Presentation Tunnelbanan Teknik AB April 2011 Tunnelbanan Teknik AB - - PowerPoint PPT Presentation

presentation tunnelbanan teknik ab april 2011 tunnelbanan
SMART_READER_LITE
LIVE PREVIEW

Presentation Tunnelbanan Teknik AB April 2011 Tunnelbanan Teknik AB - - PowerPoint PPT Presentation

Presentation Tunnelbanan Teknik AB April 2011 Tunnelbanan Teknik AB - Company information Company: Tunnelbanan Teknik Stockholm AB Address : Garagevgen 18G - 121 48 Johanneshov Box 10038 121 26 Stockholm Globen Postal address: No of


slide-1
SLIDE 1

Presentation Tunnelbanan Teknik AB April 2011

slide-2
SLIDE 2

Company: Tunnelbanan Teknik Stockholm AB Address : Garagevägen 18G - 121 48 Johanneshov Postal address: Box 10038 – 121 26 Stockholm Globen No of employees: appr. 400 Tlpf: 08 578 62000 Internet: www.tbtstockholm.se Mail: n.n@tbtstockholm.se Chairman of the Board: Jeremy Long CEO: Tor Henriksen Founded 2009

  • Org. no:

556762-7160 Share capital 100 MNOK Ownerse MTR Stockholm AB 50% - Mantena AS 50% Auditors KPMG Bank: 123456 Swedbank

Tunnelbanan Teknik AB - Company information

slide-3
SLIDE 3

Medarbetare Supplies and clients

  • MTR Stockholm AB – Maintenance contract for the Stockholm Metro.
  • MTR Stockholm AB – Projects
  • SL – Modifications.
  • Veolia – Alstom etc. Repairs and components
  • Suppliers of new trains – Commisiioning support and gurantee works
  • Suppliers of projects to SL – Installations in trains
  • Repaior of elektronic components

No of employees:

  • Appr. 400

Workshops and depots:

  • Hammarby - Componens, repairs, projects, store, purchase, head office
  • Vällingby – Traffic maintenance
  • Nyboda – Traffic maintenance
  • Rissne –

Traffic maintenance

  • Högdalen – Traffic maintenance plus component repairs

Tunnelbanan Teknik AB - Company information

slide-4
SLIDE 4

Medarbetare

Underhållskontraktet med MTR

Supply To supply the required trains for traffic, maintained and cleaned. Total responsibility, light and heavy maintenance and improvements Collission repairs, vandalisme, projects Contrakt period: 8 years plus 6 year option. Start of operation 2/11-2009 Trains for traffic: 271 stk (3 car-trains) Type C20 - Supplied by Bombarider (1997-2004) 264 cars Type CX - Supplied by Bombarider (1970-1890) Volume:

  • Appr. 12 mill train kilometer pr year.
slide-5
SLIDE 5

Tunnelbanan Teknik AB

Medarbetare 50% Mantena AS (Norge) 50% MTR Stockholm AB “Best practice” from the two

  • wners

MTR Hong Kongs unique processes and methods modified for Scandinavic conditions

slide-6
SLIDE 6

Medarbetare

Some main challenges in the contract

– Cleaning quality, INSTA standard. – Less stops due to train failures – Less trains out of traffic – Lowered costs – increased performance

slide-7
SLIDE 7

Medarbetar

Tunnelbanan Teknik - MTRS

– Unique processes for continous improvements – IT tools and methods for failure reporting and analyses

slide-8
SLIDE 8

TBT organisation

CEO Tor Henriksen Quality, Safety, Environment Jan Lindström Finance Arne Petterson Personal Personalchef Inge Asplund Maintenance Tomm Bråten Tchnical support Cultural changes, procedures Purchasing cooperation MANTENA – MTR HK Projects Petter Karlsson Planning

Marcus Papinski

Purchasing

Jan Nilsson

Teknichal department

Anders Forssblad

Store

Patrick Zetterström

Högdalen

Johan Klint

Rissne

Patric Jansson

Vällingby

Karl-Erik Arvidsson

Nyboda

Gustav Sjöberg

Hammarby

Benjamin Schaub

slide-9
SLIDE 9

Högdalen Depot

Parking Cleaning –vandalism repair Depot

slide-10
SLIDE 10

Medarbetare

FUTURE DEVELOPMENT 1

General With different contractors and contracts, SL has the coordination challenges SL want to reduce such problems and risks, example: Snow removal MTRS and TBT want to have control of own supply chain to provide best service Supplyers of projects to SL Installations in trains needs a lot of coordination to avoid implications for traffic, maintenance and cleaning For TBT, installations in trains may give better use of personell and we can improve logistics. All parties may benefit from a good cooperation

slide-11
SLIDE 11

Medarbetare

FUTURE DEVELOPMENT 2

Supplyers of new trains to SL TBT has excess areas in Hammarby, can be used for commissioning, testing or warranty works. Commissioning assistance in combination with education Services regarding guarantee works ? Guarantee work in combination with the daily maintenance

slide-12
SLIDE 12

Medarbetare

FUTURE DEVELOPMENT 3

Components and system responsibilities The past: Train maintainers did everything themselves The future:

  • Outscourcing.Let the experts do what they can best.

Challenges: Not an additional mark up only. Added value.

  • System responsibility.
  • Split the trains in systems. Like doors. HVAC. brake systems.
  • Total responsibility, cost pr year or pr km. Continous improvements. New

technology, new components

  • Train suppliers
  • Strategy? - Compete with the maintenance experts? Spare part supplies?
  • Alternative strategy? - Improve train performance? Continous updating to

new technology? Life extension?