PROPERTY OWNERS MEETING SEWER SERVICE CHARGE RATES Emerald Lake Heights Sewer Maintenance District Clifford Elementary School 225 Clifford Avenue Redwood City, CA May 31, 2007 7:00 P.M. County of San Mateo Department of Public Works


slide-1
SLIDE 1

PROPERTY OWNERS MEETING SEWER SERVICE CHARGE RATES

Emerald Lake Heights Sewer Maintenance District

Clifford Elementary School 225 Clifford Avenue Redwood City, CA May 31, 2007 7:00 P.M.

County of San Mateo Department of Public Works

slide-2
SLIDE 2

OVERVI EW OF TONI GHT’S MEETI NG:

  • District Information
  • District Funding
  • Elements of the Sewer Service Charge Rates
  • In District Costs
  • Out of District Costs
  • Minimum Fund Reserve Targets
  • Proposed Rates
  • Rate Setting Timeline
  • Questions and Comments
slide-3
SLIDE 3

FOSMD: Pipes ~ 81 Miles ERU – 12,597 ELHSMD:

Pipes ~ 29 Miles ERU – 1,657

CSCSD:

Pipes ~ 19 Miles ERU – 1,501

BHSMD:

Pipes ~ 7 Miles ERU - 426

DCSD:

Pipes ~ 4 Miles ERU - 293

HI SMD:

Pipes ~ 1 Mile ERU - 234

OKSMD:

Pipes ~ 2 Miles ERU - 118

KSSMD:

Pipes ~ 0.8 Miles ERU - 74

SHCSD:

Pipes ~ 2 Miles ERU - 58

ESMD:

Pipes ~ 0.3 Miles ERU - 18

slide-4
SLIDE 4

DI STRI CT BOUNDARY MAP:

Zone 2 Parcels

Sewage Flows Through City of San Carlos for Zone 1 and Redwood City for Zone 2 to the South Bayside System Authority (SBSA) Treatment Plant in Redwood Shores For Treatment

Redwood Shores Redwood City Woodside Redwood City San Carlos San Carlos Belmont Zone 1 Parcels

slide-5
SLIDE 5

SEWER/ SANI TATI ON DI STRI CTS I N COUNTY GOVERNMENT:

EACH DISTRICT IS AN INDEPENDENT ENTITY WITH ITS OWN SEPARATE BUDGET

  • Each District’s Governing Board is the Board of Supervisors
  • The District receives Sewer Service Charges and limited

property taxes within the District boundaries to fund sewer service

  • The Sewer Service Charges are a Fee For Service, Not a Tax
  • The District collects Sewer Service Charges on the Tax Bill

because it is least costly way to collect the fee

slide-6
SLIDE 6

WHERE DOES MY PROPERTY TAX MONEY GO?

ELHSMD (Zone 1) Sample Property Tax Allocation (TRA 009-033)

Mid Penn ROSD 1.73% County Harbor District 0.33% General County Tax 22.31% Air Quality Mngmnt 0.20% SM Jr. College 6.38% Mosquito Abatement 0.18% County Education Tax 3.33% Sequoia Hospital Dist 1.38% ELHSMD (Zone 1) 1.80% RWC Elem School 22.25% SU High School Dist 14.70% City of RWC Area 1 25.40%

Note: No Property Tax Revenue Allocation for Zone 2 – Formed After Proposition 13

slide-7
SLIDE 7

DI STRI CT SPECI FI C STATI STI CS:

*Age based on District formation date ** Based on 2006-07 SSC Report

District Age (yrs) * Number of Connections ** Equivalent Residential Units ** Downstream Transport Agency Treatment Facility ELHSMD Zone 1 60 191 205 City of San Carlos SBSA ELHSMD Zone 2 24 1,418 1,451 City of Redwood City District Miles of Pipe Percentage in Easements Percentage in Streets ELHSMD Zone 1 2.3 64.5% 35.5% ELHSMD Zone 2 27.6 37.4% 62.6%

slide-8
SLIDE 8

ORGANI ZATI ONAL STRUCTURE OF DI STRI CTS:

BURLINGAME HILLS SMD CRYSTAL SPRINGS CSD DEVONSHIRE CSD EDGEWOOD SMD EMERALD LAKE HEIGHTS SMD FAIR OAKS SMD HARBOR INDUSTRIAL SMD KENSINGTON SQUARE SMD OAK KNOLL SMD SCENIC HEIGHTS CSD UTILITIES-FLOOD CONTROL-WATERSHED PROTECTION SECTION Ann M. Stillman, Principal Civil Engineer DEPARTMENT OF PUBLIC WORKS James C. Porter, Director COUNTY MANAGER'S OFFICE SAN MATEO COUNTY BOARD OF SUPERVISORS

slide-9
SLIDE 9

HOW DOES A SEWER SYSTEM WORK?

