Redesign of the Redesign of the Arborway: y Kelley Circle to Murray - - PowerPoint PPT Presentation

Redesign of the Redesign of the Arborway: y Kelley Circle to Murray Circle Design By: HUB Engineering, Inc. Michelle Boccia Michelle Boccia Andrew Caparco Andrew Caparco Joseph Mayotte Jocelyn Rothstein Existing Conditions: Emerald


slide-1
SLIDE 1

Redesign of the Redesign of the Arborway: y

Kelley Circle to Murray Circle

Design By: HUB Engineering, Inc.

Michelle Boccia Andrew Caparco Michelle Boccia Andrew Caparco Joseph Mayotte Jocelyn Rothstein

slide-2
SLIDE 2

Existing Conditions:

Emerald Necklace Jamaica Pond Arnold Arboretum Project Area

HUB Engineering, Inc. Redesign of the Arborway April 2008

slide-3
SLIDE 3

Existing Conditions:

Kelley Circle Kelley Circle Murray Circle

HUB Engineering, Inc. Redesign of the Arborway April 2008

slide-4
SLIDE 4

Objectives:

  • Provide a high quality multi‐

use path.

  • Maintain arterial capacity.
  • Convert road space to green
  • Provide a high quality multi‐

use path.

  • Maintain arterial capacity.
  • Provide safe pedestrian

crossings.

  • Convert road space to green

space.

  • Convert inaccessible green
  • Provide safe pedestrian

crossings.

  • Separate regional and local

traffic.

  • Provide reasonable access to

space to accessible green space.

  • Preserve existing landscape
  • Separate regional and local

traffic.

  • Provide reasonable access to

Provide reasonable access to and from local streets while discouraging cut‐thru traffic. g p and mature trees. Provide reasonable access to and from local streets while discouraging cut‐thru traffic.

HUB Engineering, Inc. Redesign of the Arborway April 2008

slide-5
SLIDE 5

Northeastern Proposed Design:

Signal added at Eliot Street. Signalized intersection replaces Two coordinated signals replace current rotary at Kelley Circle. intersection replaces existing rotary at Murray Circle. Outer Arborways now two-way 18’ roadways. Proposed 10’ Paved Multi-Use Path and 6’ Stone Dust Path Existing signal at Pond Street Crossover signal separates EB Left and EB Through

HUB Engineering, Inc. Redesign of the Arborway April 2008

  • n Str

t replaced with all- way stop. EB Left and EB Through traffic in order to increase capacity.

slide-6
SLIDE 6

Paths:

Existing Cross Section

HUB Engineering, Inc. Redesign of the Arborway April 2008

Proposed Cross Section

slide-7
SLIDE 7

Origin-Destination Study:

HUB Engineering, Inc. Redesign of the Arborway April 2008

slide-8
SLIDE 8

Analysis of Proposed Improvements

Weekday AM: v/c 0.57 LOS A Weekday PM: / 0 65 LOS A Weekday AM: v/c 0.65 LOS A Weekday AM: v/c 0.67 LOS B Weekday PM: / 0 60 LOS B W ay M v/c 0.59 LOS B Weekday PM: v/c 0.74 LOS B v/c 0.60 LOS B Weekday AM: v/c 0.97 LOS B Weekday PM: / 0 80 LO Weekday AM: v/c 0.57 LOS B Weekday AM: v/c 0.53 LOS B W kd PM v/c 0.80 LOS A HUB Engineering, Inc. Redesign of the Arborway April 2008 Weekday PM: v/c 0.36 LOS B Weekday PM: v/c 0.64 LOS B

slide-9
SLIDE 9

Existing Recreational Greenspace:

Accessible Greenspace Inaccessible Inaccessible Greenspace

HUB Engineering, Inc. Redesign of the Arborway April 2008

slide-10
SLIDE 10

Proposed Recreational Greenspace:

New Greenspace = 4.45 Acres N l Acc ssibl G nsp c 5 60 Ac s Newly Accessible Greenspace = 5.60 Acres Total Greenspace Gained = 10.05 Acres Inaccessible Accessible

HUB Engineering, Inc. Redesign of the Arborway April 2008

Inaccessible Greenspace Accessible Greenspace

slide-11
SLIDE 11

VISSIM…

HUB Engineering, Inc. Redesign of the Arborway April 2008

slide-12
SLIDE 12

Evaluation:

  • Design provides a 10’ paved multi‐

th ll 6’ t d t

  • Design maintains current arterial

it

  • Design provides a 10’ paved multi‐

th ll 6’ t d t

  • Design maintains current arterial

it use path as well as a 6’ stone dust path.

  • All crossings are signal protected.

capacity.

  • Design converts road space to

green space. use path as well as a 6’ stone dust path.

  • All crossings are signal protected.

capacity.

  • Design geometrically separates

regional and local traffic.

  • Design provides reasonable
  • Design converts inaccessible

green space to accessible green space.

  • Design geometrically separates

regional and local traffic.

  • Design provides reasonable
  • Design provides reasonable

access to and from local street.

  • No mature trees along the

Arborway disrupted.

  • Design provides reasonable

access to and from local street.

HUB Engineering, Inc. Redesign of the Arborway April 2008

slide-13
SLIDE 13

Questions?

HUB Engineering, Inc. Redesign of the Arborway April 2008