PUD Cost of Service Presentation

June e 11 11, 20 2014 14 Pier erce ce Co County y Co Commun unity ity Meeting ing with PUD Commissione issioners rs

1

slide-2
SLIDE 2
  • 1. Discuss the PUD’s current rates and fees
  • 2. PUD services and history
  • Operating the water systems
  • Ensuring future service: capital improvements

and asset management

  • 3. Accountability
  • 4. Proposed rates and fees
  • 5. Next steps

2

slide-3
SLIDE 3

Water r bill = b base rate + co consumptio umption n rate Base rate: flat charge per month; depends on meter size, customer type, and location For a ¾-inch residential water meter: Q: Why are they different?

A: Thurston County residents also pay a property tax; A: Bonds for Tanglewilde-Thompson Place improvements issued in 2011 A: Extra travel time to operate systems outside Thurston County

3

Inside Thurston County Tanglewilde-Thompson Place $26.20/month All Other Customers $24.75/month Outside Thurston County $28.75/month

slide-4
SLIDE 4

Consumpti sumption

  • n rate: based on water use; “increasing

block” rate structure – the more you use, the higher the charge Q: Why are they different? A: To promote efficient use of a limited resource

“ccf” = hundred cubic feet

4

0 - 5 ccf per month $2.21/ccf 5 - 15 ccf per month 3.39/ccf 15 - 30 ccf per month 4.68/ccf >30 ccf per month 5.32/ccf

slide-5
SLIDE 5

Consumpti sumption

  • n rate: based on water use; “increasing

block” rate structure – the more you use, the higher the charge Q: Why are they different? A: To promote efficient use of a limited resource

Average use = 7.5 ccf/month

5

0 - 5 ccf per month $2.21/ccf 5 - 15 ccf per month 3.39/ccf 15 - 30 ccf per month 4.68/ccf >30 ccf per month 5.32/ccf

slide-6
SLIDE 6

Your r monthly ly wa water bill, if you are in Pi Pierce e County nty:

Wa Water r Use se, , ccf/ f/month month Monthly nthly Bill ll 5 $39.80 7.5 $48.28 10 $56.75 20 $97.10

6

slide-7
SLIDE 7
  • Description of PUD and water systems
  • Operating a water system: “What We

Do”

  • Asset management: reliable service

in the future

7

slide-8
SLIDE 8
  • Formed in 1938; Started serving multiple

systems in 2005

  • Mission

sion: : Pr Provid vide e safe, e, reliable, ble, affordabl dable, e, and d sustainabl tainable e wa water servi vices ces to the custo tomers mers we we serve ve

  • Operates 155 water systems centered in

Thurston, Lewis and Pierce Counties

  • ~3,200 customers
  • 35% outside Thurston County
  • 42% in Tanglewilde-Thompson Place System
  • 23% in other Thurston County systems
  • Except Tanglewilde-Thompson Place, average system has

12 connections

8

slide-9
SLIDE 9
  • 164 wells
  • 54 miles of mains
  • 130 pump houses
  • 62 booster stations
  • 520 pressure tanks
  • Plus: service lines – isolation valves – blowoff

assemblies – reservoirs – treatment facilities – meters on each well – meters for each customer.

9

slide-10
SLIDE 10
  • 164 wells
  • 54 miles of mains
  • 130 pump houses
  • 62 booster stations
  • 520 pressure tanks
  • Plus: service lines – isolation valves – blowoff

assemblies – hydrant assemblies – reservoirs – treatment facilities – meters on each well – meters for each customer.

20 customers for each well 90 feet of pipe per customer 6 customers for each pressure tank

10

slide-11
SLIDE 11

11

slide-12
SLIDE 12

12

slide-13
SLIDE 13
  • On

On-call call 24 hours rs a d a day ay, , 7 day ays a a We Week (24/7), 4/7), 365 day ays s a ye a year ar

