PENNDOT PROJECT INFORMATION BOULEVARD OF ALLIES AND RAMPS BRIDGE - PowerPoint PPT Presentation

PENNDOT PROJECT INFORMATION BOULEVARD OF ALLIES AND RAMPS BRIDGE PRESERVATION PROJECT SR 0 885 SECTION A46 / SR 80 0 4 SECTION A0 3 CITY OF PITTSBURGH, ALLEGHENY COUNTY PROJECT TEAM PENNDOT DESIGN DIVISION Direct Questions To:


  1. PENNDOT PROJECT INFORMATION BOULEVARD OF ALLIES AND RAMPS BRIDGE PRESERVATION PROJECT SR 0 885 SECTION A46 / SR 80 0 4 SECTION A0 3 CITY OF PITTSBURGH, ALLEGHENY COUNTY

  2. PROJECT TEAM � PENNDOT DESIGN DIVISION � Direct Questions To: � Cheryl Solosky, P.E. | Project Manager � Phone: 41 2.429.50 56 � Em ail: csolosky@pa.gov � Nick Krobot, P.E. | Assistant Environm ental Manager � PENNDOT PRESS OFFICE � Steve Cow an | District Press Officer PLEASE COMPLETE SURVEY AT END OF PRESENTATION

  3. Average Daily Traffic Project Sum m ary Boulevard of the Allies Bridges Cost and Schedule: RAMP U 12,593 • Estim ated Construction Cost Allies Veh./Day W estbound $25M - $30 M 27,637 Veh./Day RAMP R • Anticipated Construction Duration 14,358 Ramp S / Veh./Day Spring 20 21 –Fall 20 22 Allies Eastbound Estim ated Construction Cost and Duration w ill 24,657 Veh./Day RAMP T be updated during Final Design. 12,629 Veh./Day RAMP V • Project Purpose: To m aintain safe and reliable travel on this portion of the Blvd. of 10,610 Veh./Day the Allies and its connection to and from I-376/Parkway East. • Project Need: Due to the physical deficiencies of the existing bridges causing Fair to Poor Condition ratings. Major Construction Activities: • Bridge Expansion Dam Replacem ents • Bridge Repainting –All Steel Mem bers • Bridge Deck Repairs and Overlays • New Pavem ent Markings • Bridge Structure Steel Repairs • Updated or New Signing • Bridge Bearing Replacem ents • Drainage Repairs • Bridge Concrete Substructure Repairs • Bridge Barrier Repairs Due to the site constraints of the project location and geom etry, as w ell as m ost of the w ork occurring on lim ited access ram ps to the interstate, it will not be feasible to provide pedestrian or bicycle facilities on these bridges through this project.

  4. Boulevard of the Allies Bridges Rehabilitation Prelim inary Construction Phasing RAMP U Allies W estbound RAMP R Ramp S / Allies Eastbound RAMP T RAMP V

  5. Boulevard of the Allies Detour of Ram p U: Boulevard of the Allies to Bridges Westbound I-376 via I-579N and Grant Street RAMP U Allies W estbound Proposed Detour: Continue west to I-579N, RAMP R Exit to Seventh Ave. Ramp S / Car detour will be via Grant St. Truck Detour will Allies be via Seventh Avenue, Liberty, Wood Street and Eastbound Blvd. of the Allie to Grant Street to: RAMP T • I-376 WB. RAMP V See Detail Below Ramp U Closed: Boulevard of the Allies Westbound to I-376 Westbound Legend: Downtown Truck Detour

  6. Boulevard of the Allies Bridges Detour of Blvd of the Allies Westbound / Inbound RAMP U Allies Proposed Detours via W estbound Fifth Avenue to: RAMP R • I-579 Ramp S / • Liberty Bridge Allies Eastbound • I-376 Westbound via RAMP T Grant St on-ramp RAMP V Fifth Ave Forbes Avenue See Detail Below Blvd of the Allies (Westbound) Closed Legend: Downtown Truck Detour

  7. Boulevard of the Allies Detour of Ram p R: I-376 Westbound to Bridges Boulevard of the Allies ( Allies w estbound closed ) RAMP U Proposed Car Detour via I-376 Allies W estbound Exit 71A Grant Street to: Legend: • Liberty Bridge Downtown RAMP R Truck Detour • Forbes Avenue Ramp S / Allies • I-579 (via Seventh Ave and Eastbound Bigelow Blvd) RAMP T See Detail 2 RAMP V Below EXIT 71A Grant St See Detail 1 Ramp R Exit 72B Below Closed: I-376 Detail 2 Westbound to Blvd. of the Allies Detail 1

  8. Boulevard of the Allies Truck Detour and Alternate Car Detour of Bridges Ram p R: I-376 Westbound to Boulevard of the Allies ( Allies w estbound closed, detour to I-279 North ) RAMP U Allies W estbound Truck detour and alternate car RAMP R Detour via I-376 Exit 70C to: Ramp S / • I-279 North Allies Eastbound • Ft Duquesne Bridge RAMP T Ramp R Exit 72B RAMP V Closed: I-376 Westbound to Blvd. of the Allies Ft Duquesne Ft Duquesne Bridge Bridge EXIT 70C Ft Duquesne Bridge North Shore Ft Pitt Bridge Ft Pitt Bridge See Detail Above

