Lower Montoyas Water Quality Feature Mandatory Pre-Bid meeting Please Sign In 12/12/2012 1 Lower Montoyas Water Quality Feature Project Mandatory Pre-Bid Meeting January 27, 2015 2 Lower Montoyas Water Quality Feature Introductions


slide-1
SLIDE 1

Lower Montoyas Water Quality Feature Mandatory Pre-Bid meeting

12/12/2012 1

Please Sign In

slide-2
SLIDE 2

Lower Montoyas Water Quality Feature Project

Mandatory Pre-Bid Meeting January 27, 2015

2

slide-3
SLIDE 3

Lower Montoyas Water Quality Feature

  • Introductions

– SSCAFCA Staff

  • Dave Gatterman, P.E., Project Manager
  • Chuck Thomas, P.E., Executive Engineer
  • Jim Service, Field Services Director
  • Debbie Casaus, Procurement Officer

– Wilson & Co

  • Donnie Duneman, P.E.
  • Chris Perea, P.E.

– NMED

  • Stephanie DuBois, P.E.

12/12/2012 3

slide-4
SLIDE 4

Lower Montoyas Water Quality Feature

  • Funding

– Clean Water State Revolving Fund – Funds are EPA-based federal funds

  • Requires submittal of additional materials

during the bidding process

– We’ll go through this later in the presentation

4

slide-5
SLIDE 5

Lower Montoyas Water Quality Feature

  • Where exactly is the project?

5

slide-6
SLIDE 6

Lower Montoyas Water Quality Feature

  • Current site conditions

6

slide-7
SLIDE 7

Lower Montoyas Water Quality Feature

  • Bid Highlights

– Major bid item elements include, but are not limited to:

  • Installation of four hardened structures (drop

structures, grade control structures

  • Installation of two new ported risers
  • Relocation of stormwater line outfall (remove existing,

remove pipe, and reconstruct outfall)

  • Significant grading to create sediment retention basins

and desired channel geometry

  • Landscaping within structures and other areas of site
slide-8
SLIDE 8

Lower Montoyas Water Quality Feature

  • Site Layout

8

slide-9
SLIDE 9

Lower Montoyas Water Quality Feature

  • Stormwater Pollution Prevention Plan

(SWPPP)

– The project SWPPP is posted on our website – The successful bidder will need to file a Notice of Intent (NOI) for the project with the EPA. SSCAFCA will also file an NOI as the owner – No work on project shall commence until the mandatory waiting period after filing the NOI is complete

9

slide-10
SLIDE 10

Lower Montoyas Water Quality Feature

  • Where do I get plans?

– All bidding documents, including plans, specifications, reports, and addenda will be posted to www.sscafca.org.

  • If you are having issues downloading the files, please

pick up a CD containing all the files after this meeting.

– Check this website for addenda to the bid. It is the bidders responsibility to check the website for

  • addenda. SSCAFCA will not send notifications.

12/12/2012 10

slide-11
SLIDE 11

Lower Montoyas Water Quality Feature

  • Bid Schedule

– Last day to submit written questions is February 4, 2015 by 5:00 PM

  • Submit all questions via e-mail to dcasaus@sscafca.com
  • Please put “Question – IFB 2015-01, Lower Montoyas WQF

construction” in the subject line.

– SSCAFCA will post responses to written questions on web page (www.sscafca.org ) by Monday, February 9 by 5:00 PM – Any addenda will be issued by SSCAFCA by Monday, February 9 by 5:00PM. Addenda will be posted to the website. Aside from posting to the website, no notification will occur. – Bids are due to SSCAFCA by 3:00 PM on Thursday, February 12, 2015

slide-12
SLIDE 12

Lower Montoyas Water Quality Feature

  • Mandatory Bid Attachments

– Bid Bond – Subcontractor listing – SSCAFCA Campaign Contribution Disclosure form – EPA form XP-211 – EPA form XP-215 – EPA form XP-315 – EPA form 5700-49 – EPA form 6100-2 – EPA form 6100-3 – EPA form 6100-4 – Proof of solicitation of DBEs

  • All forms are provided in the bid package
  • Failure to submit any of the required attachments will be grounds for deeming bid

non-responsive

  • Make sure prime AND subcontractors (not suppliers) are currently registered with

the Department of Workforce Solutions

  • Make sure to acknowledge any Addenda on your Bid Form

12

slide-13
SLIDE 13

Lower Montoyas Water Quality Feature

  • Bidder or plan holders list

– SSCAFCA will not be maintaining a formal bidders or plan holders list. – SSCAFCA will be maintaining a listing of interested contractors and subcontractors. This listing is voluntary to get on and will be distributed upon request and/or posted to our website.

  • To get on this list, email dcasaus@sscafca.com
  • Please put “Request for contractor listing” in the subject line
  • List will be updated and posted on website weekly.
slide-14
SLIDE 14

Lower Montoyas Water Quality Feature

  • Desired Project Schedule (after bid)

– Bid opening, February 12, 2015 – SSCAFCA and NMED review of bids hopefully completed by February 17, 2015. Notify lowest responsive bidder. – Obtain SSCAFCA Board of Directors approval of selection on February 20, 2015 – Finalize contract by February 27, 2015 – Issue Notice to Proceed by March 2, 2015 – 120 day construction time has construction being completed in late June 2015

slide-15
SLIDE 15

Lower Montoyas Water Quality Feature

  • Questions?