  • Daily - monitoring of chlorine residuals
  • Weekly - visits to all treated systems
  • Monthly - visits to all systems
  • Minor repairs and maintenance, as needed
  • Collect monthly and annual coliform samples,

plus nitrates and other required sampling per DOH requirements

  • Completes annual reports to customers and

DOH

13

slide-14
SLIDE 14
  • 2012-2013 PUD developed an Asset

Management Plan

  • Calculated the life cycle of all

infrastructure in the PUD’s 155 water systems

  • Established a time line when each

water systems infrastructure needs to be replaced or refurbished

14

slide-15
SLIDE 15
  • Established replacement or

refurbishment costs for all infrastructure

  • Wells and pumps and booster stations
  • Reservoirs, storage and treatment

systems

  • Water mains, service lines and water

meters

  • Pump houses and other infrastructure

15

slide-16
SLIDE 16
  • Re

Replace ce 11 110 0 well pumps

  • Re

Replace ce 24 240 0 pressure ure tanks

  • Re

Replace ce 43 43 ch chemic ical al pumps ps

  • Re

Rebuild ld 5 p 5 pump houses

  • Leak

k detect ction,

  • n, leak repairs
  • Re

Replace ce some water meters rs

  • Drill

l 2 n 2 new wells

  • Re

Replace ce 20 20 booste ter r pumps

  • Water

r line replacements cements

  • ......and

nd more

16

slide-17
SLIDE 17
  • 2014

14 – PUD hire red d Le Leidos

  • s as

as a a consultant nsultant to conduct nduct a a cost st of f se serv rvic ice e study dy (COS) OS) to eva valuate ate how w to pay ay fo for r infra frastructure structure re replac acement ement or r re refurbishment furbishment in in al all wa l water r sy syst stems ms

  • Sprin

ring g of f 2014 4 - PUD Commissioners mmissioners were re bri riefed fed on re recomm

  • mmend

endations ations an and pro rovided vided dire rection ction

17

slide-18
SLIDE 18
  • Summer

mmer 2014 4 – PUD Commissioners mmissioners ar are holding lding Public lic Meetin ings gs

  • Pierce

rce County unty on June e 11th

th

  • Le

Lewis is County unty on June 25th

th

  • Thurs

urston ton County nty on July y 9th

th

18

slide-19
SLIDE 19
  • Summer

mmer an and Fal all 2014 4 – PUD Comm mmissio issioners ners

  • Revie

view comments mments fr from m Public ic Meetings tings

  • Refine

fine re replacement/refu lacement/refurbis rbishment hment plan ans

  • Est

stablish ablish le leve vels ls of f se serv rvic ice

19

slide-20
SLIDE 20
  • Summer

mmer an and Fal all 2014 4 – PUD Comm mmissio issioners ners

  • Revie

view fu fundin ding g re recommen

  • mmendat

dation ions to imp mplement lement the as asset ma manag agemen ment t pla lan n (AM AMP) P)

  • Ho

Hold ld a P a Public lic He Hear aring ng

  • Fa

Fall ll 2014 4 to Ear arly ly 2015 5 - Ap Approve rove ra rates s an and fe fees to pay ay fo for r imp mplementing ementing the AM AMP

20

slide-21
SLIDE 21

 Upgrades and Repairs slideshow .pptx

21

slide-22
SLIDE 22

1.

  • 1. Custom

stomer er Sat atis isfa faction ction: : One of our most important measures is overall customer satisfaction.

  • Summer of 2014 - A Customer Survey

will be Conducted 2.

  • 2. Av

Avera rage ge Bil ill l Comparisons: mparisons: The District compares its water rates to other similar local water utilities – see next slide.

22

slide-23
SLIDE 23

Comparison

  • n of 2

2014 4 Rates to O Other r Thurston ton County y Rates

Utility Base Chg 1st

st Tier

2nd

nd Tier

3rd

rd Tier

4th Tier 5th

th Tier

Tier Break ak CCF TPUD $24.75 $2.21 $3.39 $4.68 $5.32 5/15/30 WA Water $19.15 $2.95 $3.60 $4.40 6/16 Thurston County Tamoshan $63.88 $2.12 No Tiers Boston Harbor $22.83 $1.71 No Tiers Grand Mound $33.36 $1.90 No Tiers H&R Waterworks $20.33 $1.36 $2.31 $2.81 7/20 Pattison Water Co. $19.13 $1.68 $1.98 $2.66 9/33.3 City of Yelm $30.04 $2.82 $4.35 $9.83 $10.67 $12.22 4/10/20/30

