  1. Region 5 Upcoming Proj ects S ummer/ Fall 2018

  2. The budget amount provided does not reflect the construction costs for projects. The amounts may include ROW, engineering, design, and utility costs. The projects in this presentation are not guaranteed to go to advertisement.

  3. Projects located in Archuleta, La Plata, Montezuma and Mineral Counties

  4. US 160 Resurfacing on Elmore’s East; 22010 ∙ Planned Ad Date : December 14, 2017 ∙ Approximate Budget: $6 million budget ∙ County : La Plata ∙ Work: This surface treatment proj ect will resurface the roadway on US 160 from MP 91.42-102.72 from the Jct of US 172 to Bayfield.

  5. US 160 SH 84 to Treasure Falls Surface Treatment; 20705 ∙ Planned Ad Date : January 11, 2018 ∙ Approximate Budget: $8 million budget ∙ County : Archuleta and Mineral ∙ Work: This surface treatment proj ect will resurface the roadway from MP 114.5- 158.5, and includes a chain up and down station at MP 157.3

  6. SH 145 Dolores Sidewalk Ramps; 19796 ESB Restricted Project ∙ Planned Ad Date : November 30, 2017 ∙ Approximate Budget: $400,000 ∙ County : Montezuma ∙ Work: Proj ect work includes construction of sidewalk and ADA compliant curb ramps in Dolores at MP 9.6-10.6 on S H 145. Other work includes concrete flatwork for cross-pan curb and gutter, inlet repair, and minor landscaping repair. S igns, light poles, and a fence will be reset.

  7. R5 Guardrail End Treatment Replacement; 22120 ∙ Planned Ad Date : To be determined ∙ Approximate Budget: $2 million ∙ County : Region-wide ∙ Work: Replace old standard guardrail end treatments throughout Region 5.

  8. Projects located in Fremont (Region 2) & Saguache Counties

  9. US 50 Passing Lanes East of Salida (Fremont County); 20401 ∙ Planned Ad Date: To be determined ∙ Approximate Budget: $5 million ∙ County : Fremont ∙ Work: This proj ect located in Fremont County on US 50 between MP 227.2 and 237.4 consists of the addition of a passing lane in both directions and the addition of slow vehicle pullouts.

  10. US 50 Structure Replacement; 21338 ∙ Planned Ad Date: February 5, 2018 ∙ Approximate Budget: $2 million ∙ County : S aguache ∙ Work: This proj ect includes the replacement of a two lane bridge structure with a concrete box culvert.

  11. Traffic and Safety Projects

  12. US 550 Traffic Signal Replacement and ADA Ramp Construction; 20737 ∙ Planned Ad Date : November 30, 2017 ∙ Approximate Budget: $3.9 million budget ∙ County : La Plata Photo: Google Earth ∙ Work: Replace signals, upgrade infrastructure and reconfigure side street approaches. Construct ADA Accessible Pedestrian S ignals and sidewalk ramps at 3 intersections in Durango.

  13. US 550 and SH 62 Striping and Rumble Strips; 21743 ∙ Planned Ad Date: January 4, 2018 ∙ Approximate Budget: $1 million ∙ County : La Plata, Ouray, S an Juan, S an Miguel Photo: Google Earth ∙ Work: Rumble strips and restriping on US 550 MP 37.3-44 & 96.0-117.0, and S H 62 MP 9.0-16.0 .

  14. US 160 Wolf Creek Pass RSA; 21744 ∙ Planned Ad Date : January 18, 2018 ∙ Approximate Budget: $2.2 million budget ∙ County : Mineral ∙ Work: S ignage and striping upgrades on US 160 from MP 160 to 166.5. Includes inlaid restriping, centerline rumble strips, two sign bridges, sign removal, sign panel replacements, and type 7 barrier with embankment, asphalt removal, and shoulder improvements.

  15. US 550 Chain Station & VMS at MP 94; 20894 Planned Ad Date : February 8, 2018 • ∙ Approximate Budget: $750,000 ∙ County : Ouray ∙ Work: Work includes chipseal, restriping for chain up station, roadway widening for chain down station, install lighting and VMS board.

  16. R5 Region-wide Re-Stripe; 22310 Planned Ad Date : January 4, 2018 • ∙ Approximate Budget: $1.3 million ∙ County : Region-wide ∙ Work: Yearly restriping of highways in Region 5.

