D i a g n o s t i c s • V a c c i n e s • C o u n t e r m e a s u r e s Pre-Bid Conference for GMP #3 Bid Package #2 Main Lab and Outbuildings August 21 and 22, 2013 D e f e n d i n g A m e r i c a A g a i n s t F o r e i g n A n i m a l D i s e a s e s
������������������� • Location of Fire Exits • Please Silence all cell phones • This presentation will be posted to the McMjv.com website • There will be time at the end for Questions – All technical questions to be per PDC (RFI) process • McM Work Category Leads will be available after the presentation • Please use time after the session for Networking • Jobsite Walkthrough at 1:30 following this afternoon
������ • Overview of Team • Project Overview • Schedule • GMP #3 Scope • Additional Subcontractor Conditions • Request for Information • FOUO Requirements • Bid Day
����������� ����� McCarthy / Mortenson (McM) Personnel Jon Jacobsmeyer – Project Executive Mark Heit – Procurement Director Mark Duda – Preconstruction Director Rick Licari – Concrete Ray Elking – Structural Steel and Exteriors Walter Beckman – Interiors & General Works Dan Oneal – Sitework and Water Treatment
����������� ����� NBAF Design Partnership (NDP) Personnel Perkins & Will – BSL Laboratory Architect Flad & Associates – Large Animal Architect / Structural Engineer Haynes-Whaley – Structural Engineer Travis Pruitt – Civil Engineer Terracon Consultants, Inc. – Environmental & Geotech Consultant Merrick & Company – Large Animal MEP Engineer Associated Engineers, Inc. – BSL Laboratory MEP Engineer ccrd Partners – BSL-4 MEP Engineer
����������� ����� DHS Key Personnel – NBAF Project Team Danny Hager – Chief, Bio-Containment Procurement Branch Jason Gerloff – Contracting Officer Robert Driggers – Contracting Officer Tim Barr – Site Manager Eugene Cole – Contracting Officer’s Technical Representative Tom Wilkinson – Contracting Officer’s Technical Representative
���������������� NBAF Mission Drivers • Construction of a BSL-4 large animal facility is critical to protecting the nations food supply, agriculture and public safety. • U.S. currently has no such capacity for large livestock research and is dependent upon the limited use of facilities in Canada and Australia. • The National Academies of Science has unequivocally stated in two recent reports that it is “imperative” that the U.S. have BSL-4 capability. • Current facility, Plum Island Animal Disease Center (PIADC) is 58 years old and at the end of its life cycle. – Limited research capability and no BSL-4 capability – Recapitalization would exceed $620M and still not provide BSL-4 capability
���������������� ���������
����������������
����������������
����������������
����������������
���������������� Main Laboratory Building
����������������
����������������
����������������
���������������� Transshipping Building
���������������� Visitor Center
���������������� Visitor Center
���������������� Entry Control Point – West Entry Control Point – North
���������������� Water Treatment
���������� ����� Overall Project Milestones • March 07, 2013 Start of Construction GMP #2 – Central Utility Plant • July 16 & 23, 2013 Small Business Outreach Sessions • August 13, 2013 GMP #3 – Main Lab and Outbuildings Bid Package Released • August 21, 22, 2013 Pre-Bid Conferences • September 13, 2013 GMP #3 Main Lab and Outbuildings Early Proposals Due • October 04, 2013 GMP #3 Main Lab and Outbuildings Remaining Proposals Due 4 th Quarter 2013 • Post-Bid Interviews
!"��#$�% "��������� Overall Project Milestones 2 nd Quarter 2014 • Award of and Start of GMP #3 Construction 4 th Quarter 2015 • GMP #2 (CUP) Construction Complete 4 th Quarter 2019 • GMP #3 – Main Lab and Outbuildings Substantial Completion 2 nd Quarter 2020 • Commissioning Complete 3 rd Quarter 2020 • Owner Move-In, Operational Facility
!"��#$��������������� Main Lab and Outbuildings Work Categories • WC 100 APR Doors & Windows • WC 101 Sterilizers • WC 102 Incinerators • WC 103 Tissue Autoclaves • WC 104 Liquid Decontamination System • WC 105 Earthwork • WC 106 Site Utilities • WC 107 Foundations/Structural Concrete (McM Self Perform) —WC 107-A Structural Excavation —WC 107-B Drilled Piers —WC 107-C Waterproofing —WC 107-D Reinforcing Steel —WC 107-E Not Used —WC 107-F Ready Mix Concrete – Furnish Only —WC 107-G Flatwork (Place and Finish) —WC 107-H Underslab Drainage
!"��#$��������������� Main Lab and Outbuildings Work Categories • WC 108 Structural Steel • WC 109 Structural Steel Grillage & Impact Wall • WC 110 Masonry • WC 111 Furniture – Bid in Future Package • WC 112 Site Logistics (McM Self-Perform) • WC 113 Metal Studs, Drywall & Plaster • WC 114 General Works • WC 115 Metal Panels and Sheet Metal • WC 116 Roofing • WC 117 Fireproofing • WC 118 Missile and Tornado Resistive Doors • WC 119 Glass and Glazing • WC 120 Interior Glazing • WC 121 Acoustical Finishes • WC 122 High Containment Coatings • WC 123 Laboratory and Containable Coatings
!"��#$��������������� Main Lab and Outbuildings Work Categories • WC 124 Interior and Exterior Painting • WC 125 Wood, Carpet, Resilient Base, and Linoleum • WC 126 Not Used • WC 127 Resinous Matrix Terrazzo, Interior Stone and Tile • WC 128 Penning and Gating • WC 129 Controlled Environment Rooms & Hoist System • WC 130 Light Tower • WC 131 Elevators • WC 132 Mechanical • WC 133 Electrical • WC 134 Building Automation Controls – Previously Awarded • WC 135 Fire Protection • WC 136 Asphalt Paving • WC 137 Landscaping & Irrigation
!"��#$��������������� Main Lab and Outbuildings Work Categories • WC 138 Laboratory Casework and Fume Hoods • WC 139 Laboratory Equipment & Accessories • WC 140 Custom Stainless Steel • WC 141 Test & Balance • WC 142 Fencing • WC 143 Waste Treatment System • WC 144 Air Tight Door Assemblies • WC 145 Not Used • WC 146 Signage • WC 147 Not Used • WC 148 HEPA Filters • WC 149 Not Used • WC 150 Audio Visual & Tele/Data • WC 151 Not Used
!"��#$��������������� Main Lab and Outbuildings Work Categories • WC 152 Food Service Equipment • WC 153 Not Used • WC 154 Building Enclosure Consultant • WC 155 Site Concrete • WC 156 Cleanroom Cleaning – Bid In Future Package
!"��#$��������������� Main Lab and Outbuildings Work Categories Specific Items – Mark Duda • WC-100 – APR Doors and Windows • WC-101 – Sterilizers • WC-102 – Incinerators • WC-103 – Tissue Autoclaves • WC-104 – Liquid Decontamination System For the above Work Categories bidders are reminded: - These are Furnish and Install - Vendors need to Partner with Installers - Refer to Additional Subcontractor Conditions and Specifications - MEP No-Gaps Matrix (Exhibit J) will be issued in September - Exhibit GG (Misc Metals Matrix) defines embeds to be furnished and installed by concrete contractor
!"��#$��������������� Main Lab and Outbuildings Work Categories Specific Items – Dan O’Neal • WC-105 – Mass Excavation – Does not include structural excavation which is part of 107. Can propose on both. • WC-106 – Site Utilities – Refer to P series drawings for some site drains and natural gas piping – Site piping between WWTP components as identified in exhibit PP