SLIDE 37 Option Two Funding Analysis
Obj ti t iti t NG9 1 1 t k ibl t d th t f l t b i
Year Total Revenue
Legacy Costs
Option Two Available Funding Difference
Objective – transition to NG9-1-1 network as soon as possible to reduce the amount of legacy costs being
- paid. Some call taker equipment in the PSAPs is upgradeable to NG9-1-1 capabilities and complete
equipment replacement is not necessary.
2012 $13,857,395
$12,165,374
$10,823,503 $1,692,021
2013 $13,857,395
$12,165,374
$7,115,976 $1,692,021
2014 $13 857 395
$1 000 000
$7 115 976 $12 857 395 $5 741 419 2014 $13,857,395
$1,000,000
$7,115,976 $12,857,395 $5,741,419 2015 $13,857,395
$1,000,000
$7,115,976 $12,857,395 $5,741,419 2016 $13,857,395
$1,000,000
$7,115,976 $12,857,395 $5,741,419 2017 $13,857,395
$1,000,000
$7,115,976 $12,857,395 $5,741,419 2018 $13,857,395
$1,000,000
$7,115,976 $12,857,395 $5,741,419 2019 $13,857,395
$1,000,000
$7,115,976 $12,857,395 $5,741,419 2020 $13,857,395
$1,000,000
$7,115,976 $12,857,395 $5,741,419 2021 $13,857,395
$1,000,000
$7,115,976 $12,857,395 $5,741,419
Note: A little over one-third of workstations are capable of NG9-1-1 and do not need replacement.
ARCHITECTURE ENGINEERING COMMUNICATIONS TECHNOLOGY
AVIATION | CIVIL | CONSTRUCTION SERVICES | DATA SYSTEMS | ENVIRONMENTAL FACILITIES ENGINEERING | GEOSPATIAL | NETWORKS | PUBLIC SAFETY | TRANSPORTATION
Note: A little over one third of workstations are capable of NG9 1 1 and do not need replacement.