Nashua-Merrimack-Bedford 13761 F.E. Everett Turnpike Improvements to Traffic Operations and Safety November 17, 2016 Agenda Scope of Work Project Overview Project Need Project Segments Bridges/Structures Environmental


slide-1
SLIDE 1

Nashua-Merrimack-Bedford 13761 F.E. Everett Turnpike

Improvements to Traffic Operations and Safety

November 17, 2016

slide-2
SLIDE 2

Agenda

  • Scope of Work
  • Project Overview
  • Project Need
  • Project Segments
  • Bridges/Structures
  • Environmental Issues
  • Public Outreach
  • Schedule
  • Questions/Comments

2

slide-3
SLIDE 3

Project Overview

  • Widen 3 segments of the existing 2 - lane portions
  • f the F.E. Everett Turnpike between Nashua and

Merrimack

  • Add a Northbound and Southbound travel lane
  • Evaluate 5 bridges for rehabilitation or replacement
  • Exits/Interchanges not being reconstructed
  • Toll modifications are not being considered as part
  • f this project
  • Environmental study to include noise abatement

evaluations for the corridor

3

slide-4
SLIDE 4

Project Need

  • Improved Mobility/Congestion Relief
  • Improved Safety
  • Median treatments
  • Update safety features
  • Address Bridge and Structures
  • Widening needs
  • “Red List” bridge

4

slide-5
SLIDE 5

Project Overview

  • F.E. Everett

Turnpike

  • 3 Segments
  • Southern
  • Middle
  • Northern

5

slide-6
SLIDE 6

Southern Segment

Nashua and Merrimack

  • Exit 8 in Nashua to Exit 10 in Merrimack
  • Approximately 1.5 miles long
  • F.E. Everett Bridge over the Pennichuck Brook

6

FEET over Pennichuck Brook

slide-7
SLIDE 7

Southern Segment

7

slide-8
SLIDE 8

Middle Segment

Merrimack

  • Exit 11 in Merrimack north to the southerly limits of

Exit 13 (Bedford toll) interchange

  • Approximately 5.3 miles long
  • F.E. Everett Turnpike over Greeley Street

8

Exit 11 Merrimack/Greeley Street Bridge

slide-9
SLIDE 9

Middle Segment

Merrimack

  • Baboosic Lake Road

Bridge over the F.E. Everett Turnpike (“red list”)

  • Wire Road Bridge
  • ver the F.E. Everett

Turnpike

  • F.E. Everett Turnpike
  • ver Baboosic Brook

9

slide-10
SLIDE 10

10

  • F.E. Turnpike over the

Souhegan River

(Merrill’s Marauders Bridge)

  • Recently completed

(accommodates the third lane)

  • Widening will be

necessary on the roadway approaches

  • Modification of the lane

layout over the bridge

Middle Segment

Merrimack

Merrill’s Marauders Bridge

slide-11
SLIDE 11

Middle Segment

11

slide-12
SLIDE 12

Northern Segment

Bedford

  • Northerly limits of Exit 13 (Bedford toll) interchange

through the I-293 interchange in Bedford

  • Approximately 1.3 miles long

12

Route 3 over FEET in Bedford I-293 Interchange

slide-13
SLIDE 13

Northern Segment

13

  • No proposed

work to the recently completed US Route 3 Bridge over the F.E. Everett Turnpike

slide-14
SLIDE 14

Key Structures and Bridges

  • F.E. Everett over Pennichuck Brook
  • Baboosic Lake Road over F.E. Everett
  • Wire Road over F.E. Everett
  • F.E. Everett over Greeley Street (paving only)
  • F.E. Everett over the Baboosic Brook
  • 3 unnamed streams (culverts)

14

slide-15
SLIDE 15

Key Environmental Issues

  • Wetland and Waterway Impacts – Pennichuck Brook

and Baboosic Brook crossings; wetlands and streams throughout

  • Noise – evaluations corridor long from Exit 8 in

Nashua northerly to the I-293 interchange in Bedford

  • Water Quality – stormwater runoff
  • Rare Species

15

slide-16
SLIDE 16

Key Public Outreach Efforts

  • Early consultation with towns and

stakeholders

  • Public officials meetings
  • Public information meetings
  • Newsletters
  • Project specific website
  • Agency consultation meetings
  • Public comment period on the

Environmental Assessment document

  • Public Hearing

16

slide-17
SLIDE 17

Project Schedule

  • Environmental Assessment 2017
  • Preliminary design alternatives
  • Public meetings
  • Public Hearing in 2017
  • Final design to take place from 2017 to 2020
  • First project to start construction as early as 2021

17

slide-18
SLIDE 18

Questions and Comments

18

slide-19
SLIDE 19

Thank you!

Coming soon… Visit www.EverettTurnpikeWidening.com for more information on the project

19