part 2 neighborhood framework update
play

PART 2: NEIGHBORHOOD FRAMEWORK UPDATE ROSA PARKS - CLAIRMOUNT - PowerPoint PPT Presentation

PART 2: NEIGHBORHOOD FRAMEWORK UPDATE ROSA PARKS - CLAIRMOUNT | 27 COMMUNITY ENGAGEMENT | WHAT WE HEARD SO FAR 7 NEIGHBORHOOD AGENCY TABLES THIS FRAMEWORK PRODUCES/ ENABLES: 3 PUBLIC STABILITY: Restore existing housing &


  1. PART 2: NEIGHBORHOOD FRAMEWORK UPDATE ROSA PARKS - CLAIRMOUNT | 27

  2. COMMUNITY ENGAGEMENT | WHAT WE HEARD SO FAR… 7 NEIGHBORHOOD AGENCY TABLES THIS FRAMEWORK PRODUCES/ ENABLES: 3 PUBLIC STABILITY: Restore existing housing & develop FORUM MEETINGS affordable, diverse housing options 10 OPPORTUNITY: Attract Mixed Use development ADVISORY + FOCUS GROUP MEETINGS CONVENIENCE: Expand Neighborhood Retail 12 What we heard from residents: WEEKS ON-SITE COHESION: Reactivate the Landscape OPEN OFFICE • We value our neighbors and want to stay HOURS • S afety 7 SAFETY: Provide safe passage that connects • Address vacant buildings, home & land people to key neighborhood destinations RESIDENT • Maintain continuity of the architectural style of existing housing STORY TELLING • Bring back neighborhood amenities, such as retail and educational centers SESSIONS ROSA PARKS - CLAIRMOUNT | 28

  3. COMMUNITY ENGAGEMENT | WHAT WE HEARD PLACEHOLDER RESIDENT PHOTOS + QUOTES ROSA PARKS - CLAIRMOUNT | 29

  4. NEIGHBORHOOD IDENTITY | 12 TH STREET HERITAGE 12 TH St. CLAIRMOUNT TAYLOR HAZELWOOD ROSA PARKS - CLAIRMOUNT | 30

  5. PRESENTATION CONTENTS  STRATEGY 1: CONNECT NEIGHBORHOODS BY IMPROVING ROS A (12 TH S P ARKS T .)  STRATEGY 2: PROMOTE DEVELOPMENT EAS T OF THE LODGE  STRATEGY 3: S TRENGTHEN NEIGHBORHOOD RETAIL  STRATEGY 4: CREATING GREAT NEIGHBORHOOD P ARKS ROSA PARKS - CLAIRMOUNT | 31

  6. STRATEGY 1 CONNECT NEIGHBORHOODS: IMPROVING (12 TH S ROS A P ARKS T .) ROSA PARKS - CLAIRMOUNT | 32

  7. LOCAL CONNECTIVITY | ROSA PARKS BLVD. ROAD BOND PROJECTS: A ROSA PARKS STREETSCAPE IMPROVEMENTS A • LANDS CAPED MEDIAN + S TREET TREES • 12 TH S T . S IGNAGE/ BRANDING • PROTECTED BIKE LANES • ENHANCED CROS S ING AT PINGREE S T . B REDESIGN INTERSECTION AT GRAND BLVD. B ROSA PARKS - CLAIRMOUNT | 33

  8. PROJECT A | ROSA PARKS (12 TH STREET) STREETSCAPE PROTECTED LANDS CAPED MEDIAN & BIKE LANES S TREET TREES 12 TH S T . BRANDING ENHANCED & S IGNAGE CROS S WALK ROSA PARKS - CLAIRMOUNT | 34

  9. VIRGINIA PARK PLAZA | EXISTING CONDITIONS 1 CONNECT NEIGHBORHOOD TO COMMUNITY AS S ETS 2 PROVIDE S AFE P AS S AGE 3 BEAUTIFY 12 TH S TREET NEIGHBORHOOD ROSA PARKS - CLAIRMOUNT | 35

  10. VIRGINIA PARK PLAZA | EXISTING CONDITIONS Virginia Park Plaza Before: Virginia Park Plaza Existing Entry Condition ROSA PARKS - CLAIRMOUNT | 36

  11. VIRGINIA PARK PLAZA PROPOSED PROMENADE $500K $500K CAPI APITAL FUND UNDING NG 1 Proposed Virginia Park Plaza Promenade 2 CREATE FRONT DOOR S UPPORT VPP ACCES S TO BUS INES S COMMUNITY CORE REVITALIZATION ROSA PARKS - CLAIRMOUNT | 37

  12. VIRGINIA PARK PLAZA | EXISTING CONDITIONS SENIOR HOUSING VIRGINIA PARK PLAZA MEDICAL CENTER REC. CENTER PARK & SPLASH PAD ROSA PARKS - CLAIRMOUNT | 38

  13. VIRGINIA PARK PLAZA PROMENADE P SENIOR HOUSING P VIRGINIA PARK PLAZA GREEN S P ACE W/ TORIC 12 TH S MEDICAL HIS T . CENTER FOOTPRINT PROMENADE P CONNECTION FROM 12 TH S T . TO P ARK REC. CENTER P PARK & POP-UP MARKET S P ACE SPLASH PAD TORIC 12 TH S W/ HIS T . FOOTPRINT ROSA PARKS - CLAIRMOUNT | 39

  14. LOCAL CONNECTIVITY | ROSA PARKS BLVD. ROAD BOND PROJECTS: A ROSA PARKS STREETSCAPE IMPROVEMENTS A • LANDS CAPED MEDIAN + S TREET TREES • 12 TH S T . S IGNAGE/ BRANDING • PROTECTED BIKE LANES • ENHANCED CROS S ING AT PINGREE S T . B REDESIGN INTERSECTION AT GRAND BLVD. B ROSA PARKS - CLAIRMOUNT | 40

  15. PROJECT B | GRAND BLVD. INTERSECTION VD. VD. BL BL ARKS ARKS LOTHRUP AVE. LOTHRUP AVE. A P A P ROS ROS CLOS E NORTH- BOUND S ECTION OF ROS A P ARKS REDES IGN W. GRAND BL VD. W. GRAND BL VD. INTERS ECTION AT GRAND BL VD ADD BIKE LANES AND 2-WAY S TREET CONVERS ION FERRY PARK ST. FERRY PARK ST. EXISTING: North – S outh Traffic Pattern PROPOSED: Reconfigured Traffic Pattern ROSA PARKS - CLAIRMOUNT | 41

  16. REGIONAL CONNECTIVITY | ROSA PARKS BLVD $3.3 M ROAD BOND 3.5 MI. PROJECT LENGTH 2018 DES IGN 2019 INS TALL 1-WAY TRAFFIC 1-WAY TRAFFIC DPW 2-WAY TRAFFIC 2-WAY TRAFFIC EXISTING: NORTH – S OUTH TRAFFIC P ATTERN PROPOSED: RECONFIGURED TRAFFIC P ATTERN AGENCY ROSA PARKS - CLAIRMOUNT | 42

  17. REGIONAL CONNECTIVITY | WEST RIVERFRONT ROSA PARKS - CLAIRMOUNT | 43

  18. REGIONAL CONNECTIVITY | WEST RIVERFRONT ROSA PARKS - CLAIRMOUNT | 44

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.

Recommend


More recommend