Parker Hill Branch Improvements City of Boston Martin J. Walsh, Mayor Boston Public Library and Public Facility Department May 17, 2017 Meeting Agenda: -Introductions - Project Overview - Schedule - Questions Project Team: Public


slide-1
SLIDE 1

Parker Hill Branch Improvements City of Boston

Martin J. Walsh, Mayor Boston Public Library and Public Facility Department

May 17, 2017

slide-2
SLIDE 2

Meeting Agenda:

  • Introductions
  • Project Overview
  • Schedule
  • Questions
slide-3
SLIDE 3

Project Team: Public Facilities Department: Director, Tricia Lyons Brian McLaughlin, Tom Leahy, James Sessum Boston Public Library: President, David Leonard Eamon Shelton, Michael Colford, Alison Ford Architect: Bargmann Hendrie + Archetype, Inc.

slide-4
SLIDE 4
slide-5
SLIDE 5

1931 Building constructed. 1989 Mission Hill Triangle Historic District added to National Register MHC review required. 2003 Petition to Boston Landmarks Commission for listing as an individual landmark

  • accepted. Petition still ‘Pending’.

BLC review required. 2005 Accessibility upgrades (exterior ramp, interior elevator) interior and exterior repairs.

slide-6
SLIDE 6

InteriorView

slide-7
SLIDE 7

Water damage at building interior.

slide-8
SLIDE 8

Water damage at main readingroom.

slide-9
SLIDE 9

Water damage at eastwall

slide-10
SLIDE 10

Damaged plaster at wall around window in Auditorium.

slide-11
SLIDE 11

Exterior Masonry - open joints and cracks instone.

slide-12
SLIDE 12

Detail of open mortar joints at granite.

slide-13
SLIDE 13

Patched treads and open joints at frontsteps. Stone veneer not secured at sidewall.

slide-14
SLIDE 14

Original steel windows remain.

slide-15
SLIDE 15

Steel at windows is rustedthroughout.

slide-16
SLIDE 16

Investigations and watertesting.

slide-17
SLIDE 17

Test3

slide-18
SLIDE 18

Project Overview

  • Window Replacement
  • Interior Painting
  • Plaster Repair
  • Masonry Repairs
  • Stair Repair
  • Waterproofing
slide-19
SLIDE 19

1 1/4" 1/2" CAULK 1 3/4" LIMESTONE SURROUND STEELFRAME LEAD CAMING INTERIOR EXTERIOR 1 1/2" . (ORIGINALLY) OPERABLE HOPPER WINDOW IN MASONRY OPENING (ORIGINALLY) OPERABLE* CASEMENT WINDOW, FRAME AND SASH * ONLY ONEWINDOW IS CURRENTLY OPERABLE . . (ORIGINALLY) OPERABLE HOPPER WINDOW AT BASEMENT LIMESTONE SURROUND STEELFRAME LEAD CAMING INTERIOR EXTERIOR 1 1/2" EXISTING STEEL CASEMENT WINDOW EXISTING STEEL HOPPER WINDOW 7 1/2" 5" EXISTING STEEL HOPPER WINDOW HOPPER WINDOWS ARE SET IN BACKWARDS RELATIVE TOCASEMENT WINDOWS AT BOTTOM ROWS INTERIOR EXTERIOR

D:\Revit Local\3261_Parker Hill_R2015_2_ryoung.rvt

EXISTING STEEL WINDOWS

PLAN DETAIL @ OPERABLE CASEMENT WINDOW FULL SCALE PLAN DETAIL @ OPERABLE HOPPER WINDOW FULL SCALE SECTION THROUGH EXISTING STEEL WINDOWS 1 1/2" =1'-0" ELEVATION OF EXISTING STEEL WINDOWS 3/8" = 1'-0" DECEMBER 07, 2016

slide-20
SLIDE 20
slide-21
SLIDE 21

Schedule:

  • Bid Release: May 2017
  • Bid Award: June 2017
  • Close branch/pack up collection: July 2017
  • Start construction July 2017
  • Complete construction May 2018
  • BPL move in May – June 2018
  • Open to the public – June 2018