SLIDE 1
Expanded Scope
2
- Original contract award did not include replacement
- f the existing electrical switchgear equipment.
- Staff has determined that it is in the best interests of
APS to replace the switchgear concurrent with the renovation project.
- A change order is required for switchgear
replacement.
- School Board approval is required for an individual