Image Source: Pixel-Gym

Each District Relies On Downstream Agencies To Transport The District Collected Sewage To The Treatment Plant

slide-10
SLIDE 10

DI STRI CT EXPENSES:

IN DISTRICT COSTS:

  • Operation and Maintenance
  • Regulation Compliance
  • District Capital Improvement Projects

OUT OF DISTRICT COSTS:

  • Sewage Transport and Treatment
  • Downstream Agency Capital Improvement Projects
slide-11
SLIDE 11

Emerald Lake Heights Sewer Maintenance District (Zone 1) FY 07-08 Proposed Balanced Budget Rate of $880 Per ERU

O&M 32.0% Treatment 28.3% Other Revenue (Tax Revenue & Interest) 18.9% Fund Reserve* 5.2% Regulations 15.6%

* Contributes to Fund Reserve

DI STRI CT EXPENSES:

In District

slide-12
SLIDE 12

Emerald Lake Heights Sewer Maintenance District (Zone 2) FY 07-08 Proposed Balanced Budget Rate of $600 Per ERU

Treatment 69.5% Fund Reserve* 2.1% O&M 15.8% Regulations 7.7% District CIP 4.9%

* Contributes to Fund Reserve

DI STRI CT EXPENSES:

In District

slide-13
SLIDE 13

DI STRI CT EXPENDI TURE COMPARI SON

Emerald Lake Heights Sewer Maintenance District Fiscal Year 2005-06 and 2007-08 Expenditure Comparison

$- $100,000 $200,000 $300,000 $400,000 $500,000 $600,000 $700,000 $800,000 Zone 1 2005-06 Zone 1 2007-08 Zone 2 2005-06 Zone 2 2007-08 Fiscal Year Expenditure ($) Treatment Regulations O&M District CIP

slide-14
SLIDE 14
  • ROUTINE AND PREVENTATIVE MAINTENANCE
  • REPAIR OF DAMAGED PIPES
  • EMERGENCY RESPONSE
  • CUSTOMER ASISTANCE
  • DISTRICT ADMINISTRATION

OPERATI ON AND MAI NTENANCE:

slide-15
SLIDE 15

EMERGENCY RESPONSE 24 HOURS A DAY, 7 DAYS A WEEK

OPERATI ON AND MAI NTENANCE:

Image Source: City of Irving, Texas

slide-16
SLIDE 16

ANTICIPATED EXPENDITURES FOR FUTURE OPERATION & MAINTENANCE BASED ON 5-YEAR HISTORICAL COSTS

  • 4% annual increase for inflation
  • 3% O&M contingency to account for unanticipated expenses

OPERATI ON AND MAI NTENANCE:

slide-17
SLIDE 17

THE DISTRICTS ARE REGULATED BY:

REGULATI ON COMPLI ANCE:

The Regional Water Quality Control Board The State Water Resources Control Board The State Porter-Cologne Act The Federal Clean Water Act

slide-18
SLIDE 18

GOAL TO ELIMINATE SANITARY SEWER OVERFLOWS (SSO)

What is a SSO?

  • Raw Sewage Leaves the Pipe and Flows on the Ground Surface
  • Sewage, if Not Captured, Can Reach Storm Drains, Creeks, Lakes, the

Bay, and Ocean

REGULATI ON COMPLI ANCE:

SSO from Manhole SSO from Manhole Near Creek SSO from Cleanout

slide-19
SLIDE 19

WHAT CAUSES A SSO? Blockages, breaks, and Infiltration & Inflow in the sewer pipe will cause a SSO.

REGULATI ON COMPLI ANCE:

slide-20
SLIDE 20

WHY IS IT IMPORTANT TO ELIMINATE SSOs? UNTREATED SEWAGE IS

A THREAT TO PUBLIC HEALTH, ANIMALS, AND THE ENVIRONMENT.

