SLIDE 2 Background
- 16 County Region
- Completed Regional Water Demand Forecast
- Completed a planning-level evaluation of supply and determined
“gap” through year 2060
- Completed a screening analysis of options
- Conservation
- Groundwater
- Importation
- New Reservoir
- Reallocation
SLIDE 3 Screening Criterion
- Supplemental Water Availability
- Reliability of Supplemental Source
- Cost
- Operational Constraints
- Permitting & Stakeholder Requirements/Constraints
- Environmental, Recreational and Water Quality
Impacts
- Timeline for Supply Availability
3
SLIDE 4
Cu Curr rrent nt Tasks s
SLIDE 5
Tri ri-St State ate Water er De Dema mand nd Ne Need eds s
SLIDE 6 What does “reallocation” mean?
*Graphic supplied by the USACE Kansas City District
SLIDE 7
What does “reallocation” mean?
SLIDE 8
Ove vera rall ll Pr Proce cess ss / Task k Sc Schedule ule
SLIDE 9 Hydraulic Modeling of Options
- Pipe Sizing
- Pump Station Sizing
- Tank Size and Locations
- Water Treatment Plants
- Planning Level Cost Estimates
SLIDE 10
St Stockto kton Lake ke Water er Tra ransm smissio ission Sy System tem
SLIDE 11
St Stockto kton Lake ke Water er Tra ransm smissio ission Sy System tem
SLIDE 12
St Stockto kton Lake ke Water er Tra ransm smissio ission Sy System tem
SLIDE 13
Ta Tabl ble R e Rock ck Lake ke Wa Water er Tr Transm nsmiss issio ion Sy n Syst stem em
SLIDE 14
Ta Tabl ble R e Rock ck Lake ke Wa Water er Tr Transm nsmiss issio ion Sy n Syst stem em
SLIDE 15
Ta Tabl ble Ro e Rock ck Lake ke Wa Wate ter r Tr Trans nsmi missi ssion Sy n Syst stem em
SLIDE 16 Next Steps
- Environmental impacts for Stockton Lake Reallocation
- Data Collection of existing environmental conditions at Pomme de Terre
Lake
- Environmental impacts for Pomme de Terre Lake
- Continue Reallocation Studies
Floodplain Wetlands
SLIDE 17