Manchester Tank Coating Project RFP No. 912 Pre Pre-Proposal Proposal Meeting Meeting August 20, 2014 August 20, 2014 Agenda Project Objectives Project Objectives Background Background Highlights of Other Project


  1. Manchester Tank Coating Project RFP No. 912 Pre Pre-Proposal Proposal Meeting Meeting August 20, 2014 August 20, 2014

  2. Agenda � Project Objectives Project Objectives � � Background Background � � Highlights of Other Project Components � Highlights of Other Project Components Highlights of Other Project Components Highlights of Other Project Components � � � Proposal Requirements Proposal Requirements � � � Q&A/Site Visit Q&A/Site Visit

  3. Primary Project Objectives � Design, Bidding and Construction Phase Services � Design, Bidding and Construction Phase Services � � Repainting of the Elevated Storage Tank Repainting of the Elevated Storage Tank � Exterior Exterior � � Dry Interior Dry Interior � � � Design additional miscellaneous improvements Design additional miscellaneous improvements � � Execute Public Engagement Plan and incorporate Execute Public Engagement Plan and incorporate Public Art Public Art

  4. Background Information � 500,000 Gallon � 500,000 Gallon Elevated Storage Tank Elevated Storage Tank � � Welded steel spheroid Welded steel spheroid � � Constructed in 1959 Constructed in 1959 by CBI by CBI � � Located near � Located near � Located near Located near residential homes and residential homes and businesses businesses � Approximately 148 Approximately 148 � feet tall feet tall � � Existing coating Existing coating contains lead contains lead-based based paint paint

  5. Work Plan Components � � A. Study/Design Phase A. Study/Design Phase � Kick off Meeting/Workshop with Plant Staff Kick off Meeting/Workshop with Plant Staff � � Finalize list of desired improvements Finalize list of desired improvements � � Perform lead Perform lead-based paint testing and develop abatement based paint testing and develop abatement � plan plan plan plan � Evaluate the presence of mill scale Evaluate the presence of mill scale � � Coordinate with Telecom Companies (six) and Coordinate with Telecom Companies (six) and � incorporate their requirements incorporate their requirements � Develop and execute public engagement plan and work Develop and execute public engagement plan and work � with City Art Coordinator with City Art Coordinator

  6. Work Plan Components � A. Study/Design Phase (continued) � A. Study/Design Phase (continued) � Finalize list of desired improvements to be designed Finalize list of desired improvements to be designed � � Safety features such as handrails Safety features such as handrails � � Mechanical stop for the top hatch Mechanical stop for the top hatch � � Typical steel repairs that may be required � Typical steel repairs that may be required Typical steel repairs that may be required Typical steel repairs that may be required � � � Deck covering the sump pit Deck covering the sump pit � � Lighting improvements Lighting improvements � � Investigation of Investigation of cathotic cathotic protection protection � � Piping / bolt repairs Piping / bolt repairs � � Sump Pump evaluation and replacement Sump Pump evaluation and replacement � � Refer to RFP for additional details Refer to RFP for additional details �

  7. Exterior Corrosion

  8. Riser Pipe Condition

  9. Sump Pit Platform Replacement

  10. Telecom Companies

  11. Site Protection

  12. Possible Instrumentation Improvements

  13. Work Plan Components � � B. Bidding and Construction Phases B. Bidding and Construction Phases � Refer to RFP for details Refer to RFP for details � � Bid Phase Assistance Bid Phase Assistance � � Construction Administration Construction Administration � � Construction Observation and Testing � Construction Observation and Testing Construction Observation and Testing Construction Observation and Testing � � � Containment, Regulated Waste, SSPC, Containment, Regulated Waste, SSPC, � Environmental Conditions, DFT, Holiday testing Environmental Conditions, DFT, Holiday testing � Testing company part of the Consultant’s team Testing company part of the Consultant’s team � � Coordinate final bacteriological testing Coordinate final bacteriological testing � � Coordinate with Telecom Companies Coordinate with Telecom Companies �

  14. Assumptions � Identify all assumptions in proposal that Identify all assumptions in proposal that � could impact fee could impact fee � Public Engagement � Public Engagement Public Engagement Public Engagement � � � Work with Art Coordinator/Public Art Work with Art Coordinator/Public Art � � � Include in proposal a table that identifies Include in proposal a table that identifies LOE for City staff by Task LOE for City staff by Task � Identify any resources or tasks that Identify any resources or tasks that � Consultant expects from City Consultant expects from City

  15. Proposal Requirements/Evaluation � Organize proposal by Sections A � Organize proposal by Sections A - F outlined in F outlined in Section 3 of the RFP Section 3 of the RFP � � Complete Contract Compliance, Living Wage and Complete Contract Compliance, Living Wage and Conflict of Interest Forms and submit with Conflict of Interest Forms and submit with Proposal Proposal � 40 pages total (20 sheets double sided including 40 pages total (20 sheets double sided including � resumes but not including required forms) resumes but not including required forms) � Submit original plus 3 copies (include RFP Submit original plus 3 copies (include RFP � number on envelope) number on envelope) � � Proposal will be evaluated by the criteria Proposal will be evaluated by the criteria identified in Section 3 of the RFP identified in Section 3 of the RFP � � Fees submitted in separate sealed envelope Fees submitted in separate sealed envelope

  16. Timeline of Events � Proposals due to Procurement Unit (c/o Customer � Proposals due to Procurement Unit (c/o Customer Service Department 1st floor, City Hall) by 2 PM, Service Department 1st floor, City Hall) by 2 PM, September 2, 2014 September 2, 2014 � � Interviews will be used at the discretion of the Interviews will be used at the discretion of the City – Tentatively Scheduled for week of City City – Tentatively Scheduled for week of City Tentatively Scheduled for week of Tentatively Scheduled for week of September 15, 2014 September 15, 2014 � Notice of Award anticipated Nov./Dec. 2014 Notice of Award anticipated Nov./Dec. 2014 � � Notice to Proceed anticipated approx Jan. 2015 Notice to Proceed anticipated approx Jan. 2015 � � Construction Phase to avoid the high demand Construction Phase to avoid the high demand � summer months summer months � � Detailed proposed schedule from Proposers Detailed proposed schedule from Proposers

  17. ? Questions and Answers ? Questions that arise during proposal period will be handled as follows: � � Ask today after this presentation � � Ask today after this presentation Ask today after this presentation Ask today after this presentation � � Email to: Email to: gwiczorek@a2gov.org gwiczorek@a2gov.org � � Questions due before Monday August 25, Questions due before Monday August 25, 2014 by 5:00pm 2014 by 5:00pm

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.

Recommend


More recommend