REGULATI ON COMPLI ANCE:

slide-21
SLIDE 21

WHY I S I T I MPORTANT TO ELI MI NATE SSOs? AGENCIES HAVE

BEEN LEVIED STIFF PENALTIES OR PAID LARGE SETTLEMENTS IN LAWSUITS FOR SSOs.

REGULATI ON COMPLI ANCE:

Notice of Violation & Intent Notice of Violation & Intent to File Suit (60 to File Suit (60-

  • Day Notice)

Day Notice)

Plaintiffs Baykeeper, West County Toxic Coalition Lawyers for Clean Water Environmental Advocates vs. Defendants West County Wastewater District (WCWD) City of Richmond Veolia Water NA Downey Brand LLP

Settlement Agreement Fees Settlement Agreement Fees

WCWD/Richmond/Veolia WCWD/Richmond/Veolia

  • WCA NPDES Effluent Limit Violations
  • SEP Rose Foundation $80,000
  • Attorneys Fees (Plaintiff) $57,000
  • Collection System Settlement Fees
  • Attorneys Fees (Plaintiff) - $538,000
  • Oversight Cost (Plaintiff) - $100,000
  • Attorneys Fees (Defendants) - $300,000
  • Staff Resources/In-house Counsel - $50,000
  • Settlement Agreement was reached in 15 months

Collection System Settlement Agreement Collection System Settlement Agreement

WCWD WCWD

  • Collection System Capital Improvement Program
  • Commit $5M over 10 years
  • System Evaluation and Capacity Assurance Plan (SECAP)
  • Revise within 18 months
  • Update 2015
  • CCTV-Sewer Condition Grading
  • Gravity Sewer Line Cleaning Schedule
  • <12” once every 4 years
  • >12” once every 10 years
  • Design for 5 year-24/hr Storm Event
  • Continue FOG Program - Increase FSE Inspections
  • Attain SSO Reduction Goals

The San Francisco Bay Regional Water Quality Control Board imposed a $516,000 fine to the City of South San Francisco in 2006 for sewer overflows and a $626,000 administrative civil liability to the City and County of San Francisco in an impending order.

Fines!!!

slide-22
SLIDE 22

REGULATI ON COMPLI ANCE: What are the Districts required to do?

Develop Sewer System Management Plans (SSMP) Report all SSOs

slide-23
SLIDE 23

REGULATI ON COMPLI ANCE: Sewer System Management Plan (SSMP) Goals:

Maintaining or improving the condition of collection systems to provide reliable service in the future Cost-effectively minimizing infiltration/inflow (I&I) and providing adequate sewer capacity for wet weather flows Minimizing the number and impact of SSOs

slide-24
SLIDE 24

REGULATI ON COMPLI ANCE:

What are the elements of a SSMP and when do they need to be completed by?

Aug 31 2006

Legal authority for permitting flows into the system, I&I control and enforcement of proper design, installation, testing standards and inspection requirements for new and rehabilitated sewers Measures and activities to maintain the wastewater collection system Design and construction standards Collection system management goals Organization of personnel, chain of command, and communications Overflow emergency response plan Fat, Oils and Grease (FOG) control program

Aug 31 2007

Capacity Management Monitoring plan for SSMP program effectiveness Periodic SSMP Audits, periodic SSMP updates, and implementation of program Communication Program

Aug 31 2008

slide-25
SLIDE 25

REGULATI ON COMPLI ANCE:

What SSMP Elements were factored into the rates?

  • Condition Assessment through Closed Circuit Television Inspection

(CCTV) of pipes

  • 1/6 of system per year
  • Equipment Upgrades

Replacing, upgrading, or purchasing equipment for effective maintenance of sewer system

  • Spot Repairs

Repairing sections of pipe based on CCTV findings Repair 2% of televised pipe system per year

Regulatory Reporting and Requirements

Costs associated with required reporting and SSMP development

slide-26
SLIDE 26

DI STRI CT CAPI TAL I MPROVEMENT PROJECTS (CI P):

High priority CIPs identified in Sewer Master Plans completed in 1999 and 2000

  • Improvements recommended based on
  • Lack of capacity in pipe – Priority 1
  • Excessive maintenance costs – Priority 2
  • Damaged pipes – Priority 3
slide-27
SLIDE 27

DI STRI CT CAPI TAL I MPROVEMENT PROJECTS (CI P):

What was recommended in my District?

