possible solutions for new elementary school elementary
play

Possible Solutions for New Elementary School Elementary Schools - PowerPoint PPT Presentation

Possible Solutions for New Elementary School Elementary Schools Students Capacity FCI Bailey Elem. 637 664 0.0142 Middlesex 367 418 0.2066 Spring Hope 494 542 0.5394 Coopers 635 656 0.1781 Nashville 769 760 0.3464 Cedar


  1. Possible Solutions for New Elementary School

  2. Elementary Schools Students Capacity FCI Bailey Elem. 637 664 0.0142 Middlesex 367 418 0.2066 Spring Hope 494 542 0.5394 Coopers 635 656 0.1781 Nashville 769 760 0.3464 Cedar Grove 215 223 1.376 Swift Creek 280 475 1.248 Red Oak 245 335 1.847 Hubbard 469 512 0.3951 Winstead 605 625 0.0949 Englewood 516 508 0.5631 Benvenue 617 668 0.1905 Williford 446 581 0.4124 Baskerville 304 427 0.7955 Fairview 427 425 0.0863 Johnson 349 575 0.8291

  3. Cedar Grove Red Oak/ Swift Creek Taylors Store Rd. HWY58 I 95 HWY 64

  4. Nash County New Construction Map_091818.pptx

  5. DPI Guidelines ● K-6 10 acres + 1/100 ADM ● 700-800 ADM elementary school will need 17-18 acres ● Size, road frontage, shape, access, utilities, upfront cost, and developed cost ● Usable space on property (steep slopes, wetlands,on-site water, on-site sewer)

  6. Red Oak Elementary ● Main building constructed 1932 ● Capacity is 335 ● FCI is 1.847 ● The cost of bringing the building up to required standards has exceeded the total value of the building

  7. Red Oak Elementary ● Acreage:66.8 ● Electrical: Duke Energy ● Sewer: Municipal ● Water-On-Site: (well water) municipal within 2 years

  8. Nash County New Construction Map_091818.pptx

  9. Cedar Grove Elementary ● Main building constructed 1953 ● Building is slab on grade ● Capacity is 223 ● FCI is 1.376 ● 100 wing was renovated in 2003 due to fire

  10. Cedar Grove Elementary ● Acreage: 23.69 ● Electrical: Duke Energy ● Sewer-On-Site: subsurface system ● Water-On-site: Well

  11. Swift Creek Elementary ● Main building constructed in 1949 ● Capacity- 475 ● FCI- 1.248 ● Office building is not slab on grade ● Other buildings are slab on grade ● ADA issues on this site

  12. Swift Creek Elementary ● Acreage: 20.8 ● Electrical: Duke Energy ● Sewer-On-site: subsurface system ● Water-On-site: Well

  13. Points To Consider With Consolidation ● House Bill 90: Lowering Class Sizes for K-3 schools ● Phased in 2021-2022 School Year (Pursuant to G.S. 115C- 301) YEAR GRADE(S) DISTRICT AVERAGE INDIVIDUAL MAXIMUM 2017-2018 K-3 20 23 2018-2019 K-3 20 23 2019-2020 K-3 19 22 2020-2021 K-3 18 21 2021-2022 K 18 21 1st 16 19 2nd-3rd 17 20

  14. Points To Consider With Consolidation Continued ● Total ADM for Swift Creek, Cedar Grove, Red Oak is 740 ● Nashville Elementary current ADM is 769 ○ School Capacity is 760 ● Coopers Elementary current ADM is 635 ○ School Capacity is 656

  15. Points To Consider With Consolidation Continued ● Hubbard Elementary current ADM is 469 ○ School Capacity is 512 ● Possibilities ○ Adding mobile units at the elementary schools in this area due to being at or near capacity ○ Realignment of affected schools to alleviate possibility of adding mobile units

  16. Questions/Comments

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.