POTENTIAL AIR QUALITY Air Quality RULE REVISIONS Energy P R O P O - - PowerPoint PPT Presentation

DI VI SI ON OF AI R QUAL I T Y AI R QUAL I T Y, E NE RGY, AND SUST AI NABI L I T Y POTENTIAL AIR QUALITY Air Quality RULE REVISIONS Energy P R O P O SED R EV ISIO N S TO N . J . A . C . 7 : 2 7 - 1 6 . 3 Sustainability


slide-1
SLIDE 1

DI VI SI ON OF AI R QUAL I T Y

AI R QUAL I T Y, E NE RGY, AND SUST AI NABI L I T Y

Air Quality Energy Sustainability

Sta ke ho lde r Me e ting | June 24, 2016 | NJDE P

P R O P O SED R EV ISIO N S TO N . J . A . C . 7 : 2 7 - 1 6 . 3 G A SO LIN E TR A N SFER O P ER A TIO N S STA G E I A N D II V A P O R R EC O V ER Y SY STEM S

POTENTIAL AIR QUALITY RULE REVISIONS

1

slide-2
SLIDE 2

STAGE I AND STAGE II GASOLINE VAPOR RECOVERY SYSTEMS

  • T

he De pa rtme nt is initia ting a rule e ffo rt tha t a ffe c ts ne w a nd e xisting g a so line dispe nsing fa c ilitie s (GDF s) sub je c t to N.J.A.C. 7:27-16.3

  • T

he Divisio n o f Air Qua lity (DAQ) is se e king input fro m sta ke ho lde rs re g a rding :

  • De c o mmissio ning o f Sta g e I

I va po r re c o ve ry syste ms (VRS), a nd

  • Po te ntia l o ptio ns fo r Sta g e I

a nd ta nk b re a thing va po r c o ntro l syste ms

Slide 2 o f 10 6/ 24/ 16 | Air Qua lity Rule Re visio ns Sta ke ho lde r Me e ting | Pre se nte d b y: Judy Ra nd

slide-3
SLIDE 3

WHAT IS STAGE I AND STAGE II?

Stage I: F ue l Unloading Stage II: Ve hic le Re fue ling

Slide 3 o f 10 6/ 24/ 16 | Air Qua lity Rule Re visio ns Sta ke ho lde r Me e ting | Pre se nte d b y: Judy Ra nd

slide-4
SLIDE 4

WHY ARE WE DECOMMISSIONING STAGE II?

Slide 4 o f 10

  • T

he F e de ra l g o ve rnme nt re q uire s ne w ve hic le s to ha ve

  • nb o a rd re fue ling va po r re c o ve ry syste ms (ORVR). ORVR

c o lle c ts g a so line re fue ling e missio ns within the ve hic le .

  • ORVR wa s re q uire d to b e insta lle d in ne w pa sse ng e r c a rs in

1998 a nd spo rt utility ve hic le s a nd pic kup truc ks b y 2006.

  • Sta g e I

I is a llo we d to b e re mo ve d o nc e ORVR is in wide spre a d use .

  • So me Sta g e I

I syste ms a re c o nflic ting with ORVR o pe ra tio n, c a using a n inc re a se in e missio ns.

6/ 24/ 16 | Air Qua lity Rule Re visio ns Sta ke ho lde r Me e ting | Pre se nte d b y: Judy Ra nd

slide-5
SLIDE 5

NEW GASOLINE DISPENSING FACILITIES

  • Re mo ve re q uire me nts to insta ll Sta g e I

I g a so line re fue ling VRS a t ne w GDF s

  • Ne w VRS I

nsta lla tio n Ca pita l Co st Savings e stima te :

  • $14,000 – $20,000
  • Co mplia nc e a dviso ry prio r to rule a do ptio n

Slide 5 o f 10 6/ 24/ 16 | Air Qua lity Rule Re visio ns Sta ke ho lde r Me e ting | Pre se nte d b y: Judy Ra nd

slide-6
SLIDE 6

EXISTING GASOLINE DISPENSING FACILITIES

  • Re q uire de c o mmissio ning o f Sta g e I

I VRS a t e xisting GDF s with the o ptio n to ke e p Sta g e I I if the syste m is ORVR c o mpa tib le a nd ma inta ine d.

