FY2017 Annual Budget Public Works Public Works manages operations/planning, maintenance, and repairs City streets, sidewalks, drainage facilities, right of ways and airport functions. Additional responsibilities include: Traffic


  1. FY2017 Annual Budget Public Works Public Works manages operations/planning, maintenance, and repairs City • streets, sidewalks, drainage facilities, right of ways and airport functions. Additional responsibilities include: • Traffic Control, Emergency Response, Special Events, Regional planning, GTEC – Funding for the street maintenance program comes from the General Fund • and the Street Maintenance Sales Tax (reapproved in Nov-14). Funding for certain capital improvements comes from tax supported bonds • (May 2015 election).

  2. FY2017 Annual Budget Public Works Street Rehabilitation • 6 th Street at 7 th Street – Between Walnut and Holly • Downtown overlay district • $275,000 • 17 th Street – Complete reconstruction (Austin Avenue to Church Street) • Point repair, regrading, and overlay (Austin Avenue to Railroad Avenue) • $75,000 design (FY 17) • $550,000 construction (FY18) • West 11 th Street – Complete reconstruction (Main Street to Rock Street) • In conjunction with Sidewalk bond project. • $416,000 • West 10 th Street – Pavement rehab in conjunction with Sidewalk project on south side • $90,000 •

  3. FY2017 Annual Budget Public Works Street eet M Mainten enance • – Sealant On hold u ld until c il comple letio ion o of over erall r ll rev evie iew w of Ma Maintena nance P Practic ices. • $100,000 • Subdivisions - Churchill Farms, The Meadows, Pinnacle, La Conterra, Riata Trail • Streets - Cooperative Way, Snead Drive, Rock, Bridge, Scenic, Gabriel View, Country Club • – Hot-in Place Recycling - $819,000 On hold u ld until c il comple letio ion o of over erall r ll rev evie iew w of Ma Maintena nance P Practic ices. • Cutler Process • Single pass, hot in place asphalt recycler • Whispering Wind, Park Ln, Shannon Ln, Janis Dr, San Gabriel Overlook, Sunshine, • Meadowbrook, Oakland Dr, Ridge Oak, Live Oak, Spanish Oak

  4. FY2017 Annual Budget Public Works Street eet M Mainten enance e • Surface Sealer - $1,200,000 – On hold u until co completion o of overall r review o w of Maintenance P Pract ctices. • FY 17 areas include: • Dan Moody Trail – Honey Suckle Cv – Sunflower – Night Hawk Way – Yucca Cv – Wild Rose Way – Hill Country Dr – Six Flags Dr – High Trail Dr – Blacksmith – Lone Star Way – Berry Creek (SH 195- Oak Tree) – Airport Road (IH25-Cavu) –

  5. FY2017 Annual Budget Public Works Street eet M Mainten enance • – Point Repair and Overlay $300,000 • Thin Overlay Mix – 1” new asphalt • Inner Loop (south of SH 29) • Rockride Ln (south of SE 1) •

  6. FY2017 Annual Budget Public Works Side dewalk lks - $2,179,000 • Projects funded from May 2015 Bond election – Projects for FY 17 include: – Pedestrian signals and curb ramps at existing intersections - $500k • – Williams Drive Corridor & Austin Avenue Old Town Northeast (University–SH 29) - $960k • Austin Avenue (9 th -University) - $178k • Austin Avenue (SH29-FM2243) - $70k (design only) • 8 th Street (Rock-MLK) - $84k • 8 th Street (Church-Myrtle) - $37k • 10 th Street (Main-Rock) - $94k • 11 th Street (Main-Rock) - $151k • Church Street (8 th -9 th ) - $105k •

  7. FY2017 Annual Budget PW-Stormwater Services • Curb and Gutter Replacements – $500,000 annually – Replace deteriorating stand up curbs with new curb and gutter – Proposed for FY 17: Cottonwood, Willow, Parker, Judy, Golden Oaks, 16 th & 17 th Street, Holly, 6 th Street, and Walnut

  8. FY2017 Annual Budget PW-Stormwater Services Infrastructure Improvements - $200,000 • Rehab and repair above and beyond normal maintenance – Drainage Improvement Projects • 18 th & Hutto – $100,000 design only • Identify potential solutions to flooding between 15 th & 19 th Streets, west of Hutto Road • Construction FY 18/19 • 2 nd & Rock Pond – $50,000 design only • Reconstruct poorly functioning water quality pond • Construction FY 18/19 • Serenada Culvert – $50,000 design only • Repair and upsize culverts at multiple crossings • Construction FY 18/19 • Village PID Inlet – $75,000 design and construction • Alley and inlet repairs •

  9. FY2017 Annual Budget PW-Airport Runway Rehab – FY FY 1 19 • $516,000 – Main Runway (18/36) – 4” overlay – 90 TxDOT/10 Airport – Wildlife Hazard • Assessment and Mitigation Plan $12,500 – FAA Recommendation – 90 TxDOT/10 Airport –

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.