23

slide-24
SLIDE 24

24

$0 $20 $40 $60 $80 $100 $120 $140 $160 $180

5 10 15 20

Thurston PUD, In-County, Existing Thurston PUD, Outside County, Existing Washington Water Thurston County: Tamoshan Thurston County: Boston Harbor Thurston County: Grand Mound H&R Waterworks Pattison Water Co City of Yelm

Monthly Water Use, hundred cubic feet

slide-25
SLIDE 25

3. . S Serv rvice: ice:

  • Complaints per 1,000 customers is 3.75
  • PUD Compliance to Dept of Health Standards

99.354% Compliant.  One total coliform issue at Deschutes Glen; being resolved; engineer is working with PUD to re-engineer water system to eliminate issue

25

slide-26
SLIDE 26
  • 4. Percentage of customer payments made

electronically: Electronic payments offer an efficient and convenient method for customers

  • 29.4% of custome

mers rs use web sit ite to p pay

  • 9.1% of custome

mers rs pay usin ing g dir irect debit it

  • Hi

Histori rica cally, lly, 300 300 cu custome mers rs pay over r the phone ne monthly ly

26

slide-27
SLIDE 27
  • 5. Provide an annual Consumer Confidence

Report to all customers in July

  • 6. Measure and report Leak and Water Use

Efficiency Reports annually – post on web site

  • Set annual leak reduction goals and water

conservation goals

27

slide-28
SLIDE 28
  • PUD Meetings Are Open to the Public
  • Testimony can be made personally or in

written form

  • PUD Commissioners, the General Manager

and Staff care and can be reached by email, phone, fax or letter

  • The PUD will listen

28

slide-29
SLIDE 29
  • 1. The PUD organizational culture is frugal and

dedicated to fiscal conservatism and efficient business practices

  • 2. PUD has successfully secured $4,861,185 in

low interest loans and $1,361,000 in grants to make infrastructure improvements valued at a total of $6,222,185

29

slide-30
SLIDE 30
  • 3. Stopped purchasing water from the

City of Olympia for the Tanglewilde- Thompson Place water system

  • Rehabilitated 1 well and drilled 2 new wells
  • Future savings are in the mil

illi lions s of doll llars rs

30

slide-31
SLIDE 31
  • 4. Collected over $400,00

0,000 0 from developers to invest in PUD infrastructure

  • 5. Excellent Planning
  • Asset Management Plan
  • Cost of Service Study
  • Updated multiple plans with State

31

slide-32
SLIDE 32
  • 6. Refinanced Bonds - sa

save ved $158,00 8,000 0 in interest

  • 7. Reduced customer liabilities:

implemented credit checks, deposit system, property owner responsibility for bills, ready to serve rates for properties PUD is required to serve.

32

slide-33
SLIDE 33
  • 8. State Audits – No findings in 5 Years
  • 9. Rent – renegotiated rent saving

$4,0 ,000 00 an annually ally

  • 10. Contract with County for IT saving

1.0 FTE

33

slide-34
SLIDE 34
  • 11. Insurance
  • Changed insurance providers: save

ved d $18,000 a year

  • Reviewed health care costs and employee co-

pays

  • 12. Use State Purchasing – extensive savings
  • Vehicle approved vendor purchasing and

vehicle maintenance, surplusing, and printing,

  • Long distance service and some supplies

34

slide-35
SLIDE 35
  • 13. Revenue Generation – PUD operates

and manages 14 water systems of

  • ther owners
  • 2014 Budgeted Revenue of $8

$83, 3,00 000

  • 14. PUD has added customers to benefit

from economies of scale

  • New systems must come into at our

standards or pay to get there. Systems pay for themselves.

35

slide-36
SLIDE 36
  • 14. PUD has added customers to benefit

from economies of scale (Continued)

  • 2010-2013 - added three systems 145

new customers

  • 2014 – projected to add 290 customers by

July

  • 2014 – 200 other potential customers

36

slide-37
SLIDE 37
  • Rates: pay for O&M and debt service
  • Capital Surcharge: pay for Asset Management

Plan

  • Rates
  • Proposed annual increase not to exceed 4%: will be

evaluated annually and adjusted as needed

  • Maintain $4/house monthly rate differential for

customers outside Thurston County

  • Discontinue current ~$1.50/month/house rate

differential for Tanglewilde-Thompson Place

  • Discont

continu inue surchar charges ges for Crescent ent Park, , Terry Lane, Pederson Place, and Covington Estates systems

