New Latrobe Elementary School Greater Latrobe Partners in Education Foundation 2.0 10.06.2016 LES Facility Assessment Report Commissioned - October 2014 Schedule & Design Process From Program to Commissioning Project Goals &


slide-1
SLIDE 1

New Latrobe Elementary School

Greater Latrobe Partners in Education Foundation • 2.0 10.06.2016

slide-2
SLIDE 2

Overview

LES Facility Assessment Report

Commissioned - October 2014

Schedule & Design Process

From Program to Commissioning

Project Goals & Objectives

Exceptional community asset for generations

Site Plan

Location, Safety, Sustainability

Building Plans

21st-century-focused educational spaces

slide-3
SLIDE 3

LES Facility Assessment Report

Architectural Issues

  • Code & Safety
  • Building Envelope
  • Structure
  • MEPT
  • Aesthetics & Finishes
  • Education / Curriculum
slide-4
SLIDE 4

Schedule & Design Process

slide-5
SLIDE 5

Aug - Nov 2015 Project Authorization, Project Logistics, Land Purchase, Approval by Board Dec - Jun 2016 Authorization to Proceed, Programming, Schematic Design, Design Development Jul - Dec 2016 Construction Documents, Permits, Contract Documents, Authorization to Bid Jan - Mar 2017 Bid Award, Ground Breaking, Start of Construction School Year 2018 - 2019 GRAND OPENING

slide-6
SLIDE 6

Project Goals & Objectives

slide-7
SLIDE 7

Site Design & Goals

Location

Located based on proximity to student population Community based - available for recreation and congregation Accommodate all modes of transportation, 50% non-bus

Safety & Security

Separation of traffic flow on and off-site Curb cuts off main streets (Ligonier and Lincoln) Adequate parking for staff, visitors, drop-off lanes, bus lanes

Sustainability

Outdoor Play & Educational Spaces Maintain site greenery, integrate with walking path Building orientation, daylighting, energy efficiencies

slide-8
SLIDE 8
slide-9
SLIDE 9

Building Plans & Goals

Common / Public Spaces

  • Gymnasium with seating for 500 (Assembly Use)
  • Large cafeteria with full-size performance Stage
  • Not Corridors but “gallery spaces”
  • Center for Student Creativity
  • Circulation visible with passive security / supervision
slide-10
SLIDE 10

Building Plans & Goals

Encore Learning Spaces

  • Celebrate the creative and performing arts
  • Centered within the Building
  • Extension of classroom into “gallery spaces”
  • Integral to special and community events
  • Allow integration into other subjects
slide-11
SLIDE 11

Building Plans & Goals

Academic Core / Classroom “Suites”

  • Extended Learning Environments “ELA”
  • Gone away is the traditional corridor
  • Foster collaboration and flexibility
  • Expansion of the classroom
  • Lead to varied learning environments
slide-12
SLIDE 12
slide-13
SLIDE 13
slide-14
SLIDE 14

Academic Suite

slide-15
SLIDE 15

Interior Design Goals

Interiors make a BIG difference

  • Impactful, attractive, and vibrant environment
  • Thoughtful selections for light, color, and texture
  • Flexible, adaptive, moveable furniture
  • Sustainable and quality materials, finishes and fixtures
  • Primary building focal points, Gallery spaces and the CSC
slide-16
SLIDE 16

LES - Center for Student Creativity

As a building focal point, the CSC hinges from the main

  • entrance. The over-scaled single-slope roof slab and

large clerestory faces a primary thoroughfare, announcing the school’s presence and inviting residents in to make the most of this valuable community asset.

slide-17
SLIDE 17

“Gallery” spaces define circulation

The building circulation is clear, and intuitive, embracing the feel of an open art gallery, with high ceilings, prominent display areas and break-out space with views to the courtyard where students and community can gather to exhibit works and smaller exhibitions.

slide-18
SLIDE 18

Exterior Design Goals

Innovated - Reflect Tradition

  • Traditional materials with contemporary detailing
  • Create a distinctive presence
  • Neighborhood regional context
  • Sustainable and high-performing materials
slide-19
SLIDE 19

Southwest Birdseye

slide-20
SLIDE 20

Southeast Birdseye

slide-21
SLIDE 21

Southwest Perspective

(Corner of Ligonier & Cedar Streets)

slide-22
SLIDE 22

Main Entrance

slide-23
SLIDE 23

Event Entrance

slide-24
SLIDE 24

Next Steps

1. Completion of Design Phases 2. Board Authorization to Bid 3. Move-in!