCRETE AT DRIVEWAYS AND SIDEWALKS • REPLACE HOLLOW METAL EXTERIOR DOORS WITH RISD STANDARD FRP • ADA RAMPS AND ROUTES TO ACCESSIBLE PARKING • SELECTIVE PAINTING

  8. BRENTFIELD PRIMARY + INTERMEDIATE SCHOOL / Overall Campus Plan + Enlarged Floor Plans MAIN ENTRY OVERALL CAMPUS PLAN 60 120 RESTROOM AND SERVICE IMPROVEMENTS ADMINISTRATION IMPROVEMENTS CLASSROOM IMPROVEMENTS OUT OF SCOPE BRENTFIELD INTERMEDIATE SCHOOL ADDITIONAL SCOPE OF WORK • PROVIDE SOUND AT STAGE AND REPLACE ELEC SWITCHGEAR • REPLACE 1989 ROOF TOP AHUs • REPLACE HOLLOW METAL EXT DOORS WITH RISD STANDARD FRP • SELECTIVE PAINTING ADMINISTRATION RENOVATION

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.