Pre-Proposal Meeting for New County Office Building At San Mateo - - PowerPoint PPT Presentation

pre proposal meeting for new county office building at
SMART_READER_LITE
LIVE PREVIEW

Pre-Proposal Meeting for New County Office Building At San Mateo - - PowerPoint PPT Presentation

Pre-Proposal Meeting for New County Office Building At San Mateo County Government Center Redwood City Agenda 1. Introduction i. PDU Team ii. A/E Proposer Teams 2. Project Vision: Mike Callagy + Debbie Bazan 3. Project Overview 4. Q&A


slide-1
SLIDE 1
slide-2
SLIDE 2

Pre-Proposal Meeting for New County Office Building At San Mateo County Government Center Redwood City

slide-3
SLIDE 3
  • 1. Introduction

i. PDU Team

  • ii. A/E Proposer Teams
  • 2. Project Vision: Mike Callagy + Debbie Bazan
  • 3. Project Overview
  • 4. Q&A

Agenda

slide-4
SLIDE 4

Project Overview

  • 1. CM at Risk – CM/GC will be selected during early design.

Architect to assist in procurement and GMP.

  • 2. Zero Net Energy and LEED certification
  • 3. Estimated construction cost (including interior T.I.) is
  • approx. $65-80M (121k-156k GSF).
  • 4. Schedule:

i. Design phase tentatively starts – November 2017 ii. Construction completion around – Q4/2020.

  • 5. A/E Team – include proposed sub-consultants in fees.

The County reserves the right to alter any sub- consultants.

slide-5
SLIDE 5

Project Overview - Site

Proposed New Parking Proposed New COB3 Parking Garage Hall of Justice COB1 COB2 Future ROC (under construction) Law Library Childcare Center

slide-6
SLIDE 6

Project Overview - Scope

A/E Design Scope:

  • New County Office Building
  • Public Promenade & Plaza connecting new & existing buildings at Government Center
  • Coordination of vehicular and pedestrian traffic in/out of new Parking Structure
  • Consideration for the location for site renewable resources to achieve Zero Net Energy

Legend A Law Library B Proposed New COB3 C History Museum D Hall of Justice E Lathrop House G COB1 H Future ROC (Under Construction) I COB2 J Existing Parking L Proposed New Parking

Public Promenade Public Plaza

slide-7
SLIDE 7

Legend A Law Library B Credit Union C History Museum D Hall of Justice E Lathrop House F Traffic Court G COB1 H Future ROC (Under Construction) I COB2 J Existing Parking Existing public walkway Demolish Relocate TBD

X ?

New COB3

New Parking Structure

Project Overview – Site Preparation

Site Plan – Existing Condition

slide-8
SLIDE 8

Questions?

slide-9
SLIDE 9

Thank you!

Proposals due October 16, 2017 at 2:30pm PST

Project Contact: Sam Lin, Manager County of San Mateo Project Development Unit 1402 Maple Street Redwood City, CA 94063 Email: slin@smcgov.org Project Website: http://cmo.smcgov.org/cob3-documents

slide-10
SLIDE 10