offshore wind farm golfo di gela
play

Offshore Wind Farm Golfo di Gela Project Description State of the - PowerPoint PPT Presentation

Offshore Wind Farm Golfo di Gela Project Description State of the authorization 2015 Offshore Wind Farm Golfo di Gela 1. Project description 1/2 - The area proposed for the development of the site is located in the territorial waters of


  1. Offshore Wind Farm Golfo di Gela Project Description State of the authorization 2015

  2. Offshore Wind Farm – Golfo di Gela 1. Project description 1/2 - The area proposed for the development of the site is located in the territorial waters of Sicily; - The development area is 9.5 square kilometres, 3.8 kilometres away from the coast; - The aerial view of water surface has an almost rectangular shape, with a spacing between the turbines of 800 meters x 450 meters, calculated to optimize the exploitation of wind energy and minimize the visual impact; - The wind turbines will be equal to the hub height 80 meters and a maximum diameter of the rotor of 112 meters, to a maximum height of 135 meters;

  3. Offshore Wind Farm – Golfo di Gela 1. Project description 2/2 - The diameter of the tower to the base will be 5/6 meters and 4 meters of the hub; - The wind turbines proposed for the construction of 38 wind turbines single post will be able to develop a maximum power of 3.3 MW each, for a total of 125.4 MW of installed capacity and a total producible energy equal to 230,000 MWh/year; - The turbines start generating electricity with a wind speed of 3.5 m/s, reach their maximum capacity to generate energy at a wind speed of 14 m/s. The maximum wind speed at which the turbine is capable of generating electrical energy is equal to 25 m/s, although the structures are designed to withstand up to wind speeds of 70 m/s; - The hours of operation provided the highest certified power level (p75) is equal to 1,900 hours/year;

  4. Offshore Wind Farm – Golfo di Gela 2. Economic aspects - The expected duration for construction and commissioning of the project is equal to 20 months; - The duration of the concession provided is 30 years. Annual revenues of management: (sale at a reduced fee € 201.7 / MWh * 226 200 MWh per year) 17.1% - IRR of the project: Overall the construction phase of the plant will involve about 100 people (including staff, direct and indirect). Once in full operation, the activities of routine and extraordinary maintenance will involve approximately 20 employees including management, supervisory roles, and specialist maintenance crews for sea and air transport.

  5. Offshore Wind Farm – Golfo di Gela 3. State of the authorization a) EIA decree issued by the Ministry of Environment; b) Awarded the state concession from the Ministry of Transport; c) Obtained authorization to construct and operate by the Ministry of Infrastructure and Transport, subject to the outcome of the screening of the project at the Ministry of the Environment; d) Received a positive opinion of the Ministry of the Environment on January 23, 2014, so SPV is finally authorized the construction and operation of offshore wind farm.

  6. Offshore Wind Farm – Golfo di Gela 4. Lay-out of the wind park

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.

Recommend


More recommend