Operations Committee Meeting North Carolina Turnpike Authority July 13, 2017 Express Lanes Toll Rate Policy Spencer Franklin, P. E. Turnpike Project Development Overview Jennifer Harris, P.E. Turnpike Project Development Overview Turnpike


slide-1
SLIDE 1

Operations Committee Meeting

North Carolina Turnpike Authority July 13, 2017

slide-2
SLIDE 2

Express Lanes Toll Rate Policy

Spencer Franklin, P. E.

slide-3
SLIDE 3

Turnpike Project Development Overview

Jennifer Harris, P.E.

slide-4
SLIDE 4

Turnpike Project Development Overview

Turnpike Projects

Veridea Parkway

(R-2635D)

Morrisville Parkway

(U-5315)

Morrisville Parkway

(U-5315)

Veridea Parkway

(R-2635D)

slide-5
SLIDE 5

Turnpike Project Development Overview

5

Project Data

  • I-5507
  • 16.7 mi new capacity
  • I-77 to US 74

Milestones

  • Shortlist - 1/11/17
  • RFP Release - Pending
  • Environmental Document (Summer 2017)
  • ROW Acquisition (FY 2018)
  • Construction (FY 2018)

I-485 Express Lanes

slide-6
SLIDE 6

Turnpike Project Development Overview

6

Mid-Currituck Bridge

Project Data

  • R-2576
  • 7.3mi of new location
  • Spans Currituck Sound connecting the

Currituck County mainland with the Outer Banks

Milestones

  • Complete financial feasibility study (2017)
  • ROW Acquisition (FY 2018)
  • Construction (FY 2018)
slide-7
SLIDE 7

Turnpike Project Development Overview

7

US 74 Express Lanes

Project Data

  • Phase I:
  • U-5526A
  • 5.8 mi
  • I-277 to Wallace Lane
  • Phase II:
  • U-2509
  • 6.3 mi
  • Conference Drive to I-485

Milestones

  • Phase I:
  • ROW (FY 2017)
  • Construction (FY 2018)
  • Phase II:
  • Environmental assessment

(FY 2018)

  • FONSI (FY 2019)
  • ROW & Construction (FY 2020)
slide-8
SLIDE 8

Turnpike Project Development Overview

8

Complete 540

Project Data R-2721

  • 7.8 mi new location
  • NC 55 to US 401

R-2828

  • 8.7 mi new location
  • US 401 to I-40

R-2829

  • 10.8 mi new location
  • I-40 to US 64/US 264

Bypass Milestones

  • Final EIS - submit late 2017
  • Record Of Decision - submit

mid-2018

  • ROW & Construction (R-2721 & R2828) - FY 2020
  • ROW & Construction (R-2829) - FY 2027
slide-9
SLIDE 9

Project Development Overview

9

I-40 Express Lanes

Project Data

  • I-5702
  • 18.6 mi new capacity
  • US 15/501 to Wade Avenue;

2 of 3 segments (A & B) extend to NC 147

Milestones

  • Right of Way (FY 2026)
  • Construction (FY 2026)
slide-10
SLIDE 10

Project Development Overview

10

I-77 Express Lanes

Project Data

  • I-5718
  • 9.6 mi new capacity
  • I-485 to I-277/NC 16; 3 of 5 segments

(A, B & E)

Milestones

  • Right of Way (2024)
  • Construction (2027)
slide-11
SLIDE 11

Wrong-Way Driver Detection and Notification Program

Andy Lelewski, P.E.

slide-12
SLIDE 12

Agenda

12

NCTA Wrong-Way Driver Detection and Notification Program

  • 1. Overview of Triangle Expressway Program
  • 2. Lessons Learned to Date
  • 3. Concept of Operations for New Program
  • 4. Potential Solutions for Monroe Expressway
  • 5. Program Implementation
slide-13
SLIDE 13

Overview of Triangle Expressway Program

13

NCTA Wrong-Way Driver Detection and Notification Program

  • All-electronic tolling facility
  • Average Weekday Traffic =

49,800 (AWT) at busiest section

  • 18 toll zones
  • All equipped to detect wrong-way

drivers

  • Uses roadside tolling system
  • Average of 3 wrong-way

drivers detected monthly

  • No wrong-way driving crash

since opening

slide-14
SLIDE 14

14

NCTA Wrong-Way Driver Detection and Notification Program

Toll Zone 5-2

  • Wrong-Way Driver Recorded on Triangle Expressway
  • Detected at toll zone 5-2
  • Toll NC-540 Southbound
  • North of Green Level West interchange
  • Point of origin Green Level West interchange

