Private Provider RFP UPDATE February 27, 2017 1 Executive Summary - PowerPoint PPT Presentation

Private Provider RFP UPDATE February 27, 2017 1 Executive Summary Providers submitting proposals: 6 Charter met financial threshold requirements Proposal for six towns Requests additional funding for 3 towns Requires all


  1. Private Provider RFP UPDATE February 27, 2017 1

  2. Executive Summary Providers submitting proposals: 6 Charter – met financial threshold requirements • Proposal for six towns • Requests additional funding for 3 towns • Requires all selected towns to participate Comcast – met financial threshold requirements • Proposal for 4 towns; 3 towns non-severable; Princeton bid separately; 2 towns overlap with Charter; • Requests significant additional funding for all 4 towns • Choosing Charter over Comcast could mean two towns could be excluded Mid-Hudson – did not meet minimum financial requirements • MBI needs to understand Mid- Hudson’s strategy for selecting the one town they picked Crocker – did not meet minimum financial requirements • Proposal is for 38 towns: requires 50% take rate / cover 70% of town at $2000 per subscriber requires 75% take rate / cover 96% of town at $3000 per subscriber Fiber Connect – did not meet minimum financial requirements • Proposal to serve 8 towns; backed by private equity investor Westfield Gas & Electric • Offered to be involved as a Network Operator 2

  3. Charter • Meets minimum threshold criteria. Reduced long-term operational risk for towns. • Tech: Hybrid Fiber-Coaxial Cable • All six towns non-severable • ~2.5 years to complete • 60m/4m for $59.99 to 100m/4m for $124.99, Triple Play available Requested Grant Funding Proposed Coverage Additional Funding Municipality MBI Construction Requested % of Total Premises Allocation Egremont $660,000 $303,276 96% of 920 Monterey $680,000 $613,150 96% of 874 New Salem $400,000 $547,239 96% of 464 Hancock $480,000 $0 96% of 682 Princeton $910,000 $0 100% of 1,325 Shutesbury $510,000 $0 96% of 845 Total $3,640,000 $1,463,665 3

  4. Comcast • Meets minimum threshold criteria. Reduced long-term operational risk for towns. • Tech: Hybrid Fiber-Coaxial Cable • 3 towns non-severable. Princeton bid separately. • Construction schedule not specified • 10m/2m for $49.95* to 200m/20m for $87.95, Triple Play available Requested Grant Proposed Coverage Funding Additional Funding Municipality Requested % of Total Premises MBI Construction Allocation Goshen $450,000 $1,010,000 96% of 585 Montgomery $300,000 $725,000 96% of 360 Princeton $910,000 $640,000 100% of 1,344 ** Shutesbury $510,000 $1,145,000 96% of 845 Total $2,170,000 $3,520,000 *Also provides an offering of 10 Mbps/1 Mbps service for $9.95/month to families with a child eligible for National School Lunch Program. **Based on Comcast’s own data collected from a physical walk -out within the Town. 4

  5. Mid-Hudson Data Corp. • Below minimum threshold criteria • One town – Tyringham • Tech: Fiber (91%), Fixed Wireless (6%) • 10 – 12 months to complete • 25m/5m for $89.95 to 100m/20m for $199.90*, no video Requested Grant Funding Proposed Coverage Additional Funding Municipality MBI Construction Requested % of Total Premises Allocation Tyringham $260,000 $71,500 ** 97% of 308 Total $260,000 $71,500 ** *Will offer three separate speed packages available to wireless subscribers ranging from 10mb to 24mb download. Prices for wireless packages not specified. **Estimated cost to town for building of 1.4 miles of infrastructure to link Main St. to Goose Pond via fiber optic cabling. Estimate includes installation of 30 -35 ft. utility poles, installation of anchors with downguys, and placement of 1.4 miles of strand. 5

  6. Crocker • Below minimum threshold criteria • Tech: Fiber • Request MBI grant funding of $18.33M • 70% coverage: w/ 50% presubscription & $2K contribution per subscriber • 96% coverage: w/ 75% presubscription & $3K contribution per subscriber • Single tier internet $85/ month, no video Requested Grant Funding Proposed Coverage Additional Funding Municipalities MBI Construction Requested % of Total Premises Allocation 38 Towns 70% of 21,201 $18,330,000 $22,869,000 * 38 Towns 96% of 21,201 $18,330,000 $51,455,250 ** *Shows projected total additional funding for 38 towns if 50% presubscription threshold is reached with $2K contribution from each subscriber. **Shows projected total additional funding for 38 towns if 75% presubscription threshold is reached with $3K contribution from each subscriber. 6

  7. Fiber Connect • Below minimum threshold criteria. New purpose LLC – Established in 2015. No financial information shared. • Backed by private equity investor in software, communications, and storage sectors. Partner at Bessemer’s Venture. • Two proposals: 2 towns (Monterey and Egremont); 6 towns (Alford, Becket, New Marlborough, Otis, Tolland, Tyringham) Requested Grant Funding Proposed Coverage Additional Funding Municipality MBI Construction Requested % of Total Premises Allocation Monterey * $680,000 $585,000 98% of 798 Egremont * $660,000 $100,000 98% of 922 Alfrod $270,000 $468,000 96% of 342 Becket $1,290,000 $3,132,000 96% of 1,823 New Marlborough $920,000 $2,384,000 96% of 1,086 Otis $1,080,000 $1,680,000 96% of 1,687 *Fiber Connect has begun Tolland $430,000 $964,000 96% of 537 Make-Ready work in Monterey Tyringham $260,000 $536,000 96% of 308 and Egremont. Total $5,590,000 $9,849,000 7

  8. Westfield Gas & Electric • Willing to work with any unserved town under municipal ownership model • Proposed Services: - Design and engineering - Procurement - Project management - Network operation • Did not request specific funding under this procurement 8

  9. Communications Plan Brief Governor's Office 1/19/2017 Brief Western MA Legislative Delegation 1/20/2017 Post Private Provider Submissions 1/23/2017 MBI Community Liaison and PM’s Engage Towns w/ Viable 1/23/2017 – 3/21/2017 Path to Discuss Options w/ Selectboard Member Public Open Meeting In Western MA 2/16/2017 Brief MBI Board of Directors – Town Preference & PP RFP 2/27/2017 Towns Selectboards Must Notify MBI to Opt out or Opt in to the MBI Private Providers Offering – Recommend a Friday 3/24/2017 Select board vote following a public meeting or Town meeting vote Issue Final Recommendations to MBI Board 3/28/2017 9

  10. Map of Towns by Provider 10

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.