Redesign of the Redesign of the Arborway: y
Kelley Circle to Murray Circle
Design By: HUB Engineering, Inc.
Michelle Boccia Andrew Caparco Michelle Boccia Andrew Caparco Joseph Mayotte Jocelyn Rothstein
Redesign of the Redesign of the Arborway: y Kelley Circle to Murray - - PowerPoint PPT Presentation
Redesign of the Redesign of the Arborway: y Kelley Circle to Murray Circle Design By: HUB Engineering, Inc. Michelle Boccia Michelle Boccia Andrew Caparco Andrew Caparco Joseph Mayotte Jocelyn Rothstein Existing Conditions: Emerald
Design By: HUB Engineering, Inc.
Michelle Boccia Andrew Caparco Michelle Boccia Andrew Caparco Joseph Mayotte Jocelyn Rothstein
Emerald Necklace Jamaica Pond Arnold Arboretum Project Area
HUB Engineering, Inc. Redesign of the Arborway April 2008
Kelley Circle Kelley Circle Murray Circle
HUB Engineering, Inc. Redesign of the Arborway April 2008
use path.
use path.
crossings.
space.
crossings.
traffic.
space to accessible green space.
traffic.
Provide reasonable access to and from local streets while discouraging cut‐thru traffic. g p and mature trees. Provide reasonable access to and from local streets while discouraging cut‐thru traffic.
HUB Engineering, Inc. Redesign of the Arborway April 2008
Signal added at Eliot Street. Signalized intersection replaces Two coordinated signals replace current rotary at Kelley Circle. intersection replaces existing rotary at Murray Circle. Outer Arborways now two-way 18’ roadways. Proposed 10’ Paved Multi-Use Path and 6’ Stone Dust Path Existing signal at Pond Street Crossover signal separates EB Left and EB Through
HUB Engineering, Inc. Redesign of the Arborway April 2008
t replaced with all- way stop. EB Left and EB Through traffic in order to increase capacity.
Existing Cross Section
HUB Engineering, Inc. Redesign of the Arborway April 2008
Proposed Cross Section
HUB Engineering, Inc. Redesign of the Arborway April 2008
Weekday AM: v/c 0.57 LOS A Weekday PM: / 0 65 LOS A Weekday AM: v/c 0.65 LOS A Weekday AM: v/c 0.67 LOS B Weekday PM: / 0 60 LOS B W ay M v/c 0.59 LOS B Weekday PM: v/c 0.74 LOS B v/c 0.60 LOS B Weekday AM: v/c 0.97 LOS B Weekday PM: / 0 80 LO Weekday AM: v/c 0.57 LOS B Weekday AM: v/c 0.53 LOS B W kd PM v/c 0.80 LOS A HUB Engineering, Inc. Redesign of the Arborway April 2008 Weekday PM: v/c 0.36 LOS B Weekday PM: v/c 0.64 LOS B
Accessible Greenspace Inaccessible Inaccessible Greenspace
HUB Engineering, Inc. Redesign of the Arborway April 2008
New Greenspace = 4.45 Acres N l Acc ssibl G nsp c 5 60 Ac s Newly Accessible Greenspace = 5.60 Acres Total Greenspace Gained = 10.05 Acres Inaccessible Accessible
HUB Engineering, Inc. Redesign of the Arborway April 2008
Inaccessible Greenspace Accessible Greenspace
HUB Engineering, Inc. Redesign of the Arborway April 2008
th ll 6’ t d t
it
th ll 6’ t d t
it use path as well as a 6’ stone dust path.
capacity.
green space. use path as well as a 6’ stone dust path.
capacity.
regional and local traffic.
green space to accessible green space.
regional and local traffic.
access to and from local street.
Arborway disrupted.
access to and from local street.
HUB Engineering, Inc. Redesign of the Arborway April 2008
HUB Engineering, Inc. Redesign of the Arborway April 2008