Right Way Wrong-Way

Overview of Triangle Expressway Program

slide-15
SLIDE 15

Overview of Triangle Expressway Program

15

1 2 3 1 2 3 Wrong-Way Driver Detected

  • Loop detectors

(part of roadside toll system)

Control Room Notification

  • E-mail

notification sent to

  • perators

Operators Verify Notification NCSHP Notified, Operators Track

  • Roadside

Overview Cameras

  • Closed-circuit

TV cameras

  • Phone call to

NCSHP dispatcher

NCTA Wrong-Way Driver Detection and Notification Program

slide-16
SLIDE 16

16

  • Notification time

− 90+ seconds for control room notification email to arrive

  • Notification sources

− Tolling and ITS networks are not integrated − Notification source is limited to e-mail only

  • Manual verification required

− No visual data in initial notification

NCTA Wrong-Way Driver Detection and Notification Program

Lessons Learned to Date

slide-17
SLIDE 17

Concept of Operations for New Program

17

  • Currently in draft form
  • Scan for national trends

in wrong-way driver detection

  • Recommend solutions
  • Develop a deployment methodology and schedule
  • Detail operations and maintenance plans

NCTA Wrong-Way Driver Detection and Notification Program

slide-18
SLIDE 18

18

Concept of Operations for New Program

Central Florida Expressway Authority

  • Radar detectors on ramps
  • Flashing red beacons on signs
  • Cameras record vehicles traveling wrong way

Miami-Dade Expressway Authority (MDX)

  • Microwave radar detectors on ramps
  • Inductive loop detectors on ramps

Florida’s Turnpike Enterprise

  • Dual radar detectors and high quality cameras on ramps
  • High definition radar detectors on mainline
  • IDRIS smart loops on reversible lanes

NCTA Wrong-Way Driver Detection and Notification Program

slide-19
SLIDE 19

19

  • Proposes typical solution
  • Provides solution that can be scalable to any location
  • Can apply to all situations: ramps, mainlines,

express lane direct connects, express lane gate control systems

  • Primary focus is for Monroe Expressway
  • Desire to implement before completion

NCTA Wrong-Way Driver Detection and Notification Program

Concept of Operations for New Program

slide-20
SLIDE 20

Potential Solutions for Monroe Expressway

20

  • Similar greenfield project

to Triangle Expressway

  • All-electronic tolling

facility

  • 19.8 miles long
  • 14 mainline toll zones
  • Currently set up to detect

wrong-way drivers with roadside toll system

NCTA Wrong-Way Driver Detection and Notification Program

slide-21
SLIDE 21

21

Potential Solutions for Monroe Expressway

Mainline & Ramp Treatments

NCTA Wrong-Way Driver Detection and Notification Program

slide-22
SLIDE 22

Potential Solutions for Monroe Expressway

Wrong-Way Driver Detected

  • Loop

detectors at mainline toll zones AND radar at ramps

Control Room Notification & Verification

  • E-mail, pop-ups, & video

notification sent to all responders and to video screens

  • Review video to confirm

location and vehicle type and vehicle behavior

Operators Monitor Situation Until Resolved Wrong-Way Alert to Driver

  • Wrong-way

signs light up to alert wrong-way driver

22

*Monroe Expressway conceptual detection and notification system flowchart

  • Comms with
  • Emerg. Resp.
  • Visual

Tracking

  • DMS updated

NCTA Wrong-Way Driver Detection and Notification Program

slide-23
SLIDE 23

23

Program Implementation

1) In process of selecting test sites on Triangle Expressway based

  • n wrong-way driving data

2) Proceed with design of program for Monroe Expressway in parallel 3) Procure and deploy Triangle Expressway test sites in 2017 4) Take lessons learned and revise Monroe Expressway and Triangle Expressway plans/program 5) Deploy Monroe Expressway program in 2018 6) Deploy Triangle Expressway (entire) and Complete 540 program in 2019-21

NCTA Wrong-Way Driver Detection and Notification Program

slide-24
SLIDE 24

Triangle Expressway / NC 147 Detour Route Review

Andy Lelewski, P.E.

slide-25
SLIDE 25

Triangle Expressway / NC 147 Detour Route Review

Detour in effect June 30,10:00 PM to July 5, 7:00 AM

25

slide-26
SLIDE 26

26

Thank You

NCTA Wrong-Way Driver Detection and Notification Program