  9. Boulevard of the Allies Detour of Boulevard of the Allies Eastbound: Bridges From I-579 and Grant Street to I-376 Eastbound and Forbes Ave RAMP U Allies Boulevard of the W estbound Detours via I-579 Allies Eastbound RAMP R Seventh Ave Exit Closed Ramp S / and Grant Street to: Allies Eastbound • Forbes Avenue RAMP T • I-376 Eastbound RAMP V See Detail Above

  10. Boulevard of the Allies Bridges Detour of Boulevard of the Allies Eastbound: From Liberty Bridge to I-376 Eastbound and Forbes Ave. Oakland RAMP U Allies W estbound RAMP R Ramp S / Allies Eastbound RAMP T I-376 Wood St I-376 Wood St on-ram p via on-ram p via RAMP V Ft. Pitt Blvd. Ft. Pitt Blvd. See Detail Below Detours from Liberty Bridge to: • I-376 Eastbound Boulevard of the • Forbes Avenue Allies Eastbound Closed Note: Boulevard of the Allies Eastbound to remain open from the Liberty Bridge to M ercy Hospital for emergency vehicle access.

  11. Boulevard of the Allies Alternate Detour of Boulevard of the Allies Bridges Eastbound: from I-279 via Ft Duquesne Bridge RAMP U Boulevard of the Allies W estbound Alternate Detour Allies Eastbound via I-279 South to: RAMP R Closed • Boulevard of Ramp S / Allies the Allies Eastbound RAMP T RAMP V Ft Duquesne Ft Duquesne Bridge Bridge EXIT to I-376 to M onroeville EXIT 72A to Forbes Ave Ft Pitt Bridge Ft Pitt Bridge See Detail Above Liberty Bridge Liberty Bridge

  12. Boulevard of the Allies Alternate Detour of Boulevard of the Allies Bridges Eastbound: from I-279 via Ft Duquesne Bridge RAMP U Boulevard of the Allies Alternate Detour W estbound Allies Eastbound via I-279 South to: RAMP R Closed • I-376 Ramp S / Allies Eastbound RAMP T RAMP V EXIT to I-376 to M onroeville Ft Duquesne Ft Duquesne Bridge Bridge EXIT 71A to Grant St Ft Pitt Bridge Ft Pitt Bridge See Detail Above Liberty Bridge Liberty Bridge

  13. Boulevard of the Allies Bridges Detour of Ram p T: from Blvd. of the Allies to I-376 Eastbound ( Allies eastbound open ) RAMP U Allies W estbound RAMP R Ramp S / Proposed Detour via Allies Eastbound Blvd. of the Allies RAMP T and Bates Street to: • I-376 Eastbound RAMP V See Detail Below Ramp T Closed: Pittsburgh Blvd. of the Technology Center Allies to I-376 Eastbound

  14. Boulevard of the Allies Detour of Ram p V: I-376 Eastbound to Bridges Forbes Avenue ( Allies Eastbound is open ) RAMP U Allies W estbound RAMP R Proposed Detour: exit Ramp S / I-376 upstream at Exit Allies Eastbound 71A Grant Street to EXIT 71A RAMP T Blvd. of the Allies to: Grant St • Forbes Ave. RAMP V See Detail Below Ramp V Exit 72A Closed: I-376 Eastbound to Forbes Ave Oakland

  15. Boulevard of the Allies Detour of Ram p V: I-376 Eastbound to Forbes Bridges Avenue ( Allies Eastbound is closed ) RAMP U Proposed Detour: exit I-376 upstream Allies at Exit 71A Grant St, First Ave, B St, W estbound Second Ave, Bates St, Blvd of the EXIT 71A RAMP R Allies, Craft Avenue to: Grant St Ramp S / Allies • Forbes Avenue. Eastbound RAMP T RAMP V See Detail Below Ramp V Exit 72A Closed: I-376 Eastbound to Forbes Ave Oakland

  16. Boulevard of the Allies Detour of Ram p V: I-376 Eastbound to Forbes Bridges Avenue ( Allies Eastbound is closed ) RAMP U Proposed Detour: Continue Allies east downstream to Exit 74 W estbound Squirrel Hill then Forward RAMP R Ave, M urray Ave to: Ramp S / Forbes Avenue • Forbes Ave Allies Eastbound RAMP T EXIT 74 RAMP V Squirrel Hill See Detail Below Homestead z Ramp V Exit 72A Closed: I-376 Eastbound to Forbes Ave Oakland

  17. National Environmental Policy Act (NEP A) Public outreach begins with the NEPA (National Environmental Policy Act) process: • NEP A requires agencies to integrate environmental values into their decision-making processes by considering the environmental impacts of their proposed actions and reasonable alternatives to those actions • NEP A also includes public involvement activities and gathering feedback from the public Image courtesy of MDOT

  18. PROJECT SURVEY https://w w w .surveym onkey.com /r/X22WC2X

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.