STAKEHOLDER COMMITTEE MEETING #1 STAKEHOLDER COMMITTEE MEETING #1 May 30, 2019 AGENDA AGENDA 1. Welcome & Introductions 1. Welcome & Introductions 2. Study Overview and Schedule Update 2. Study Overview and Schedule Update 3.


  1. STAKEHOLDER COMMITTEE MEETING #1 STAKEHOLDER COMMITTEE MEETING #1 May 30, 2019

  2. AGENDA AGENDA 1. Welcome & Introductions 1. Welcome & Introductions 2. Study Overview and Schedule Update 2. Study Overview and Schedule Update 3. Existing Conditions Overview 3. Existing Conditions Overview  Transportation elements and related patterns Transportation elements and related patterns  Drainage integration Drainage integration  Land Use/Scenario Building Land Use/Scenario Building 4. Stakeholder Priorities Exercise 4. Stakeholder Priorities Exercise 6. GO Bond Sidewalk Discussion 6. GO Bond Sidewalk Discussion

  3. STUDY AREA STUDY AREA

  4. INFRASTRUCTURE INVESTIGATIONS INFRASTRUCTURE INVESTIGATIONS NORTHERN CROSSING NORTHERN CROSSING 44TH CONNECTION 44TH CONNECTION I- 25 INTERCHANGE/38TH 25 INTERCHANGE/38TH

  5. STUDY COMPLEXITY STUDY COMPLEXITY CHANGING LAND USE & DEVELOPMENT PRESSURE CHANGING LAND USE & DEVELOPMENT PRESSURE LIMITED VEHICULAR ACCESS LIMITED VEHICULAR ACCESS MIX of TRANSIT, TDM and PARKING MIX of TRANSIT, TDM and PARKING NEIGHBORHOOD SENSITIVITIES NEIGHBORHOOD SENSITIVITIES NEEDED STORMWATER & DRAINAGE IMPROVEMENTS NEEDED STORMWATER & DRAINAGE IMPROVEMENTS

  6. TEAM INTRODUCTIONS TEAM INTRODUCTIONS

  7. STUDY SCHEDULE STUDY SCHEDULE

  8. PHASE 1 COMPLETION PHASE 1 COMPLETION Previous Plan Review • City Project Management Team • Public Outreach Strategy • Formation of Stakeholder Committee • Executive Kick-off with NDCC Steering Committee – April 3 rd • Stakeholder and PMT Tour – April

  9. STAKEHOLDER COMMITTEE TOUR STAKEHOLDER COMMITTEE TOUR Foster a collaborative working environment for stakeholders and PMT Discuss study goals and area opportunities/constraints Learn from our stakeholders’ unique perspectives and knowledge base

  10. TOUR INSPIRED CONSIDERATIONS TOUR INSPIRED CONSIDERATIONS • 41 ST and Fox is also Globeville • Local employment within neighborhood Neighborhood – need to maintain that is critical– is it part of our current TDM context and future development footprint? Do we retain? should relate to neighborhood • Affordable housing: maintain or build • Need for green/park space within new? What is our affordable housing future footprint (41 st pocket park? element? Other?) • Barcelona superblock concept relating transportation and land use prioritization

  11. TRANSPORTATION TRANSPORTATION

  12. TRANSPORTATION: ADT TRANSPORTATION: ADT 48TH AVE 48TH AVE 25 JASON ST JASON ST 47TH AVE 47TH AVE INCA ST INCA ST 46TH AVE 46TH AVE ST ELATI ST 70 FOX ST FOX ST ELATI 45TH AVE 45TH AVE 45TH AVE 45TH AVE 44TH AVE 44TH AVE 44TH AVE 44TH AVE 43RD AVE 43RD AVE 43RD AVE 43RD AVE 42ND AVE 42ND AVE LIPAN ST LIPAN ST 41ST AVE 41ST AVE 40TH AVE 40TH AVE 8,300 8,300 39TH AVE 39TH AVE 15,300 15,300 38TH AVE 38TH AVE 20,600 20,600 NAVAJO ST NAVAJO ST PECOS ST PECOS ST 21,200 21,200 LOCAL LOCAL 8,300 8,300 COLLECTOR COLLECTOR PARK PARK ARTERIAL ARTERIAL

  13. 38TH & FOX 38TH & FOX FOX FOX I- 25 SB 25 SB 38TH 38TH PARK PARK

  14. SIDEWALKS SIDEWALKS 48TH AVE 48TH AVE 25 JASON ST JASON ST 47TH AVE 47TH AVE INCA ST INCA ST 46TH AVE 46TH AVE ST ELATI ST 70 FOX ST FOX ST ELATI 45TH AVE 45TH AVE 45TH AVE 45TH AVE 44TH AVE 44TH AVE 44TH AVE 44TH AVE 43RD AVE 43RD AVE 43RD AVE 43RD AVE 42ND AVE 42ND AVE PRIORITY PRIORITY LIPAN ST LIPAN ST 41ST AVE 41ST AVE 40TH AVE 40TH AVE 39TH AVE 39TH AVE 38TH AVE 38TH AVE NAVAJO ST NAVAJO ST PECOS ST PECOS ST IN PLACE IN PLACE MISSING MISSING PARK PARK 10 MIN WALK 10 MIN WALK