37

slide-38
SLIDE 38

3/4-in inch h water meter, $/month

2015 15 2016 16 2017 17 2018 18 2019 19 2020 20

$1.00

$2.90 $4.80 $6.70 $8.60 $10.50

38

Note: Charges for other meter size increase with increasing meter size;

slide-39
SLIDE 39
  • The following slides reflect planned

replacements

  • The PUD Operations Manager will speak to

the projected necessary replacements

39

slide-40
SLIDE 40

40

2014 - 2017 Isolation Valve Replacement or Repair $ 58,500 Tanglewilde-Thompson Place $ 40,000 Crescent Park $ 18,500 Leak Detection and Repair $ 120,000 Tanglewilde-Thompson Place $ 80,000 Various $ 40,000 Pumphouse Rebuilding $ 73,000 Brown S. Prairie $ 29,000 Olin $ 22,000 Ivan $ 22,000 Contact Time Installation $ 30,000 Ivan $ 30,000 Treatment System Replacement or Repair $ 97,000 Chemical Pumps (43) $ 70,000 Filters (13) $ 27,000 Pressure Tank Replacement $ 55,000 Pressure Tank Replacement (240) $ 45,000 Replumbing Pumps (6) $ 10,000 New Well Drilling $ 50,000 Fir Tree 2 $ 28,000 Loma Vista $ 22,000

slide-41
SLIDE 41

41

2014 - 2017 Well Decommissioning $ 37,500 304 #1 $ 7,500 Clerget $ 7,500 Evergreen $ 7,500 Lazy Acres $ 7,500 Whitney $ 7,500 Electrical Upgrades/Replacement $ 27,000 Various $ 12,000 Nisqually Highlands $ 7,500 Cornerstone $ 7,500 Mainline Replacement $ 65,000 Crowder $ 65,000 Pump Replacement $ 344,000 Well Pump Replacement (110) $ 244,100 Lew's 81st $ 9,500 Wilderness Glen $ 10,400 Booster Pump Replacement (20) $ 80,000 Meter Replacement $ 33,500 Corrosion Control Protection/Replacement $ 40,000 Nisqually Highlands $ 20,000 Prairie Villa $ 20,000 Miscellaneous $ 337,500 Tanglewilde-Thompson Place Generator $ 152,500 Travis Jack Booster Upgrades $ 125,000 Deschutes Glen Upgrades $ 20,000 Indian Crest 1 & 2 Upgrades $ 25,000 Terry Lane Well Casing Extention $ 15,000 Subtotal $ 1,368,000 Contingency - 15% $ 205,200 TOTAL CAPITAL NEEDS $ 1,573,200

slide-42
SLIDE 42

42

2018 - 2021

Isolation Valve Replacement or Repair $ 76,000 Tanglewilde-Thompson Place $ 40,000 Terry Lane $ 36,000 Leak Detection and Repair $ 120,000 Tanglewilde-Thompson Place $ 80,000 Various $ 40,000 Pumphouse Rebuilding $ 68,000 Tolmie $ 36,000 Lazy Acres - Foster St. $ 32,000 Contact Time Installation $ 30,000 Tracy 1 $ 30,000 Treatment System Replacement or Repair $ 120,500 Filters (13) $ 76,500 Chemical Pumps (43) $ 44,000

slide-43
SLIDE 43

43

2018 - 2021 Pressure Tank Replacement $ 42,000 Pressure Tank Replacement (240) $ 32,000 Replumbing Pumps (6) $ 10,000 Electrical Upgrades/Replacement $ 45,500 Tanglewilde-Thompson Place Seahawk $ 20,000 Various $ 18,000 Crowder $ 7,500 Mainline Replacement $ 2,500,000 Tanglewilde-Thompson Place $ 2,500,000 Pump Replacement $ 324,000 Well Pump Replacement (110) $ 264,000 Booster Pump Replacement (20) $ 60,000 Meter Replacement $ 54,500 $ 54,500 Subtotal $ 3,380,500 Contingency - 15% $ 507,075 TOTAL CAPITAL NEEDS $ 3,887,575

slide-44
SLIDE 44

44