NRO Open-use Tomofumi Umemoto (NRO) Call for Proposals 2750 hrs - - PowerPoint PPT Presentation
NRO Open-use Tomofumi Umemoto (NRO) Call for Proposals 2750 hrs - - PowerPoint PPT Presentation
NRO Open-use Tomofumi Umemoto (NRO) Call for Proposals 2750 hrs for open-use including VLBI H22, H40, Z45, T70 and FOREST open Spectral Window Mode opens only for FOREST Dump Ume for OTF mode is allowed to be not only 0.1s but
December 27, 2018
Call for Proposals
2
- 2750 hrs for open-use including VLBI
- H22, H40, Z45, T70 and FOREST open
- Spectral Window Mode opens only for FOREST
- Dump Ume for OTF mode is allowed to be not only 0.1s but
0.04s
- Not open for Joint with ASTE telescope
- Remote observaUon from limited UniversiUes in Japan,
Mitaka, ASIAA/Taiwan, and KASI/Korea is allowed
- Simultaneous observaUon of H22/H40 is offered from
semester 2018B
ALMA/NRO/ASTE Users MeeUng
December 27, 2018
2018-2019 System
3 ALMA/NRO/ASTE Users MeeUng
December 27, 2018
New mm/sbmm TAC members (2018-
4
- Chair: Yoichi Tamura (Nagoya Univ.)
- Miju Kang (KASI/Korea)
- Naomi Hirano (ASIAA/Taiwan)
- Sachiko Onodera (Meisei Univ.)
- Takeshi Sakai (Univ. of Electro-CommunicaUons)
- Oct 11th, 2018 (1st meeUng), Jan 8th, 2019(next
meeUng)
ALMA/NRO/ASTE Users MeeUng
December 27, 2018
Open-Use: Schedule
5 ALMA/NRO/ASTE Users MeeUng
8/1 Call for Proposal 9/1 Deadline 9/10 Send proposals to referee 10/11 TAC 12/15 Start NRO 45-m open-use 11/1 Call for Proposal 12/1 Deadline 12/10 Send proposals to referee 1/8 TAC 5/15 End NRO 45-m open-use
We have two deadlines also including short programs, but one deadline for Large and Backup programs.
December 27, 2018
Open-Use: Proposals
6 ALMA/NRO/ASTE Users MeeUng
Category Submi.ed Accepted General 25+21=46 (55) 11+ (26) Joint
- (-)
- (-)
Short 2+8=10 (12) 1+ (9) Backup* 2 (1) 2 (1) Large >200 hr 3 (1) 1 (1) +1** DDT 0 (0) + (0) Total 32+29=61 (69) 16+(37) GTO 0 (2) 0 (2) Foreign countries 9+16=25 (21) 3+ (11)
2018-2019 (2017-2018) *DomesUc only **accepted in 2017 # Proposals from foreign countries for 2018A was 9, and we received 16 for 2018B # Proposals for 2017 was 69, but we received 61 for 2018 (~88%) 2018A 2018B
December 27, 2018
LST range distribuUon
7 ALMA/NRO/ASTE Users MeeUng
50 100 150 200 250 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
Hour LST[Hour] 2017-2018 Requested/Accepetd Time (NRO45m)
Requested Accepted Carry over
Range of LST =8 - 16 hr was largely undersubscribed in semester 2018A G.C.
Proposals TransiUon
8
Proposal # 20 40 60 80 100 120 2012 2013 2014 2015 2016 2017 2018
General Short Back-up Joint DDT Edu Large
20 40 60 80 100 120
2012 2013 2014 2015 2016 2017
Approved
←ALMA cycle 1 ←One deadline
Foreign Proposals TransiUon
9
Proposal # 20 40 60 80 100 120 2012 2013 2014 2015 2016 2017 2018
Domestic Foreign
20 40 60 80 100 120
2012 2013 2014 2015 2016 2017
Approved Foreign
Convert to CASA
10
- Not yet open the analysis in CASA
– It is necessary to apply a special merge for analysis
- If you want to use, ex., we need to parUcipate
in risk sharing including test & evaluaUon as a cooperaUon for us
- Please let me know directly to Umemoto or