Projec ject t ID: S216 16-401R 401R E.92nd St Street Marin ine Transfe sfer r St Statio ion (MTS TS) Ra Ramp Over r FDR R Dri rive Borough gh of Manhat hattan tan Communi mmunity ty Board No. 8 Sch chemat ematic ic Design


  1. Projec ject t ID: S216 16-401R 401R E.92nd St Street Marin ine Transfe sfer r St Statio ion (MTS TS) Ra Ramp Over r FDR R Dri rive Borough gh of Manhat hattan tan Communi mmunity ty Board No. 8 Sch chemat ematic ic Design gn Prese sentati ntation on Communi mmunity ty Board 8 8 M Jun une e 06, , 2018 018 1

  2. Agenda: • Project Outline • Tasks Completed • Preferred Alignment • Impact on E92nd St. Entrance Ramp • Feedback/Support • Next Steps 2

  3. Project Location Project Location Aerial View 3

  4. Existing Conditions Asphalt Green Building E. 91 st Street MTS Ramp DeKovats Playground Entrance Ramp to S/B FDR 4

  5. Preferred Alignment – Southbound FDR Dr. 5

  6. Requires: Preferred Alignment • Modification of E92 nd St Entrance Ramp to S/B FDR Drive  No Build Traffic Analysis - Active • Slight Reconfiguration of FDR Drive Lanes • DOT Approved in Principle 6

  7. Tasks Completed: • Design Contract Procured/NTP • Topographic Survey/Utility Survey • Tree Survey – Assessment • Sub-surface Investigation/Test Pits • Traffic Data Collection 7

  8. Tasks Completed: • Schematic Design • Approved in Principle by DOT • Vertical Clearance 12’ - 6” • Approved by DOT 8

  9. Tasks in Progress: • Traffic Data Analysis • Maintenance & Protection of Traffic • Geometric Design Drawings • Structural Design Computations • Drawings and Details 9

  10. Next Steps: • Schematic Design Approval • Proceed to Preliminary Design • Community Board Support Letter • Present to Public Design Commission – Preliminary Approval 10

  11. Next Steps: Milestone 1: Final Design 04/30/2019 Milestone 2: Proposed Bid Date 06/30/2019 Milestone 3: Proposed Construction Start 03/31/2020 Milestone 4: Substantial Completion Date 12/31/2022 11

  12. Thank You 12

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.