  17. R5 Chain Station Improvements; 22119 Planned Ad Date : May 18, 2018 • ∙ Approximate Budget: $1.2 million ∙ County : Region-wide ∙ Work: Providing improvements to chain stations, adding or upgrading lighting, improving striping, and potential widening.

  18. US 550 Riverside Snowshed Tunnel; 20799 Planned Ad Date : March 18, 2018 • ∙ Approximate Budget: $750,000 ∙ County : Ouray, Red Mountain Pass ∙ Work: This proj ect includes the update of lighting in the Riverside S nowshed Tunnel.

  19. Local Agency Construction Projects

  20. Salida US 50 Sidewalks Phase 4; 20557 ∙ Local Agency: City of S alida ∙ Planned Ad Date : S pring of 2018 ∙ Approximate Budget: $500,000 ∙ Work: This proj ect involves the construction of concrete sidewalk separated from the back of curb with a colored, textured concrete buffer on both sides of US 50 from Palmer S t to the intersection of S H 291 on US 50 in S alida. S ome curb and gutter and curb ramps may be replaced. S ome accesses may be moved or changed.

  21. Pagosa Springs North 8 th Street SRTS; 21504 ∙ Local Agency: Town of Pagosa S prings ∙ Planned Ad Date : S pring of 2018 ∙ Approximate Budget: $ 400,000 ∙ Work: This proj ect involves construction of sidewalks and curb and gutter in the north Pagosa S prings residential neighborhood on North 8 t h S t and Florida S t.

  22. San Miguel Lawson Hill Park and Ride; 21755 ∙ Local Agency : S an Miguel County ∙ Planned Ad Date : S pring 2018 ∙ Approximate Budget: $1.5 million ∙ Work: This is a S enate Bill 228 funded Transit proj ect that will be advertised by S an Miguel County. This proj ect involves construction of a paved park-and-ride facility on Lot Hub-2C between S ociety Drive and S H 145 j ust west of Telluride.

  23. Archuleta CO Pagosa Junction BRO; 21898 ∙ Local Agency: Archuleta County ∙ Planned Ad Date : S pring of 2018 ∙ Approximate Budget: $250,000 ∙ Work: This is an Archuleta County proj ect for the rehabilitation of bridge structure AR500-15.8-S 151 located on CR 500 (Truj illo Rd) at Pagosa Junction within the S outhern Ute Indian Tribe Reservation. The bridge is currently structurally deficient and will be rehabilitated and brought up to current standards with this proj ect.

  24. FY 17 Durango School Signs SRTS; 22063 ∙ Local Agency: City of Durango ∙ Planned Ad Date : S ummer of 2018 ∙ Approximate Budget: $75,000 ∙ Work: Procurement of school signs at various locations around the City of Durango.

  25. Local Agency Projects for Design

  26. Archuleta CO Pagosa Junction BRO; 21898 ∙ Local Agency: Archuleta County ∙ Planned Ad Date : Fall/ Winter 2017 ∙ Approximate Budget: $250,000 ∙ Work: This is an Archuleta County proj ect for the rehabilitation of bridge structure AR500- 15.8-S 151 located on County Road 500 (Truj illo Rd) at Pagosa Junction within the S outhern Ute Indian Tribe Reservation. The bridge is currently structurally deficient and will be rehabilitated and brought up to current standards with this proj ect. CDOT S taff Bridge has offered to complete Bridge Rehab Design but a Consulting Engineering Firms will be needed to complete clearances, finalize plans and specs and prepare bid package.

  27. Durango College Dr and E 8 th Ave; 22062 ∙ Local Agency: City of Durango ∙ Planned Ad Date : Fall/ Winter 2018 ∙ Approximate Budget: $1 million ∙ Work: Trolley stop improvements using CDOT FAS TER Transit funding and road diet/ safety improvements using CDOT HS IP funding on College Dr from E 3rd Ave to E 8th Ave and on E 8th Ave from College Dr to 1st S t.

  28. Archuleta CR 600 Guardrail; 22269 ∙ Local Agency: Archuleta County ∙ Planned Ad Date: Fall/ Winter 2017 ∙ Approximate Budget: $100,000 ∙ Work: Improvements to guardrail on Archuleta CR600 (Piedra Rd). Approximately 6 recently installed guardrail end treatments are too close to the travelled way and need to be flared away from traffic on the approach end. Design appropriate modifications and work through enviro, ROW and utility clearances and prepare bid documents.

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.