Projec ject t ID: S216 16-401R 401R E.92nd St Street Marin ine Transfe sfer r St Statio ion (MTS TS) Ra Ramp Over r FDR R Dri rive Borough gh of Manhat hattan tan Communi mmunity ty Board No. 8 Sch chemat ematic ic Design


slide-1
SLIDE 1

Projec ject t ID: S216 16-401R 401R

E.92nd St Street Marin ine Transfe sfer r St Statio ion (MTS TS) Ra Ramp Over r FDR R Dri rive Borough gh of Manhat hattan tan

Communi mmunity ty Board No. 8

Sch

chemat ematic ic Design gn Prese sentati ntation

  • n

Communi mmunity ty Board 8 8 M

Jun une e 06, , 2018 018

1

slide-2
SLIDE 2

2

Agenda:

  • Project Outline
  • Tasks Completed
  • Preferred Alignment
  • Impact on E92nd St. Entrance Ramp
  • Feedback/Support
  • Next Steps
slide-3
SLIDE 3

3

Project Location

Project Location Aerial View

slide-4
SLIDE 4

4

Existing Conditions

Asphalt Green Building

  • E. 91st Street

MTS Ramp DeKovats Playground Entrance Ramp to S/B FDR

slide-5
SLIDE 5

5

Preferred Alignment – Southbound FDR Dr.

slide-6
SLIDE 6

6

Requires:

  • Modification of E92nd

St Entrance Ramp to S/B FDR Drive

  • No Build Traffic

Analysis - Active

  • Slight Reconfiguration
  • f FDR Drive Lanes
  • DOT Approved in

Principle

Preferred Alignment

slide-7
SLIDE 7

7

Tasks Completed:

  • Design Contract Procured/NTP
  • Topographic Survey/Utility Survey
  • Tree Survey – Assessment
  • Sub-surface Investigation/Test Pits
  • Traffic Data Collection
slide-8
SLIDE 8

8

Tasks Completed:

  • Schematic Design
  • Approved in Principle by DOT
  • Vertical Clearance 12’-6”
  • Approved by DOT
slide-9
SLIDE 9

9

Tasks in Progress:

  • Traffic Data Analysis
  • Maintenance & Protection of

Traffic

  • Geometric Design Drawings
  • Structural Design Computations
  • Drawings and Details
slide-10
SLIDE 10

10

Next Steps:

  • Schematic Design Approval
  • Proceed to Preliminary Design
  • Community Board Support Letter
  • Present to Public Design

Commission – Preliminary Approval

slide-11
SLIDE 11

11

Next Steps:

Milestone 1: Final Design 04/30/2019 Milestone 2: Proposed Bid Date 06/30/2019 Milestone 3: Proposed Construction Start 03/31/2020 Milestone 4: Substantial Completion Date 12/31/2022