District CIP Identified in Sewer Master Plan (Zone 2) Priority Number of Projects Identified Length of Pipe to be Upgraded Estimated Construction Cost Priority 1 – Capacity 2 ~ 2,000’ $415,854 Priority 2 – Maintenance

  • Priority 3 – Structural
  • Totals

2 2,000 ft. * $415,854 **

* CIP Lengths Identified Represent Approximately 1.3% of District’s Total Length of Sewer Mains (153,185 feet).

** Estimated cost includes design, administration, and inspection

slide-28
SLIDE 28

DI STRI CT CAPI TAL I MPROVEMENT PROJECTS (CI P):

Recommended CIP in District (Zone 2):

slide-29
SLIDE 29

DI STRI CT CAPI TAL I MPROVEMENT PROJECTS (CI P):

What projects still need to be completed?

Remaining District CIP (Zone 2) Priority Number of Projects Length of Pipe to be Upgraded Estimated Construction Cost Priority 1 – Capacity 2 ~ 2,000’ $415,854 Priority 2 – Maintenance

  • Priority 3 – Structural
  • Totals

2 2,000 ft. * $415,854 ** * Remaining CIP Lengths Represent Approximately 1.3% of District’s Total Length of Sewer Mains (153,185 feet).

** Estimated cost includes design, administration, and inspection

slide-30
SLIDE 30

DI STRI CT CAPI TAL I MPROVEMENT PROJECTS (CI P):

How were the CIP costs factored into the rates?

Costs for CIPs were spread over 10 years 5% contingency applied for capital work Pipes in Zone 1 are greater than 60 years old Pipes in Zone 2 are greater than 24 years old

slide-31
SLIDE 31

OUT OF DI STRI CT COSTS:

  • Sewage Transport
  • Treatment and Disposal
  • Downstream Agency Capital Improvement

Projects

slide-32
SLIDE 32

SEWAGE TRANSPORT, TREATMENT, AND DISPOSAL:

  • Each District has an Agreement with the

downstream agency for sewage transport, treatment, and disposal

  • Zone 1 of the ELHSMD has an agreement with

the City of San Carlos

  • Zone 2 of the ELHSMD has an agreement with

the City of Redwood City

slide-33
SLIDE 33

SEWAGE TRANSPORT, TREATMENT, AND DISPOSAL:

  • ELHSMD Zone 1 will pay the City of San Carlos:
  • for transporting, treating, and disposing of

sewage from Zone 1

  • an amount equivalent to 85% of the Sewer

Service Charge rate established by the City for the same type of structure in the City What does the Agreement for Zone 1 specify?

slide-34
SLIDE 34

SEWAGE TRANSPORT, TREATMENT, AND DISPOSAL:

Payments to San Carlos include reimbursing the City for the use of their sewer system, operation and maintenance costs associated with the usage, and capital improvement projects on the City’s system

  • San Carlos’ 2006-07 SSC is $359
  • The City is raising their rates by 64% over 3 yrs
  • The City increased their rates by 30% this year

(2006-07)

  • The City’s rates will increase by 22% in the 2007-08

fiscal year and 12% in the 2008-09 fiscal year

slide-35
SLIDE 35

SEWAGE TRANSPORT, TREATMENT, AND DISPOSAL:

  • ELHSMD Zone 2 will pay the City of Redwood City:

What does the Agreement for Zone 2 specify?

  • for transporting, treating, and disposing of

sewage from Zone 2

  • an equivalent amount to the Sewer Service

Charge rate established by the City for the same type of structure in the City

slide-36
SLIDE 36

SEWAGE TRANSPORT, TREATMENT, AND DISPOSAL:

Payments to Redwood City include reimbursing the City for the use of their sewer system and the

  • peration and maintenance costs associated with the

usage

  • The 2006-07 SSC average rate in Redwood City is

$396

  • The City increased their rates by 26% this year

(2006-07)

  • The City is planning to increase their rates for the

2007-08 fiscal year to $428

slide-37
SLIDE 37

SEWAGE TRANSPORT, TREATMENT, AND DISPOSAL:

  • Sewer service charge rates established by the

Cities

  • Capital Improvement Projects at the South Bayside

System Authority (SBSA) Treatment Plant

What affects the amount the District pays the Cities?