  15. BIKE NETWORK | PROPOSED BIKE NETWORK | PROPOSED 48TH AVE 48TH AVE 25 JASON ST JASON ST 47TH AVE 47TH AVE INCA ST INCA ST 46TH AVE 46TH AVE ELATI ST ST 70 FOX ST FOX ST ELATI 45TH AVE 45TH AVE 45TH AVE 45TH AVE 44TH AVE 44TH AVE 44TH AVE 44TH AVE 43RD AVE 43RD AVE 43RD AVE 43RD AVE 42ND AVE 42ND AVE LIPAN ST LIPAN ST LINCOLN LINCOLN WASH. WASH. 41ST AVE 41ST AVE 40TH AVE 40TH AVE 39TH AVE 39TH AVE EXISTING EXISTING PROPOSED PROPOSED 38TH AVE 38TH AVE BIKE LANE BIKE LANE BIKE LANE BIKE LANE NAVAJO ST NAVAJO ST PECOS ST PECOS ST ROUTE ROUTE NHBD BIKE WAY NHBD BIKE WAY SHARED PATH SHARED PATH SHARED PATH SHARED PATH PARK PARK NEEDS STUDY NEEDS STUDY REG TRAIL REG TRAIL

  16. FOX STREET TODAY FOX STREET TODAY

  17. Fox North Infrastructure Master Plan Fox Street 80’ ROW – Parking on Both Sides

  18. TRANSIT & SHARED SYSTEMS TRANSIT & SHARED SYSTEMS 48TH AVE 48TH AVE 25 JASON ST JASON ST 47TH AVE 47TH AVE INCA ST INCA ST 46TH AVE 46TH AVE ELATI ST ST 70 FOX ST FOX ST ELATI 45TH AVE 45TH AVE 45TH AVE 45TH AVE 44TH AVE 44TH AVE 44TH AVE 44TH AVE 43RD AVE 43RD AVE 43RD AVE 43RD AVE 42ND AVE 42ND AVE LIPAN ST LIPAN ST 41ST AVE 41ST AVE 500 PARKING SPACES 500 PARKING SPACES 40TH AVE 40TH AVE 39TH AVE 39TH AVE 38TH AVE 38TH AVE NAVAJO ST NAVAJO ST PECOS ST PECOS ST RTD BUS RTD BUS PARK PARK B B CYCLE B CYCLE

  19. NORTHERN BRIDGE NORTHERN BRIDGE

  20. 47TH AVE BRIDGE SECTION 47TH AVE BRIDGE SECTION

  21. 44TH AVE BRIDGE 44TH AVE BRIDGE

  22. 44TH AVE BRIDGE 44TH AVE BRIDGE LOOKING EAST LOOKING EAST

  23. Existing Drainage Patterns Existing Drainage Patterns

  24. Existing Drainage System Existing Drainage System

  25. Existing Drainage Issues Existing Drainage Issues

  26. Proposed Improvements Proposed Improvements – OSP OSP

  27. Proposed Improvements Proposed Improvements – 1st Phase 1st Phase

  28. Proposed Improvements Proposed Improvements – Other Other

  29. DRAINAGE | 38TH UNDERPASS DRAINAGE | 38TH UNDERPASS

  30. LAND USE LAND USE

  31. TOD Strategic Plan (2014) TOD Strategic Plan (2014)

  32. Blueprint Denver (2019) Blueprint Denver (2019)

  33. LAND USE LAND USE

  34. Existing Plus Planned Development

  35. Station Area Plan Development Existing Plus Planned Development

  36. Hybrid Development Scenario Station Area Plan Development Existing Plus Planned Development

  37. STAKEHOLDER PRIORITIES EXERCISE STAKEHOLDER PRIORITIES EXERCISE

  38. AREA PLANNING GOALS AREA PLANNING GOALS 41ST & FOX STATION AREA PLAN (2009) 41ST & FOX STATION AREA PLAN (2009) GLOBEVILLE NEIGHBORHOOD PLAN (2014) GLOBEVILLE NEIGHBORHOOD PLAN (2014) • Improve pedestrian connections to the • Reinforce and enhance Globeville’s unique station, between neighborhoods, and along sense of place major corridors • Effective storm drainage and WQ • Create opportunities to add more housing management for a variety of income levels, jobs and • Improve access to jobs, housing, services, services to the station area and education • Incorporate plazas, parks and open space • A connected street network into redevelopment areas • A walkable, bikeable, and transit -rich • Capitalize on the station area’s proximity to Globeville Downtown and location on the Gold Line and Northwest Rail corridors • Address traffic operations and roadway maintenance issues • Balance the needs of new development and existing uses

  39. CCD SIDEWALKS DISCUSSION

  40. THANK YOU THANK YOU

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.