SLIDE 7 EXISTING GDF FACILITIES CONTINUED
- De c o mmissio ning in a c c o rda nc e with “PE
I RP300-09 Re c o mme nde d Prac tic e s fo r lnstallatio n and T e sting o f Vapo r-Re c o ve ry Syste ms at Ve hic le -F ue ling Site s” with the fo llo wing a dditio n:
- Und e rg ro und piping to b e re mo ve d a t the time o f a ma jo r
mo d o r if the syste m fa ils a pre ssure te st due to unde rg ro und syste m
- De c o mmissio ning One T
ime Co st E stima te : $8,000 - $13,000
nc lude s la b o r ($5,000 to $10,000) a nd e q uipme nt, with hig he r (do ub le ) la b o r c o sts a t va c uum a ssist site s
- Annua l Ma inte na nc e Co st Savings E
stima te : $1,000 - $4,000
Slide 7 o f 10 6/ 24/ 16 | Air Qua lity Rule Re visio ns Sta ke ho lde r Me e ting | Pre se nte d b y: Judy Ra nd