  • SBSA is planning capital improvements worth multi-

million dollars

  • The capital improvements will replace equipment

which have reached the end of their useful lives

  • SBSA will be charging the member agencies

(Redwood City, San Carlos, Belmont, and West Bay Sanitary District) for the improvements

slide-38
SLIDE 38

SEWAGE TREATMENT AND DISPOSAL PROCESS

SERVI CES PROVI DED BY DI STRI CTS:

Image Source: SBSA

slide-39
SLIDE 39

SEWAGE TRANSPORT, TREATMENT, AND DISPOSAL:

A portion of the SSC rates were calculated to pay for transport, treatment, and disposal and anticipated increases in treatment costs and downstream capital improvements

  • Based on information from downstream

agencies or projected increases based on historical data

  • 3% contingency applied
slide-40
SLIDE 40

MINIMUM FUND RESERVE TARGETS:

50% of Operations and Maintenance Costs (6 mo.) and 3% of the replacement value (Best Management Practices)

  • r $100,000 for small districts

*Replacement value includes construction costs only

District Replacement Value * Minimum Fund Reserve Target Emerald Lake Heights Sewer Maintenance District $17,038,400 $898,000

slide-41
SLIDE 41

PROPOSED RATES:

  • SSC Rates determined to meet anticipated

expenditures immediately

Balanced Budget Phased Increase

  • SSC Rates determined to steadily increase to meet

future expenditures

  • Phased Increase may rely on Fund Reserve to meet

future expenditures

slide-42
SLIDE 42

PROPOSED RATES:

Sewer Service Charge Rate ($/Year Per Residential Unit) Proposed Rates 2006-07 2007-08 2008-09 2009-10 2010-11 2011-12 ELHSMD (Zone 1) Balanced Budget $629 $880 $930 $980 $1,040 $1,120 Phased Increase $750 $900 $1,050 $1,100 $1,130 ELHSMD (Zone 2) Balanced Budget $428 $600 $650 $700 $750 $810 Phased Increase $550 $670 $750 $770 $810

slide-43
SLIDE 43

SSC vs FUND RESERVE:

Emerald Lake Heights Sewer Maintenance District Sewer Service Charge Options and Beginning FY Fund Reserve

$1,199,000 $1,001,364 $1,051,506

$500,000 $600,000 $700,000 $800,000 $900,000 $1,000,000 $1,100,000 $1,200,000 2006-07 2007-08 2008-09 2009-10 2010-11 2011-12 2012-13 Fiscal Year Fund Reserve ($) $400 $500 $600 $700 $800 $900 $1,000 $1,100 $1,200 Sewer Service Charge Rate ($) Balanced SSC - Zone2 Phased SSC - Zone 2 Fund Reserve (Balanced) Fund Reserve (Phased) Min Target Fund Reserve Phased SSC - Zone 1 Balanced SSC - Zone 1

slide-44
SLIDE 44

RATE SETTING PROCESS:

Key Dates Actions May 2, 2007 Sent all property owners information about sewer systems and what their sewer service charge pays for. Early/Mid May Sent all property owners information about proposed rates and timing

  • f meetings with property owners.

May 15 District staff provided Board with status update on proposed sewer service charge rates and received approval of proposed process and elements of the rates. Mid/End of May Meetings with property owners of each district to discuss the proposed rates, factors involved in establishing rates, and seek property owner input. June 5 Introduce Ordinance with proposed sewer service rates for 2007-08 through 2011-2012 fiscal years and set Public Hearing for July 24 at 9:15am. June 8 Send Prop 218 notice (45 days prior to public hearing) to property

  • wners with proposed rates.

July 24 Hold public hearing, adopt Ordinance setting rates, and adopt 2007-08 Sewer Service Charges Report based on the adopted rates.

slide-45
SLIDE 45

QUESTIONS & INPUT

District Services Rate Development Rate Adoption Process and Schedule Others

slide-46
SLIDE 46

CONTACT INFORMATION

Please e-mail your comments and questions to: sewers@co.sanmateo.ca.us Information is available on our website at: http://www.co.sanmateo.ca.us/sewers