  • De c o mmissio ning a llo we d e ffe c tive with rule

a do ptio n

  • Antic ipa te d c o mplia nc e da te fo r c o mple tio n is 2

ye a rs.

Slide 6 o f 10 6/ 24/ 16 | Air Qua lity Rule Re visio ns Sta ke ho lde r Me e ting | Pre se nte d b y: Judy Ra nd

slide-7
SLIDE 7

EXISTING GDF FACILITIES CONTINUED

  • De c o mmissio ning in a c c o rda nc e with “PE

I RP300-09 Re c o mme nde d Prac tic e s fo r lnstallatio n and T e sting o f Vapo r-Re c o ve ry Syste ms at Ve hic le -F ue ling Site s” with the fo llo wing a dditio n:

  • Und e rg ro und piping to b e re mo ve d a t the time o f a ma jo r

mo d o r if the syste m fa ils a pre ssure te st due to unde rg ro und syste m

  • De c o mmissio ning One T

ime Co st E stima te : $8,000 - $13,000

  • I

nc lude s la b o r ($5,000 to $10,000) a nd e q uipme nt, with hig he r (do ub le ) la b o r c o sts a t va c uum a ssist site s

  • Annua l Ma inte na nc e Co st Savings E

stima te : $1,000 - $4,000

Slide 7 o f 10 6/ 24/ 16 | Air Qua lity Rule Re visio ns Sta ke ho lde r Me e ting | Pre se nte d b y: Judy Ra nd

slide-8
SLIDE 8

POTENTIAL OPTIONS UNDER EVALUATION

1. Dua l po int fue l unlo a d ing a t e xisting a nd / o r a ll ne w a nd re c o nstruc te d Sta g e I fa c ilitie s (F

e de ral rule is ne w o r re c o nstruc te d fac ilitie s g re ate r than 100,000 g allo ns pe r mo nth)

2. Ne w PV va lve e ve ry 2 ye a rs (a lre a d y in pe rmit a s o ptio n in lie u o f PV va lve te st) 3. Driple ss/ E CO no zzle s ($120 e a c h c o mpa re d to $50 fo r c o nve ntio na l) 4. L

  • w pe rme a tio n ho se s

($150 e a c h c o mpa re d to $90 fo r c o nve ntio na l)

Slide 8 o f 10 6/ 24/ 16 | Air Qua lity Rule Re visio ns Sta ke ho lde r Me e ting | Pre se nte d b y: Judy Ra nd

slide-9
SLIDE 9

POTENTIAL OPTIONS UNDER EVALUATION

CONTINUED

  • 5. CARB Ce rtifie d Sta g e I

E VR syste m:

  • 1. De pa rtme nt a lre a dy re q uire s CARB 98% e ffic ie nc y a nd PV

va lve s

  • 2. Ro ta ta b le a da pto rs
  • 3. F

ue l b le nd c o mpa tib ility

  • 4. L
  • w-e missio n spill c o nta inme nt ma nho le s
  • 6. Co ntinuo us Va po r/ Pre ssure Mo nito ring Syste ms

(le a k de te c tio n) – $4,500

  • 7. Pre ssure Ma na g e me nt (mo nito ring a nd c o ntro l

e q uipme nt) – Pa ssive : $10,000, Ac tive : $20,000- $40,000

Slide 9 o f 10 6/ 24/ 16 | Air Qua lity Rule Re visio ns Sta ke ho lde r Me e ting | Pre se nte d b y: Judy Ra nd

slide-10
SLIDE 10

TESTING

  • T

he Sta g e I I dyna mic b a c kpre ssure a nd A/ L vo lume ra tio te sting wo uld no lo ng e r b e re q uire d a fte r de c o mmissio ning o f Sta g e I I syste ms (c ost savings)

  • T

he sta tic pre ssure te st a nd PV va lve te st re q uire me nts in the e xisting rule wo uld re ma in, if c o ntinuo us pre ssure mo nito ring is no t a do pte d b y the De pa rtme nt

Slide 10 o f 10 6/ 24/ 16 | Air Qua lity Rule Re visio ns Sta ke ho lde r Me e ting | Pre se nte d b y: Judy Ra nd